Tuesday, September 29, 2020, 12:29, Travis Cave, ITE, Standard Operation, TM4, UC#31, Module move
|
Module move of TM#4 with UC#31 was finished to today at around 10:30AM. |
Wednesday, September 30, 2020, 09:54, Travis Cave, South Hot-Cell, Standard Operation, TM3, no target, Module move
|
TM#3 is now in the south hot cell. |
Tuesday, October 13, 2020, 10:16, Travis Cave, ITE, Repair, TM4, UC#31, Module move
|
TM#4 is now in the south hot cell from the east target station. |
Thursday, October 15, 2020, 12:48, Travis Cave, ITE, Standard Operation, TM4, UC#31, Module move
|
TM#4 is now back in the east target station. |
Friday, October 16, 2020, 10:36, Travis Cave, ITW, Standard Operation, TM2, Ta#60, Module move
|
TM#2 with Ta#60 is now in the south hot cell. |
Tuesday, October 20, 2020, 10:14, Travis Cave, ITW, Standard Operation, TM2, C#2, Module move
|
TM#2 with C#2 has been moved from the south hot cell to the West Target Station. |
Friday, October 30, 2020, 09:02, Travis Cave, Spent Target Vault, Standard Operation, , Ta#48,51,54 SiC#35, and UC#25, Repacking of the targets.
|
Targets Ta#48,51,54 SiC#35, and UC#25 were repacked and placed in the mini vault. In the following order back to front. SiC#35 (240), Ta#54(241), UC#25(244), Ta#48(243), Ta#51(242).
Also during this repacking Ta#60 was also placed in the Spent Target Vault in spot 7B in pail# 239. |
Tuesday, November 03, 2020, 10:52, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#31, Module move
|
TM#4 with UC#31 has been moved from the east target station to the south hot cell. |
Thursday, November 05, 2020, 10:48, Travis Cave, ITE, Standard Operation, TM4, Ta#61, Module move
|
TM#4 with Ta#61 has been moved from the south hot cell to the east target station. |
Thursday, November 12, 2020, 10:02, Travis Cave, Spent Target Vault, Standard Operation, , UC#31, Spent Target Move
|
UC#31 has been moved from the south hot cell to the spent target vault. It is in spot 8B of the vault in pail # 224 and was 3.71mSv/hr upon removal from the south hot cell. |
Friday, January 08, 2021, 09:40, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#61, Module move
|
TM#4 with Ta#61 has been moved from the east target station to the south hot cell. |
Tuesday, January 19, 2021, 11:32, Travis Cave, Safe Module Parking, Standard Operation, TM2, Nb#9, Module move
|
TM#2 with Nb#9 was moved from ITW to SHC and then with no target it was moved from the SHC to the SMP. |
Friday, March 12, 2021, 11:36, Travis Cave, South Hot-Cell, Maintenance, , East Entrance Module, Entrance module move
|
The East Entrance Module has been moved from the East Target Station to the South Hot Cell. |
Wednesday, March 17, 2021, 09:10, Travis Cave, ITE, Standard Operation, , , Entrance module move
|
The east entrance module is now back at the east target station. |
Wednesday, June 09, 2021, 09:16, Travis Cave, North Hot-Cell, Standard Operation, TM2, no target, Module move
|
TM#2 has been moved from the SHC to the NHC. |
Friday, August 06, 2021, 11:52, Travis Cave, North Hot-Cell, Standard Operation, , UC#33, Spent Target Move
|
UC#33 has been packed and moved from the north hot cell to the spent target vault. See attached PDF for
deatails |
Tuesday, September 14, 2021, 09:18, Travis Cave, South Hot-Cell, Repair, TM4, SiC#40, Module move
|
TM#4 with SiC#40 has been moved from the east target station to the south hot cell. |
Wednesday, September 15, 2021, 08:39, Travis Cave, ITE, Standard Operation, TM4, SiC#41, Module move
|
TM#4 with SiC#41 has been moved from the NHC to ITE. |
Friday, September 17, 2021, 14:28, Travis Cave, Spent Target Vault, Standard Operation, , Ta#62, Spent Target Move
|
The spent Ta#62 target along with 2A2M19 were placed in pail #256 and placed in spot 7A of the spent target vault. See attached PDF for vault details. |
Tuesday, September 21, 2021, 13:47, Travis Cave, North Hot-Cell, Standard Operation, TM2, UC#34, Module move
|
TM#2 with UC#34 has been moved from ITW to the north hot cell had the target removed and then moved to the south west silo. |
|