ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
2177
|
Friday, January 08, 2021, 09:40 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#61 | Module move |
TM#4 with Ta#61 has been moved from the east target station to the south hot cell. |
2179
|
Tuesday, January 19, 2021, 11:32 |
Travis Cave | Safe Module Parking | Standard Operation | TM2 | Nb#9 | Module move |
TM#2 with Nb#9 was moved from ITW to SHC and then with no target it was moved from the SHC to the SMP. |
2199
|
Friday, March 12, 2021, 11:36 |
Travis Cave | South Hot-Cell | Maintenance | | East Entrance Module | Entrance module move |
The East Entrance Module has been moved from the East Target Station to the South Hot Cell. |
2201
|
Wednesday, March 17, 2021, 09:10 |
Travis Cave | ITE | Standard Operation | | | Entrance module move |
The east entrance module is now back at the east target station. |
2224
|
Wednesday, June 09, 2021, 09:16 |
Travis Cave | North Hot-Cell | Standard Operation | TM2 | no target | Module move |
TM#2 has been moved from the SHC to the NHC. |
2239
|
Friday, August 06, 2021, 11:52 |
Travis Cave | North Hot-Cell | Standard Operation | | UC#33 | Spent Target Move |
UC#33 has been packed and moved from the north hot cell to the spent target vault. See attached PDF for
deatails |
Attachment 1: Target_Index_2021-08-06.pdf
|
|
2243
|
Tuesday, September 14, 2021, 09:18 |
Travis Cave | South Hot-Cell | Repair | TM4 | SiC#40 | Module move |
TM#4 with SiC#40 has been moved from the east target station to the south hot cell. |
2244
|
Wednesday, September 15, 2021, 08:39 |
Travis Cave | ITE | Standard Operation | TM4 | SiC#41 | Module move |
TM#4 with SiC#41 has been moved from the NHC to ITE. |
2247
|
Friday, September 17, 2021, 14:28 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#62 | Spent Target Move |
The spent Ta#62 target along with 2A2M19 were placed in pail #256 and placed in spot 7A of the spent target vault. See attached PDF for vault details. |
Attachment 1: Target_Index_2021-09-17.pdf
|
|
2248
|
Tuesday, September 21, 2021, 13:47 |
Travis Cave | North Hot-Cell | Standard Operation | TM2 | UC#34 | Module move |
TM#2 with UC#34 has been moved from ITW to the north hot cell had the target removed and then moved to the south west silo. |
2249
|
Wednesday, September 22, 2021, 11:13 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#34 | Spent Target Move |
The spent UC#34 target was moved from the north hot cell to the spent target vault. See attached PDF for details. |
Attachment 1: Target_Index_2021-09-22.pdf
|
|
2251
|
Monday, September 27, 2021, 14:29 |
Travis Cave | ITW | Standard Operation | TM2 | Graphite #3 | Module move |
TM#2 with C#3 has been moved from the north hot cell to ITW. Also for the up coming site wide power outage, the ISAC Target Hall crane has been turned off and powered down, also the remote crane console has also been power down as well so that mean no ISAC TV for a few days. |
2255
|
Monday, October 04, 2021, 10:52 |
Travis Cave | North Hot-Cell | Standard Operation | TM4 | SiC#41 | Module move |
TM#2 moved from ITE to NHC SiC#41 removed and then moved back to ITE. |
2259
|
Wednesday, October 13, 2021, 11:54 |
Travis Cave | North Hot-Cell | Standard Operation | | SiC#41 | Spent Target Move |
The spent SiC#41 target has been placed in pail #260 and placed in spot 5B of that spent target vault. See attached PDF for details. |
Attachment 1: Target_Index_2021-10-13.pdf
|
|
2261
|
Friday, October 29, 2021, 12:27 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#56 | Repacking of the target. |
Ta#56 in pail #169 was repacked and placed into #269 and was placed in the mini vault at the back. It was 3.86mSv/hr upon removal from the NHC. See attached files for details. |
Attachment 1: Target_Index_2021-10-29.pdf
|
|
Attachment 2: Target_Index_2021-10-29_mini_vault.pdf
|
|
2266
|
Wednesday, November 10, 2021, 11:06 |
Travis Cave | Spent Target Vault | Standard Operation | | C#3 | Spent Target Move |
The spent C#3 target has been moved from the south hot cell to the spent target vault it was placed in pail #270 and put in spot 2C of the vault. See attached PDF for more details. |
Attachment 1: Target_Index_2021-11-10.pdf
|
|
2267
|
Monday, November 15, 2021, 12:00 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#53 | Repacking of the target. |
Ta#53 was repacked and placed in the mini vault it was changed from pail#164 to pail#262. See attached PDF for further details. |
Attachment 1: Target_Index_2021-11-15.pdf
|
|
Attachment 2: Target_Index_2021-11-15_mini_vault.pdf
|
|
2269
|
Wednesday, November 17, 2021, 11:42 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#57 | Repacking of the targets. |
Ta#57 was repacked and placed in the mini vault. The pail was changed from #174 to #263. See attached PDF for more details. |
Attachment 1: Target_Index_2021-11-17.pdf
|
|
Attachment 2: Target_Index_2021-11-17_mini_vault.pdf
|
|
2270
|
Thursday, November 18, 2021, 09:47 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#38 and UC#29 | Spent Target Move |
The spent targets SiC#38 and UC#29 have been removed from the spent target vault and placed into the mini storage. See attached PDF for details. |
Attachment 1: Target_Index_2021-11-18.pdf
|
|
Attachment 2: Target_Index_2021-11-18_mini_vault.pdf
|
|
2290
|
Wednesday, January 12, 2022, 14:09 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#36 | Spent Target Move |
The spent UC#36 target in the north hot cell has been removed and placed in the spent target vault. See attached PDF for detail note that the PDF does not show that spot 2B is occupied by the 2A3M20 pail. |
Attachment 1: Target_Index_2022-01-12.pdf
|
|