1508
|
Wednesday, April 26, 2017, 16:52 |
Aurelia Laxdal | South Hot-Cell | Repair | TM3 | | TM3 Lower Service Tray Video Inspection |
|
|
1509
|
Wednesday, April 26, 2017, 17:37 |
Aurelia Laxdal | South Hot-Cell | Repair | TM3 | no target | TM3 HV tests at atmosphere Pictures from April 19-21, 2017 |
Please see the first two pictures
of the HV test at atmosphere done on April |
|
1510
|
Wednesday, April 26, 2017, 17:55 |
Aurelia Laxdal | South Hot-Cell | Repair | TM3 | no target | TM3 Schedule updates at the South Hot Cell and CS | Please see TM3's Updated Schedule (the
current schedule) at the SHC and TCS.
For the record I am uploading TM3's |
|
1512
|
Thursday, April 27, 2017, 19:59 |
Aurelia Laxdal | South Hot-Cell | Repair | TM3 | no target | TM3 HV tests at atmosphere for Each Line(s) April 27, 2017 | Today a HV test at atmosphere was performed
for Each Line(s), while floating the other
lines. |
|
1514
|
Sunday, April 30, 2017, 20:57 |
Aurelia Laxdal | South Hot-Cell | Repair | TM3 | no target | TM3 May 1-15, 2017 Tentative Schedule at the SHC and TCS | Please see attachment for TM3 May 1-15,
2017 Tentative Schedule at the SHC and TCS. |
|
1515
|
Monday, May 01, 2017, 08:53 |
chad fisher | South Hot-Cell | Repair | TM3 | | Fiberglass removal | Fiberglass, capton tape and tie straps
have been removed from TM3. |
|
1517
|
Monday, May 01, 2017, 13:11 |
David Wang | South Hot-Cell | Repair | TM3 | | Electrical Check on TM3 after fibergalss is moved in SHC. | RU( coil 1), F (anode), and 60kv bias(HS,
Gasline, and MSP) are shorted together.
Other lines are good. They are measured |
|
1520
|
Tuesday, May 02, 2017, 18:33 |
Aurelia Laxdal | South Hot-Cell | Repair | TM3 | no target | TM3 HV tests at atmosphere for Each Line(s) after the Fiber Glass removal May 2, 2017 | Today a HV test at atmosphere was performed
for Each Line(s), while floating the other
lines. THIS TEST AT ATMOSPHERE IS THE FIRST |
|
1521
|
Thursday, May 04, 2017, 14:06 |
David Wang | Conditioning Station | Repair | TM3 | | A vacuum to air leak on TM3 service cap round side panel was found and fixed.. | During TM3 roughing down yesterday afternoon,The
vacuum gauges CG1 and CG1S stopped at 1.20
torr and refused to drop down. Leak detector |
|
1522
|
Thursday, May 04, 2017, 19:10 |
Aurelia Laxdal | Conditioning Station | Repair | TM3 | no target | TM3 HV test at TCS up to 50kV | Today TM3 was conditioned up to 50kV. At
50kV sparking started and to go higher in
voltage it needs more conditioning time. |
|
1523
|
Friday, May 05, 2017, 11:06 |
David Wang | Crane | Standard Operation | TM3 | | TH crane is used for 5 shielding blocks transferring. | TH crane is used for transferring
five shielding blocks(30000lbs) today. All
brakes work fine. Mostly, I do not need |
|
1524
|
Friday, May 05, 2017, 11:53 |
David Wang | Conditioning Station | Repair | TM3 | | sparking on TM3 serice cap top. | Sparking was found this morning inside
HV cover on TCS in TH while TM3 was HV conditioning
at TCS. The TCS bias was set to 50KV when |
|
1525
|
Friday, May 05, 2017, 19:36 |
Aurelia Laxdal | Conditioning Station | Repair | TM3 | no target | TM3 HV test at TCS up to 65kV | Today TM3 HV conditioning went up to 65kV.
I'll leave it here over night. ISAC OPS have
instructions to keep an alarm on the HV, |
|
1526
|
Saturday, May 06, 2017, 13:30 |
Aurelia Laxdal | Conditioning Station | Repair | TM3 | no target | TM3 current limiting | Today the voltage was raised from 65kV
to 65.7kV. After about 10min at this level
TM3 started current limiting. TM3 was not |
|
1529
|
Tuesday, May 09, 2017, 07:00 |
David Wang | Conditioning Station | Repair | TM3 | | Follow up Aurelia's entry, TM3 and TCS current limits investigation. | Aurelia and I investigated this current
limit issue May 8th. First, By separating
TM3 from TCS. we found the problem is on |
|
1530
|
Tuesday, May 09, 2017, 12:45 |
David Wang | Conditioning Station | Repair | TM3 | | TM3 service tray side panel is cleaned and installed back to TM3 | TM3 service tray side panel is cleaned
and installed back to TM3 this morning. I
visually inspected service tray insulators. |
|
1583
|
Thursday, July 13, 2017, 10:53 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | Module move | TM#3 has been moved from the north
east silo to the conditioning station. |
|
1584
|
Monday, July 17, 2017, 16:28 |
Anders Mjos | Conditioning Station | Development | TM3 | No target | Conditioning TM3 | 50 kV stable with less than 1 spark/h during
the weekend by RIB obs.
Today 57 kV reached, but observed |
|
1585
|
Monday, July 17, 2017, 17:50 |
Aurelia Laxdal | Conditioning Station | Development | TM3 | No target | Conditioning TM3 |
|
|
1587
|
Tuesday, July 18, 2017, 16:53 |
Anders Mjos | Conditioning Station | Development | TM3 | No target | Conditioning TM3 | Conditioning continues today with resistors
removed from the HV cable
Tuesday, July 18, 2017, 16:53: BIAS |
|