  RH-ISAC, Page 47 of 138  Not logged in ELOG logo
Entry  Wednesday, February 05, 2020, 11:03, David Wang, South Hot-Cell, Standard Operation, TM4, UCx 29, UCx 29 post run electrical check UCx29_post_run_electrical_check..pdf
Entry  Thursday, February 06, 2020, 13:32, Adam Newsome, South Hot-Cell, Maintenance, TM4, , TM4 moved from Conditioning Station to South Hot Cell 
Entry  Friday, February 07, 2020, 08:05, chad fisher, South Hot-Cell, Development, TM4, , Containment box off for IGLIS 
Entry  Friday, February 14, 2020, 14:13, David Wang, South Hot-Cell, Standard Operation, TM4, , SIS dummy target for IGLIS TM4 electrical check Dumm_SIS_target_for_IGLIS_test_on_TM4.pdf
Entry  Thursday, March 05, 2020, 07:16, David Wang, South Hot-Cell, Standard Operation, TM2, SiC #39, TM2 SiC #39 post run electrical checklist  SiC_#39_post_run_cheklist..pdf
Entry  Friday, March 06, 2020, 09:51, David Wang, South Hot-Cell, Standard Operation, TM2, , TM2 was moved from SHC to SMP yesterday. 
Entry  Monday, March 16, 2020, 09:25, Travis Cave, South Hot-Cell, Standard Operation, TM4, no target, Module move 
Entry  Tuesday, March 17, 2020, 12:58, David Wang, South Hot-Cell, Development, TM4, , P2N target electrical check and leak check at SHC. P2N_target_electrical_chek_at_SHC.pdf
Entry  Tuesday, June 16, 2020, 09:37, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, Module move 
Entry  Wednesday, June 17, 2020, 09:49, chad fisher, South Hot-Cell, Standard Operation, TM4, C#1, C#1 installed C#1_Target.jpg
Entry  Wednesday, June 17, 2020, 09:53, David Wang, South Hot-Cell, Standard Operation, TM2, C#1, C#1 target electrical check and leak check at SHC. C#1_target_electrical_and_leak_check.pdf
Entry  Tuesday, June 30, 2020, 10:18, Travis Cave, South Hot-Cell, Standard Operation, TM4, Test Proton to Neutron Target, Module move 
Entry  Friday, July 03, 2020, 07:03, David Wang, South Hot-Cell, Standard Operation, TM4, BEFORE TARGET INSTALLATION, ELECTRICAL CHECK BEFORE TARGET INSTALLATION. TM4_ELECTRICAL_CHECK_20220_07_02.pdf
Entry  Friday, July 03, 2020, 08:46, chad fisher, South Hot-Cell, Standard Operation, TM4, UcX#30, UCx#30 installed onto tm4 
Entry  Friday, July 03, 2020, 13:23, David Wang, South Hot-Cell, Standard Operation, TM4, UCx#30, TM4 UCx#30 Electrical check and HS leak check TM4_UCx30_elctrical_and_leak_check_at_SHC..pdf
Entry  Monday, July 27, 2020, 10:00, Travis Cave, South Hot-Cell, Maintenance, , , Entrance module move 
Entry  Tuesday, July 28, 2020, 09:26, chad fisher, South Hot-Cell, Repair, , , Entrance Module Wire Scanner 
Entry  Wednesday, August 19, 2020, 10:17, Adam Newsome, South Hot-Cell, Standard Operation, , , ITW Entrance Module moved to SHC 
Entry  Tuesday, August 25, 2020, 09:38, Travis Cave, South Hot-Cell, Standard Operation, TM2, Graphite #1, Module move 
Entry  Wednesday, August 26, 2020, 09:52, David Wang, South Hot-Cell, Standard Operation, TM2, Ta#60, Ta#60 target electrical check and leak check at SHC. Ta_60_electrical_checklist.pdf