632
|
Wednesday, March 26, 2014, 06:57 |
David Wang | South Hot-Cell | Standard Operation | TM4 | Ta#42 | Leak check on TM4 HS water line with new Ta #42 target. | Chad and I leak checked TM4 HS line with
Ta#42 target on the module. The leak detector
base LR 0.0xE-9 atm.cc/sec, base pressure0.0xE-4 |
|
|
633
|
Wednesday, March 26, 2014, 08:36 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | Ta#42 | module move | TM#4 with Ta#42 has been moved from the
south hot cell to the conditioning station. |
|
|
634
|
Thursday, March 27, 2014, 10:47 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | Ta#42 | Electrical check | TM#4 with Ta#42 in the conditioning station
under vacuum electrical check. |
|
|
636
|
Wednesday, April 02, 2014, 09:14 |
Travis Cave | ITW | Standard Operation | TM4 | Ta#42 | module move | TM#4 with Ta#42 has been moved to the west
target station. |
|
|
651
|
Wednesday, April 16, 2014, 10:16 |
Anders Mjos | ITW | Development | TM3 | Ta#42 | Flow meters installed on Heat Shield and Coil water return |
|
|
|
666
|
Tuesday, May 27, 2014, 10:42 |
Travis Cave | ITW | Standard Operation | TM4 | Ta#42 | module move | TM#4 with Ta#42 has been moved from
the west target station to the south hot
cell. |
|
|
667
|
Tuesday, May 27, 2014, 11:45 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#42 | Electrical check | TM#4 electrical check with Ta#42 attached
post beam at the south hot cell. |
|
|
669
|
Friday, May 30, 2014, 09:41 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#42 | Spent target move | Ta#42 in pail #114 has been moved from
the south hot cell to the spent target storage
vault and place in spot 7B. The target was |
|
|
525
|
Thursday, October 24, 2013, 15:43 |
Anders Mjos | South Hot-Cell | Standard Operation | TM4 | Ta#41 | Target conductance | The conductance check on the electrical
check was found to be outside of accepted
values for the TBHT at 7.0 mOhm. A successful |
|
|
526
|
Thursday, October 24, 2013, 15:54 |
Grant Minor | South Hot-Cell | Standard Operation | TM4 | Ta#41 | Target conductance |
|
|
|
528
|
Friday, October 25, 2013, 10:26 |
Travis Cave | ITW | Standard Operation | TM4 | Ta#41 | module move | TM#4 with Ta#41 has been moved from the
south hot cell to the west target station. |
|
|
530
|
Friday, October 25, 2013, 14:09 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#41 | Target conductance |
|
|
|
566
|
Wednesday, December 04, 2013, 10:44 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#41 | module move | TM#4 with Ta#41 has moved to the south
hot cell, the move it self was uneventful
but, the fields on the module are extremely |
|
|
570
|
Wednesday, December 04, 2013, 14:09 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#41 | Electrical check | Electrical check of TM#4 with Ta#41 post
beam at the south hot cell. See PDF for details |
|
|
576
|
Monday, December 09, 2013, 13:15 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#41 | Spent target move | The spent Ta#41 target has been moved from
the south hot cell to the spent target storage
vault. It is an unnumbered pail (should be |
|
|
356
|
Wednesday, May 22, 2013, 14:11 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | Ta#40 | Ta#40 installed | Ta#40 has been installed.
Leak checking and high voltage tomorrow
before the move. |
|
|
357
|
Thursday, May 23, 2013, 09:51 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | Ta#40 | module move | TM#4 with Ta#40 has been moved from the
south hot cell to the conditioning station. |
|
|
368
|
Monday, May 27, 2013, 16:36 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | Ta#40 | Argon Venting Started | Argon venting has started. It will
be left to vent over night. |
|
|
369
|
Tuesday, May 28, 2013, 10:37 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#40 | module move | TM#4 with Ta #40 moved from the conditioning
station to the east target station, move
went well. |
|
|
370
|
Tuesday, May 28, 2013, 10:42 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#40 | Electrical check | Results of the electrical check on
TM#4 with Ta#40, it passed. See attached
PDF for results. |
|