  ID Date Author Category Type Module Target/Number Subjectdown Text Attachments
  2346   Tuesday, July 19, 2022, 11:47 Frank SongITWStandard OperationTM2SiC#43 FebiadTM2 with SiC#43 disconnected in ITW  the module was disconnected in pit
and moved to NHC.
 TM2_with_SiC43_disconnection_in_ITW.jpg 
  1789   Friday, September 21, 2018, 10:07 David WangITWStandard OperationTM2SiC nanoTM2 with SiC nano target was has been connected in ITW.Tm2 with SiC nano has been connected in
ITW. See attachment for checklist
 TM2_with_SiC_nano_connection_in_ITW..pdf 
  1893   Monday, March 18, 2019, 07:23 David WangConditioning StationRepairTM2 TM2 window line helium testNew seals with a blank off cap are installed
on TM2 window line water block.  
The seals are checked at TCS with 70 psi
  
  1726   Wednesday, May 30, 2018, 09:51 David WangConditioning StationRepairTM2 TM2 water lines helium pressure test at TCS.I did a helium pressure test on  TM2 water
lines at TCS. We will remove the TM2 source
tray soon so this  test is a reference check
  
  1863   Monday, January 28, 2019, 10:41 David WangConditioning StationRepairTM2 TM2 water lines helium pressure test at TCSleak detector base LR: 0.0Xe-9atm.cc/sec.
helium 70 psi. test time : 3 minutes for
each circuit.The results in atm.cc/sec are
  
  1211   Thursday, April 14, 2016, 09:46 Anders MjosConditioning StationStandard OperationTM2 TM2 water leak test Thursday, April 14, 2016, 07:50:
RGA on

Friday, April 15, 2016, 08:09
 2016-04-15_RGA.png 
  2603   Thursday, May 30, 2024, 11:08 David WangConditioning StationStandard OperationTM2 TM2 was moved from silo to TCS yesterday morning.TM2 was moved from silo to TCS yesterday
morning. The move is smooth.   
TCS vacuum system was started after. TCS
  
  2079   Friday, March 06, 2020, 09:51 David WangSouth Hot-CellStandard OperationTM2 TM2 was moved from SHC to SMP yesterday.TM2 was moved from SHC to SMP yesterday. 
The move is successful. TM2 is located at
SMP. There is no hot target on module so
  
  1427   Tuesday, January 24, 2017, 15:32 David WangITWStandard OperationTM2 TM2 was moved from ITW to SHC this morning.The move is smooth. Yasmine and Travis
did the move.
  
  1590   Wednesday, August 02, 2017, 15:09 David WangITWStandard OperationTM2 TM2 was disconnencted in ITW yesterday.Tm2 was disconnected in ITW yesterday.
ITW EL cable crimp ring was broken. John
Chow replaced this ring this afternoon.
  
  1788   Friday, September 21, 2018, 10:06 David WangITWStandard OperationTM2UCx23TM2 was disconnected in ITW.TM2 was disconnected in ITW this Tuesday.
See attachment for checklist.
 TM2_UCx_23#_disconnection_in_ITW..pdf 
  1806   Tuesday, October 23, 2018, 10:45 David WangITWStandard OperationTM2SiC nanoTM2 was disconnected in ITW.TM2(SiC nano) has been disconnected in
ITW. See attachment
 TM2_SiC_nano_disconnection_in_ITW.pdf 
  1331   Wednesday, August 24, 2016, 10:41 David WangITWStandard OperationTM2 TM2 was disconnected in ITW yesterday.TM2 was disconnected in ITW yesterday and
moved to SHC.
  
  1370   Wednesday, October 12, 2016, 10:00 David WangITWStandard OperationTM2 TM2 was disconnected at ITWTM2 was disconnected at ITW. 3 water circuits
in ITW gave been looped to keep 75 GPM water
flow to ITW. HS line was purged at HS. RPG
  
  1041   Thursday, August 20, 2015, 09:38 David WangConditioning StationRepairTM2 TM2 was disconnected at CSTM2 was disconnected at CS. Travis and
I did  electrical check before the venting.
After,The module was vented and moved to
  
  1271   Wednesday, July 06, 2016, 07:03 David WangITWStandard OperationTM2 TM2 was connected in ITW.TM2 was disconnected in ITW and moved to
SHC.
  
  1333   Wednesday, August 24, 2016, 10:45 David WangConditioning StationStandard OperationTM2 TM2 vacuum system has been connected at TCSStart of roughing now.   
  1033   Thursday, August 13, 2015, 09:17 chad fisherSouth Hot-CellRepairTM2 TM2 statusTuesday, August 11,  insulator ITA6272
was installed onto the "pin x"
line (unused plasma electrode) and tested;
 20150811_132709.jpg20150813_083255.jpg20150813_090814.jpg 
  1624   Friday, September 22, 2017, 12:13 David WangSouth Hot-CellMaintenanceTM2 TM2 service cap inside inspection.Two side panels on TM2 service cap were
removed for TM2 service cap inside inspection.
A piece of cable tie was found inside cap
 TM2_serica_cap_inspection_002.JPGTM2_serica_cap_inspection_003.JPGTM2_serica_cap_inspection_004.JPGTM2_serica_cap_inspection_005.JPGTM2_serica_cap_inspection_008.JPG 
  1598   Tuesday, August 15, 2017, 09:30 Anders MjosITWStandard OperationTM2Ta#53TM2 radiation fields

    

       
            
  