ID Date Author Category Type Moduledown Target/Number Subject Text Attachments
  690   Wednesday, June 25, 2014, 12:55 Anders MjosSouth Hot-CellStandard OperationTM3TiC#4Object - possibly cable tie found in Containment Box See attached PDF. The object is not
accessible with only the front panel removed.
Photos on DocuShare.
 TiC#4_Cable_Tie.pdf 
  691   Wednesday, June 25, 2014, 13:46 Travis CaveSouth Hot-CellRepairTM3no targetElectrical checkElectrical check of TM#3 after the insulator
repair. See attached PDF for details.
 TM3electestsinsulrepair.PDF 
  692   Thursday, June 26, 2014, 10:57 David WangSouth Hot-CellStandard OperationTM3 Leak check on TM3 HS water line with new target. installed.Chad and I leak checked the TM3 HS water
line with new target installed.  No
leak has been found during the check. Leak
  
  693   Thursday, June 26, 2014, 11:15 Travis CaveSouth Hot-CellStandard OperationTM3SiC#30Electrical checkElectrical check of the TM#3 with SiC#30
attached. Also an electrical check of TM#3
after the cleaning of ground electrode with
 TM3_SiC30_elecSHC.PDFTM3_elecchkaftclean.PDF 
  694   Thursday, June 26, 2014, 14:18 Travis CaveConditioning StationStandard OperationTM3SiC#30module moveTM#3 with SiC#30 has been moved from the
south hot cell to the conditioning station.
  
  695   Friday, June 27, 2014, 10:16 David WangConditioning StationStandard OperationTM3  TM3 HS water lines helium pressure test. at CSTM3 HS water line helium pressure test
is done at CS. 70 psi helium , 3 minutes.Base
LR 0.0xE-9 atm.cc/sec, base pressure 0.0xE-4
  
  696   Friday, June 27, 2014, 11:26 Anders MjosSouth Hot-CellStandard OperationTM3 Ground Electrode Cleaned

    

       
            
 TM3_GND_Electrode_Cleaning.pdf 
  697   Wednesday, July 02, 2014, 09:02 Travis CaveITEStandard OperationTM3SiC#30module moveTM#3 with SiC#30 has been moved from the
conditioning station to the east target station.
  
  699   Monday, July 07, 2014, 14:45 Grant MinorITEMaintenanceTM3SiC #30FEBIAD gas line checkThere were some problems this morning with
provision of FEBIAD gas to the the target
at ITE.  It was suspected that the gas
 ITE_Febiad_Gas_Line_Check_7July2014_arrows.jpg 
  700   Tuesday, July 08, 2014, 09:57 David WangITEStandard OperationTM3 5 Shielding blocks have been transferred from ITW to ITE.5 Shielding blocks have been transferred
from ITW to ITE. The ITE is configured to
take proton beam.
  
  705   Wednesday, July 16, 2014, 13:59 chad fisherSouth Hot-CellStandard OperationTM3SiC#30Sic#30 installJust some notes on the install of SiC#30
on TM3 last month...It was installed with
all new fasteners and torque values provided
  
  720   Thursday, July 31, 2014, 08:08 chad fisherSouth Hot-CellStandard OperationTM3SiC#30SiC#30 Removed and inpectSiC#30 has been removed from TM3. A quick
exam of TM3 source tray did not  yield
any obvious signs of damage.
 TM320140731_01.jpgTM320140731_02.jpgTM320140731_03.jpgTM320140731_04.jpg 
  723   Wednesday, August 06, 2014, 11:11 Travis CaveSouth Hot-CellStandard OperationTM3no targetmodule moveTM#3 with no target has been moved to the
northwest silo for storage.
  
  758   Wednesday, October 08, 2014, 09:39 Travis CaveConditioning StationStandard OperationTM3no targetmodule moveTM#3 has been moved from the North West
Silo to the conditioning station.
  
  759   Friday, October 10, 2014, 10:47 David WangConditioning StationDevelopmentTM3 TM3 has been connected in CSTM3 has been connected in CS. All water
supplies are bypassed theTM3 on the top of
the service cap. TM3 TP2 was difficult to
  
  764   Tuesday, October 14, 2014, 17:19 Anders MjosConditioning StationStandard OperationTM3No targetHigh Voltage ConditioningWednesday, October 14, 2014
 The BIAS voltage was brought
up between 1:30pm and 5pm. Sparks tripped
 TCS_TM3.docx 
  768   Monday, October 20, 2014, 08:59 David WangConditioning StationDevelopmentTM3 Started TCS water system.I started TCS water system this morning
to check if the chillers work properly.
  
  769   Monday, October 20, 2014, 09:13 David WangConditioning StationDevelopmentTM3 TM3 TP2 failedTM3 TP2 stopped working this morning at
4:00 AM. I tried to start it but failed.
On normal start mode , It could not pass
  
  773   Wednesday, October 22, 2014, 09:41 David WangConditioning StationDevelopmentTM3 TM3 has been disconnected at CS.TM3 has been disconnected at CS. It is
vented and ready to move.
  
  784   Thursday, November 06, 2014, 13:43 David WangConditioning StationDevelopmentTM3 CS vacuum system has been connected to TM3.CS  vacuum system has been connected
to TM3 for control system test(Dave.Morris).
  