Entry  Wednesday, April 02, 2014, 09:14, Travis Cave, ITW, Standard Operation, TM4, Ta#42, module move 

TM#4 with Ta#42 has been moved to the west target station.

    Reply  Wednesday, April 16, 2014, 10:16, Anders Mjos, ITW, Development, TM3, Ta#42, Flow meters installed on Heat Shield and Coil water return 

 

Anders Mjos wrote:

David W. has installed two SST Proteus flow meters, model OV7006FTA32, on ITW Heat Shield and Coil. The flow meters are connected to a power supply and a data logger in the electrical room.

The Heat Shield flow meter has SN 00278112 and is on the Black wire pairs and connected to CH3 & CH4 on the logger.

The Coil flow meter has SN 00278113 and is on the Green wire pairs and connected to CH1 & CH2 on the logger.

The first channel (CH1, CH3) is temperature in degrees Celcius and the second channel (CH2, CH4) is flow rate in liters per minute.

A camera has been placed on the logger.

Flow rates today (2014-04-04):

HS        8.2 - 8.3 lpm
COIL    8.0 - 8.1 lpm

Calibration sheets


UPDATE 2014-04-11: Corrected HS to CH3 & CH4.

 

PDFs of temperature and flow traces are available on DocuShare

Monday, April 28, 2014, 09:27. p+ off since 8:20

  Temp [C] Flow [lpm]
HS 28.3 8.38
COIL 26.3 8.01

Tuesday, April 29, 2014, 09:28: p+ 30 uA

  Temp [C] Flow [lpm]
HS 31.7 8.40
COIL 27.6 8.13

Monday, May 05, 2014, 10:49: p+ off since 8:39
(Downloaded data and updated traces on DocuShare)

  Temp [C] Flow [lpm]
HS 27.1 8.47
COIL 26.6 8.11

 Wednesday, May 14, 2014
(Downloaded data and updated traces on DocuShare)

  Temp [C] Flow [lpm]
HS 33.5 7.7
COIL 29.0 7.5

 

Entry  Tuesday, May 27, 2014, 10:42, Travis Cave, ITW, Standard Operation, TM4, Ta#42, module move 

TM#4 with Ta#42 has been moved from  the west target station to the south hot cell.

Entry  Tuesday, May 27, 2014, 11:45, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#42, Electrical check TM4_Ta42_elec_chk_SHC_postbeam.PDF

TM#4 electrical check with Ta#42 attached post beam at the south hot cell.

Entry  Friday, May 30, 2014, 09:41, Travis Cave, Spent Target Vault, Standard Operation, , Ta#42, Spent target move Vault_Storage_May_30_2014.pdf

Ta#42 in pail #114 has been moved from the south hot cell to the spent target storage vault and place in spot 7B. The target was 277mSv/hr upon removal from the south hot cell. See attached PDF of vault status.

Entry  Thursday, October 24, 2013, 15:43, Anders Mjos, South Hot-Cell, Standard Operation, TM4, Ta#41, Target conductance Ta#41_electrical_measurement_TGHT_in_SHC.pdf

The conductance check on the electrical check was found to be outside of accepted values for the TBHT at 7.0 mOhm. A successful attempt to reduce the conductance was made by re-tightening the bolts on the TGHT legs in the SHC. Grant operated the manipulator and torqued the bolts to about 1/8 of a turn with the air ratchet. The conductance across the TGHT (A-B) could be improved from 7.0 mOhm to 6.2 mOhm by re-tightening the bolts. The value is still somewhat higher than usual, but was deemed to be acceptable. Measurements attached.

    Reply  Thursday, October 24, 2013, 15:54, Grant Minor, South Hot-Cell, Standard Operation, TM4, Ta#41, Target conductance 

Anders Mjos wrote:

The conductance check on the electrical check was found to be outside of accepted values for the TBHT at 7.0 mOhm. A successful attempt to reduce the conductance was made by re-tightening the bolts on the TGHT legs in the SHC. Grant operated the manipulator and torqued the bolts to about 1/8 of a turn with the air ratchet. The conductance across the TGHT (A-B) could be improved from 7.0 mOhm to 6.2 mOhm by re-tightening the bolts. The value is still somewhat higher than usual, but was deemed to be acceptable. Measurements attached.

1. TGHT leg bolts were loosened, and resistance was measured very high, as expected.

2. TGHT leg bolts were then tightened, loosened, and tightened again, and the resistance improvement was then measured (from 7.0 mOhm to 6.2 mOhm).

