ID Date Author Categorydown Type Module Target/Number Subject Text Attachments
  2062   Wednesday, February 05, 2020, 11:03 David WangSouth Hot-CellStandard OperationTM4UCx 29UCx 29 post run electrical checkUCx 29 TM4 post run electrical check is
done before target is removed. Everything
is normal on measurements.
 UCx29_post_run_electrical_check..pdf 
  2064   Thursday, February 06, 2020, 13:32 Adam NewsomeSouth Hot-CellMaintenanceTM4 TM4 moved from Conditioning Station to South Hot Cell TM4 was moved from conditioning station
to south hot cell in preparation for wiring
replacement. No target.
  
  2065   Friday, February 07, 2020, 08:05 chad fisherSouth Hot-CellDevelopmentTM4 Containment box off for IGLISThe containment box has been removed from
TM4 in prep for the IGLIS wiring job.
  
  2068   Friday, February 14, 2020, 14:13 David WangSouth Hot-CellStandard OperationTM4 SIS dummy target for IGLIS TM4 electrical checkElectrical check and HS, window leak check
result at SHC. See attachment.
 Dumm_SIS_target_for_IGLIS_test_on_TM4.pdf 
  2077   Thursday, March 05, 2020, 07:16 David WangSouth Hot-CellStandard OperationTM2SiC #39TM2 SiC #39 post run electrical checklist  Electrical check result is fine. 
See attachment.
 SiC_#39_post_run_cheklist..pdf 
  2079   Friday, March 06, 2020, 09:51 David WangSouth Hot-CellStandard OperationTM2 TM2 was moved from SHC to SMP yesterday.TM2 was moved from SHC to SMP yesterday. 
The move is successful. TM2 is located at
SMP. There is no hot target on module so
  
  2085   Monday, March 16, 2020, 09:25 Travis CaveSouth Hot-CellStandard OperationTM4no targetModule move TM#4 has been moved from the silo
to the south hot cell.
  
  2087   Tuesday, March 17, 2020, 12:58 David WangSouth Hot-CellDevelopmentTM4 P2N target electrical check and leak check at SHC.See attachment. Everything looks good.
 P2N_target_electrical_chek_at_SHC.pdf 
  2102   Tuesday, June 16, 2020, 09:37 Travis CaveSouth Hot-CellStandard OperationTM2no targetModule move TM#2 with no target has been moved
from the south west silo to the south hot
cell.
  
  2103   Wednesday, June 17, 2020, 09:49 chad fisherSouth Hot-CellStandard OperationTM4C#1C#1 installedTarget C#1 has been installed on TM4 with
new high current fasteners torqued to 130in
lbs.
 C#1_Target.jpg 
  2104   Wednesday, June 17, 2020, 09:53 David WangSouth Hot-CellStandard OperationTM2C#1C#1 target electrical check and leak check at SHC.Target to HS is 400 ohm. The rest check
is good. See attachment.
 C#1_target_electrical_and_leak_check.pdf 
  2114   Tuesday, June 30, 2020, 10:18 Travis CaveSouth Hot-CellStandard OperationTM4Test Proton to Neutron TargetModule move TM#4 has been moved from the east
target station to the south hot cell.
  
  2116   Friday, July 03, 2020, 07:03 David WangSouth Hot-CellStandard OperationTM4BEFORE TARGET INSTALLATIONELECTRICAL CHECK BEFORE TARGET INSTALLATION.PQ SHORT TO RU. A TO PQ 1.8 M OHM AT 500
V. THE REST ARE OL
 TM4_ELECTRICAL_CHECK_20220_07_02.pdf 
  2117   Friday, July 03, 2020, 08:46 chad fisherSouth Hot-CellStandard OperationTM4UcX#30UCx#30 installed onto tm4UCx#30 has been installed onto TM4 with
new high current fasteners torqued to 130
in lbs.
  
  2118   Friday, July 03, 2020, 13:23 David WangSouth Hot-CellStandard OperationTM4UCx#30TM4 UCx#30 Electrical check and HS leak checkElectrical and leak check are good. See
attachment. 
 TM4_UCx30_elctrical_and_leak_check_at_SHC..pdf 
  2128   Monday, July 27, 2020, 10:00 Travis CaveSouth Hot-CellMaintenance  Entrance module move The West Entrance module has been
moved from the west target station to the
south hot cell for repairs.
  
  2129   Tuesday, July 28, 2020, 09:26 chad fisherSouth Hot-CellRepair  Entrance Module Wire ScannerEntrance module wire scanner has been replaced.
Pictures to follow.
  
  2135   Wednesday, August 19, 2020, 10:17 Adam NewsomeSouth Hot-CellStandard Operation  ITW Entrance Module moved to SHCITW Entrance Module was moved from west
station to South Hot Cell.
  
  2137   Tuesday, August 25, 2020, 09:38 Travis CaveSouth Hot-CellStandard OperationTM2Graphite #1Module move TM#2 with Graphite #1 has been moved
from the conditioning station to the south
hot cell.
  
  2138   Wednesday, August 26, 2020, 09:52 David WangSouth Hot-CellStandard OperationTM2Ta#60Ta#60 target electrical check and leak check at SHC.Electrical check and leak check at SHC.
NO leak. electrical check ok.  
Before target on, A is short to PQ, RU is
 Ta_60_electrical_checklist.pdf 