690
|
Wednesday, June 25, 2014, 12:55 |
Anders Mjos | South Hot-Cell | Standard Operation | TM3 | TiC#4 | Object - possibly cable tie found in Containment Box | See attached PDF. The object is not
accessible with only the front panel removed.
Photos on DocuShare. |
|
691
|
Wednesday, June 25, 2014, 13:46 |
Travis Cave | South Hot-Cell | Repair | TM3 | no target | Electrical check | Electrical check of TM#3 after the insulator
repair. See attached PDF for details. |
|
692
|
Thursday, June 26, 2014, 10:57 |
David Wang | South Hot-Cell | Standard Operation | TM3 | | Leak check on TM3 HS water line with new target. installed. | Chad and I leak checked the TM3 HS water
line with new target installed. No
leak has been found during the check. Leak |
|
693
|
Thursday, June 26, 2014, 11:15 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | SiC#30 | Electrical check | Electrical check of the TM#3 with SiC#30
attached. Also an electrical check of TM#3
after the cleaning of ground electrode with |
 |
694
|
Thursday, June 26, 2014, 14:18 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | SiC#30 | module move | TM#3 with SiC#30 has been moved from the
south hot cell to the conditioning station. |
|
695
|
Friday, June 27, 2014, 10:16 |
David Wang | Conditioning Station | Standard Operation | TM3 | | TM3 HS water lines helium pressure test. at CS | TM3 HS water line helium pressure test
is done at CS. 70 psi helium , 3 minutes.Base
LR 0.0xE-9 atm.cc/sec, base pressure 0.0xE-4 |
|
696
|
Friday, June 27, 2014, 11:26 |
Anders Mjos | South Hot-Cell | Standard Operation | TM3 | | Ground Electrode Cleaned |
|
|
697
|
Wednesday, July 02, 2014, 09:02 |
Travis Cave | ITE | Standard Operation | TM3 | SiC#30 | module move | TM#3 with SiC#30 has been moved from the
conditioning station to the east target station. |
|
699
|
Monday, July 07, 2014, 14:45 |
Grant Minor | ITE | Maintenance | TM3 | SiC #30 | FEBIAD gas line check | There were some problems this morning with
provision of FEBIAD gas to the the target
at ITE. It was suspected that the gas |
|
700
|
Tuesday, July 08, 2014, 09:57 |
David Wang | ITE | Standard Operation | TM3 | | 5 Shielding blocks have been transferred from ITW to ITE. | 5 Shielding blocks have been transferred
from ITW to ITE. The ITE is configured to
take proton beam. |
|
705
|
Wednesday, July 16, 2014, 13:59 |
chad fisher | South Hot-Cell | Standard Operation | TM3 | SiC#30 | Sic#30 install | Just some notes on the install of SiC#30
on TM3 last month...It was installed with
all new fasteners and torque values provided |
|
720
|
Thursday, July 31, 2014, 08:08 |
chad fisher | South Hot-Cell | Standard Operation | TM3 | SiC#30 | SiC#30 Removed and inpect | SiC#30 has been removed from TM3. A quick
exam of TM3 source tray did not yield
any obvious signs of damage. |
   |
723
|
Wednesday, August 06, 2014, 11:11 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | module move | TM#3 with no target has been moved to the
northwest silo for storage. |
|
758
|
Wednesday, October 08, 2014, 09:39 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | module move | TM#3 has been moved from the North West
Silo to the conditioning station. |
|
759
|
Friday, October 10, 2014, 10:47 |
David Wang | Conditioning Station | Development | TM3 | | TM3 has been connected in CS | TM3 has been connected in CS. All water
supplies are bypassed theTM3 on the top of
the service cap. TM3 TP2 was difficult to |
|
764
|
Tuesday, October 14, 2014, 17:19 |
Anders Mjos | Conditioning Station | Standard Operation | TM3 | No target | High Voltage Conditioning | Wednesday, October 14, 2014
The BIAS voltage was brought
up between 1:30pm and 5pm. Sparks tripped |
|
768
|
Monday, October 20, 2014, 08:59 |
David Wang | Conditioning Station | Development | TM3 | | Started TCS water system. | I started TCS water system this morning
to check if the chillers work properly. |
|
769
|
Monday, October 20, 2014, 09:13 |
David Wang | Conditioning Station | Development | TM3 | | TM3 TP2 failed | TM3 TP2 stopped working this morning at
4:00 AM. I tried to start it but failed.
On normal start mode , It could not pass |
|
773
|
Wednesday, October 22, 2014, 09:41 |
David Wang | Conditioning Station | Development | TM3 | | TM3 has been disconnected at CS. | TM3 has been disconnected at CS. It is
vented and ready to move. |
|
784
|
Thursday, November 06, 2014, 13:43 |
David Wang | Conditioning Station | Development | TM3 | | CS vacuum system has been connected to TM3. | CS vacuum system has been connected
to TM3 for control system test(Dave.Morris). |
|