  700   Tuesday, July 08, 2014, 09:57 David WangITEStandard OperationTM3 5 Shielding blocks have been transferred from ITW to ITE.5 Shielding blocks have been transferred
from ITW to ITE. The ITE is configured to
take proton beam.
  
  705   Wednesday, July 16, 2014, 13:59 chad fisherSouth Hot-CellStandard OperationTM3SiC#30Sic#30 installJust some notes on the install of SiC#30
on TM3 last month...It was installed with
all new fasteners and torque values provided
  
  720   Thursday, July 31, 2014, 08:08 chad fisherSouth Hot-CellStandard OperationTM3SiC#30SiC#30 Removed and inpectSiC#30 has been removed from TM3. A quick
exam of TM3 source tray did not  yield
any obvious signs of damage.
 TM320140731_01.jpgTM320140731_02.jpgTM320140731_03.jpgTM320140731_04.jpg 
  723   Wednesday, August 06, 2014, 11:11 Travis CaveSouth Hot-CellStandard OperationTM3no targetmodule moveTM#3 with no target has been moved to the
northwest silo for storage.
  
  758   Wednesday, October 08, 2014, 09:39 Travis CaveConditioning StationStandard OperationTM3no targetmodule moveTM#3 has been moved from the North West
Silo to the conditioning station.
  
  759   Friday, October 10, 2014, 10:47 David WangConditioning StationDevelopmentTM3 TM3 has been connected in CSTM3 has been connected in CS. All water
supplies are bypassed theTM3 on the top of
the service cap. TM3 TP2 was difficult to
  
  764   Tuesday, October 14, 2014, 17:19 Anders MjosConditioning StationStandard OperationTM3No targetHigh Voltage ConditioningWednesday, October 14, 2014
 The BIAS voltage was brought
up between 1:30pm and 5pm. Sparks tripped
 TCS_TM3.docx 
  768   Monday, October 20, 2014, 08:59 David WangConditioning StationDevelopmentTM3 Started TCS water system.I started TCS water system this morning
to check if the chillers work properly.
  
  769   Monday, October 20, 2014, 09:13 David WangConditioning StationDevelopmentTM3 TM3 TP2 failedTM3 TP2 stopped working this morning at
4:00 AM. I tried to start it but failed.
On normal start mode , It could not pass
  
  773   Wednesday, October 22, 2014, 09:41 David WangConditioning StationDevelopmentTM3 TM3 has been disconnected at CS.TM3 has been disconnected at CS. It is
vented and ready to move.
  
  784   Thursday, November 06, 2014, 13:43 David WangConditioning StationDevelopmentTM3 CS vacuum system has been connected to TM3.CS  vacuum system has been connected
to TM3 for control system test(Dave.Morris).
  
  788   Monday, November 17, 2014, 11:38 Travis CaveConditioning StationStandard OperationTM3no targetmodule moveTM#3 with no target has been moved from
the conditioning station to the north west
silo.
  
  1087   Wednesday, September 30, 2015, 08:50 Travis CaveSouth Hot-CellMaintenanceTM3no targetModule movedTM#3 is in the south hot cell it was moved
from the north west silo.
  
  1088   Wednesday, September 30, 2015, 11:14 Travis CaveSouth Hot-CellRepairTM3no targetElectrical CheckTM#3 electrical check at the south hot
cell, no target, all value are done at 1000Volts.
See the attached PDF for the results.
 TM3_elecchk_notgt_shc.PDF 
  1095   Tuesday, October 06, 2015, 21:12 Aurelia LaxdalSouth Hot-CellRepairTM3 TM3 service cap inspection in target hallDavid Wang and I did the service cap inspection
in target hall: see WP I2015-10-06-10.<br>
Signs of sparking were seen underneath
 Pic1.jpg 
  1096   Thursday, October 08, 2015, 14:08 David WangSouth Hot-CellStandard OperationTM3Dummy target febiad.TM3 has been moved from SHC to NW siloBill and I moved TM3 from SHC to NW silo
with a dummy febiad target installed on it.
The move is smooth.
  
  1116   Thursday, November 05, 2015, 09:57 Travis CaveConditioning StationMaintenanceTM3no targetModule movedTM#3 has been moved from the north west
silo to the conditioning station.
  
  1117   Friday, November 06, 2015, 14:36 Anders MjosConditioning StationDevelopmentTM3FEBIAD test targetTesting TM3Friday, November 06, 2015, 14:35: Roughing
Turbos was started around 4pm. Later
it was found that the manual valve for the
  
  1118   Friday, November 06, 2015, 14:44 Anders MjosConditioning StationRepairTM3 O-rings replaced on service capO-rings were replaced on the service cap
by Anders, Maico, Aurelia and Keith under
work permit  I2015-11-05-5
  
  1119   Monday, November 09, 2015, 16:47 Anders MjosConditioning StationMaintenanceTM3FEBIAD Test TargetLeak check of Service CapService cap leak checked this afternoon.
Found multiple leaks of 10E-8 to 10E-7 range.