Wednesday, September 24, 2014, 15:16, David Wang, ITE, Standard Operation, TM4, Ta#44, Reconnected TM4 in ITE.
|
TM4 has been reconnected back to ITE. I started all turbo pumps on ITE and TM4. The ITE TP4s was extremely difficult to start. This pump is new, and
was replaced before the last ITE beam time on July. After several times try and starting mode switch, it is started. Its temperature and current
draw showed on controller and very good after the start. The current draw on ITE TP1s is s a little bit high and unstable. I will keep watching on |
Tuesday, November 18, 2014, 10:28, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#44, module move
|
TM#4 with Ta#44 has been moved from the east target station to the south hot cell. |
Tuesday, November 18, 2014, 11:15, David Wang, ITE, Standard Operation, TM4, Ta#44, TM4 has been disconnected in ITE.
|
Dan and I disconnected TM4 in ITE. |
Friday, November 21, 2014, 10:40, Travis Cave, Spent Target Vault, Standard Operation, , Ta#44, Spent target move
|
The spent Ta#44 target has been removed from the south hot cell, it was placed in pail #121 and placed in spot 4A of the storage vault. It was 276mSv/hr
upon removal from the south hot cell. |
Wednesday, July 16, 2014, 14:28, Travis Cave, South Hot-Cell, Standard Operation, TM1, Ta#43, Electrical check
|
TM#1 with Ta#43 electrical check see attached PDF. |
Thursday, July 17, 2014, 09:29, Travis Cave, South Hot-Cell, Standard Operation, TM1, Ta#43, module move
|
TM#1 with Ta#43 has been moved from the south hot cell to conditioning station. |
Wednesday, September 03, 2014, 13:55, Travis Cave, South Hot-Cell, Standard Operation, TM1, Ta#43, module move
|
TM#1 with Ta#43 has been moved from the ITW to the south hot cell. |
Friday, September 05, 2014, 13:07, Travis Cave, Spent Target Vault, Standard Operation, , Ta#43, Spent target move
|
Ta#43 has been moved from the south hot cell to the spent target vault. See attached PDF for details. |
Tuesday, March 25, 2014, 09:11, chad fisher, South Hot-Cell, Standard Operation, TM4, Ta#42, Ta#42 install and "new" 9 pin
|
Ta#42 has been installed onto TM4. The "new" 9 pin connector was not an issue...attually went on better than any other previous one. Leaving
the mounting screws loose on the target half allowed use of the manipulator to center the pins and insert them with ease. |
Tuesday, March 25, 2014, 13:29, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#42, Electrical check 
|
TM#4 was checked electrically with and without target on it, see attached PDFs for details. |
Wednesday, March 26, 2014, 06:57, David Wang, South Hot-Cell, Standard Operation, TM4, Ta#42, Leak check on TM4 HS water line with new Ta #42 target.
|
Chad and I leak checked TM4 HS line with Ta#42 target on the module. The leak detector base LR 0.0xE-9 atm.cc/sec, base pressure0.0xE-4 torr. Chad applied
helium to the joints, and flushed the helium around the target. No leak has been found.I will do helium pressure test on this circuit at CS later. |
Wednesday, March 26, 2014, 08:36, Travis Cave, Conditioning Station, Standard Operation, TM4, Ta#42, module move
|
TM#4 with Ta#42 has been moved from the south hot cell to the conditioning station. |
Thursday, March 27, 2014, 10:47, Travis Cave, Conditioning Station, Standard Operation, TM4, Ta#42, Electrical check
|
TM#4 with Ta#42 in the conditioning station under vacuum electrical check. |
Wednesday, April 02, 2014, 09:14, Travis Cave, ITW, Standard Operation, TM4, Ta#42, module move
|
TM#4 with Ta#42 has been moved to the west target station. |
Wednesday, April 16, 2014, 10:16, Anders Mjos, ITW, Development, TM3, Ta#42, Flow meters installed on Heat Shield and Coil water return
|
Anders Mjos wrote:
|
Tuesday, May 27, 2014, 10:42, Travis Cave, ITW, Standard Operation, TM4, Ta#42, module move
|
TM#4 with Ta#42 has been moved from the west target station to the south hot cell. |
Tuesday, May 27, 2014, 11:45, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#42, Electrical check
|
TM#4 electrical check with Ta#42 attached post beam at the south hot cell. |
Friday, May 30, 2014, 09:41, Travis Cave, Spent Target Vault, Standard Operation, , Ta#42, Spent target move
|
Ta#42 in pail #114 has been moved from the south hot cell to the spent target storage vault and place in spot 7B. The target was 277mSv/hr upon removal
from the south hot cell. See attached PDF of vault status. |
Thursday, October 24, 2013, 15:43, Anders Mjos, South Hot-Cell, Standard Operation, TM4, Ta#41, Target conductance
|
The conductance check on the electrical check was found to be outside of accepted values for the TBHT at 7.0 mOhm. A successful attempt to reduce the
conductance was made by re-tightening the bolts on the TGHT legs in the SHC. Grant operated the manipulator and torqued the bolts to about 1/8 of a turn
with the air ratchet. The conductance across the TGHT (A-B) could be improved from 7.0 mOhm to 6.2 mOhm by re-tightening the bolts. The value is still |
Thursday, October 24, 2013, 15:54, Grant Minor, South Hot-Cell, Standard Operation, TM4, Ta#41, Target conductance
|
Anders Mjos wrote:
The conductance check on the electrical check was found to be outside of accepted values for the TBHT |
|