3. Another attempt was then made to loosen and tighten to see if there would be further improvement.  The right bolt was loosened, but the left bolt was found to be quite stiff and was left as-is (not fully loosened) for fear of breaking the supporting insulator.  Both bolts were then re-tightened, and resistance was checked to be about the same as achieved during the previous loosening / tightening attempt (step 2 above).

To tighten the bolts in all cases: the air ratchet was used first to turn the bolts "air tight" (air pedal only, no manual force) and then with the air pedal held down, manual torque was applied to turn no more than 1/8th of a turn.

Entry  Friday, October 25, 2013, 10:26, Travis Cave, ITW, Standard Operation, TM4, Ta#41, module move 

TM#4 with Ta#41 has been moved from the south hot cell to the west target station.

    Reply  Friday, October 25, 2013, 14:09, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#41, Target conductance TM#4_Ta#41_elec_test_SHC.PDF

Anders Mjos wrote:

The conductance check on the electrical check was found to be outside of accepted values for the TBHT at 7.0 mOhm. A successful attempt to reduce the conductance was made by re-tightening the bolts on the TGHT legs in the SHC. Grant operated the manipulator and torqued the bolts to about 1/8 of a turn with the air ratchet. The conductance across the TGHT (A-B) could be improved from 7.0 mOhm to 6.2 mOhm by re-tightening the bolts. The value is still somewhat higher than usual, but was deemed to be acceptable. Measurements attached.

 The full electrical check was done on October 25th 2013. The results are in the attached PDF. The higher value of the conductance was dealt with see Anders Mjos elog entry for those details.

Entry  Wednesday, December 04, 2013, 10:44, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#41, module move 

TM#4 with Ta#41 has moved to the south hot cell, the move it self was uneventful but, the fields on the module are extremely high when lowering it down into the south hot cell the module had a maximum field of about 392mSv/hr. The shield plug was also installed remotely as well due to the 12mSv/hr field at the top of the west target station due to shine from the dump.

Entry  Wednesday, December 04, 2013, 14:09, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#41, Electrical check TM#4_Ta41_electest_SHC_PostBeam.PDF

Electrical check of TM#4 with Ta#41 post beam at the south hot cell. See PDF for details

Entry  Monday, December 09, 2013, 13:15, Travis Cave, Spent Target Vault, Standard Operation, , Ta#41, Spent target move Vault_Storage_December_9_2013.pdf

The spent Ta#41 target has been moved from the south hot cell to the spent target storage vault. It is an unnumbered pail (should be pail 112) and placed in spot 7A of the vault it had a reading of 536mSv/hr upon removal from the south hot cell. See attached PDF for vault details.

Entry  Wednesday, May 22, 2013, 14:11, chad fisher, South Hot-Cell, Standard Operation, TM4, Ta#40, Ta#40 installed 

Ta#40 has been installed.

Leak checking and high voltage tomorrow before the move.

Entry  Thursday, May 23, 2013, 09:51, Travis Cave, Conditioning Station, Standard Operation, TM4, Ta#40, module move 

TM#4 with Ta#40 has been moved from the south hot cell to the conditioning station.

Entry  Monday, May 27, 2013, 16:36, Bevan Moss, Conditioning Station, Standard Operation, TM4, Ta#40, Argon Venting Started 

 Argon venting has started. It will be left to vent over night. 

Entry  Tuesday, May 28, 2013, 10:37, Travis Cave, ITE, Standard Operation, TM4, Ta#40, module move 

TM#4 with Ta #40 moved from the conditioning station to the east target station, move went well.

Entry  Tuesday, May 28, 2013, 10:42, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#40, Electrical check TM#4_Ta#40_SIS_Target_Elec_Chk.PDF

Results of the electrical check on  TM#4 with Ta#40, it passed. See attached PDF for results.

Entry  Wednesday, May 29, 2013, 06:32, David Wang, ITE, Standard Operation, TM4, Ta#40, TM4 has been connected in ITE. 

TM4 has been connected in ITE. The pumping down is fine so far.TM4 water interlock check was done yesterday.

Entry  Tuesday, July 23, 2013, 10:55, Travis Cave, ITE, Standard Operation, TM4, Ta#40, module move 

TM#4 with Ta#40 has been moved from the east target station to the south hot cell move went well.

Entry  Tuesday, July 23, 2013, 13:33, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#40, Electrical check TM#4_Ta#40_SIS_Tgt_Elec_Chk_post.PDF

Results of electrical check on Ta#40 target on TM#4 post beam at the south hot cell