ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
690
|
Wednesday, June 25, 2014, 12:55 |
Anders Mjos | South Hot-Cell | Standard Operation | TM3 | TiC#4 | Object - possibly cable tie found in Containment Box |
See attached PDF. The object is not accessible with only the front panel removed. Photos on DocuShare. |
691
|
Wednesday, June 25, 2014, 13:46 |
Travis Cave | South Hot-Cell | Repair | TM3 | no target | Electrical check |
Electrical check of TM#3 after the insulator repair. See attached PDF for details. |
692
|
Thursday, June 26, 2014, 10:57 |
David Wang | South Hot-Cell | Standard Operation | TM3 | | Leak check on TM3 HS water line with new target. installed. |
Chad and I leak checked the TM3 HS water line with new target installed. No leak has been found during the check. Leak detector base LR 0.0xE-9 atm.cc/sec, base pressure 0.0xE-4 torr. The line will be helium pressurized at CS later. |
693
|
Thursday, June 26, 2014, 11:15 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | SiC#30 | Electrical check |
Electrical check of the TM#3 with SiC#30 attached. Also an electrical check of TM#3 after the cleaning of ground electrode with no target attached. |
694
|
Thursday, June 26, 2014, 14:18 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | SiC#30 | module move |
TM#3 with SiC#30 has been moved from the south hot cell to the conditioning station. |
695
|
Friday, June 27, 2014, 10:16 |
David Wang | Conditioning Station | Standard Operation | TM3 | | TM3 HS water lines helium pressure test. at CS |
TM3 HS water line helium pressure test is done at CS. 70 psi helium , 3 minutes.Base LR 0.0xE-9 atm.cc/sec, base pressure 0.0xE-4 torr. No response. The line is leak free. |
696
|
Friday, June 27, 2014, 11:26 |
Anders Mjos | South Hot-Cell | Standard Operation | TM3 | | Ground Electrode Cleaned |
Anders Mjos wrote: |
See attached pdf and DocuShare for more photos. It may be possible to clean some of it from the Ground Electrode.
|
Chad cleaned the GND electrode yesterday June 26th - see attached PDF. Photos on DocuShare. |
697
|
Wednesday, July 02, 2014, 09:02 |
Travis Cave | ITE | Standard Operation | TM3 | SiC#30 | module move |
TM#3 with SiC#30 has been moved from the conditioning station to the east target station. |
699
|
Monday, July 07, 2014, 14:45 |
Grant Minor | ITE | Maintenance | TM3 | SiC #30 | FEBIAD gas line check |
There were some problems this morning with provision of FEBIAD gas to the the target at ITE. It was suspected that the gas line was improperly connected to the module, or that the valves at the module were not opened.
Remote Handling was asked to open the HV cover on TM3 at ITE and check the connection of the FEBIAD gas line. Grant Minor, Maico Dalla Valle, Dan McDonald, and Anders Mjos entered the Target Hall before lunch on Work Permit I2014-07-07-1.
Maico entered ITE with suit and respirator, disengaged / disconnected the interlocks and removed the HV cover. He inspected the FEBIAD gas line and found that it was properly connected, and that the valves were both open. The gas line is shown in the attached image, with both valves marked in red.
Grant and Anders went into the electrical room to examine the supply gas bottle and supply circuit, and found that the supply gas pressure to the regulating valve was low. It was concluded that the problem was not at the Target Module / Target Station.
Grant returned to the Target Station and instructed Maico to replace the HV cover. After this was done, Grant confirmed with Jon Aoki over the phone that the interlock switch signals were both reading "OK".
Friedhelm Ames made an entry in today's ISAC Ops e-log regarding the supply pressure to the regulating valve.
ISAC E-log
|
700
|
Tuesday, July 08, 2014, 09:57 |
David Wang | ITE | Standard Operation | TM3 | | 5 Shielding blocks have been transferred from ITW to ITE. |
5 Shielding blocks have been transferred from ITW to ITE. The ITE is configured to take proton beam. |
705
|
Wednesday, July 16, 2014, 13:59 |
chad fisher | South Hot-Cell | Standard Operation | TM3 | SiC#30 | Sic#30 install |
Just some notes on the install of SiC#30 on TM3 last month...It was installed with all new fasteners and torque values provided by Anders were used...of main interest is probably the main high current fasteners which were torqued to 150 in lbs. |
720
|
Thursday, July 31, 2014, 08:08 |
chad fisher | South Hot-Cell | Standard Operation | TM3 | SiC#30 | SiC#30 Removed and inpect |
SiC#30 has been removed from TM3. A quick exam of TM3 source tray did not yield any obvious signs of damage.
9 pin connector on the target showed the usual sparking/arcing marks.
Heat shield has been removed from the target. Inside of heat shield has some unusual marks on it and quite a lot of black deposits.
|
723
|
Wednesday, August 06, 2014, 11:11 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | module move |
TM#3 with no target has been moved to the northwest silo for storage. |
758
|
Wednesday, October 08, 2014, 09:39 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | module move |
TM#3 has been moved from the North West Silo to the conditioning station. |
759
|
Friday, October 10, 2014, 10:47 |
David Wang | Conditioning Station | Development | TM3 | | TM3 has been connected in CS |
TM3 has been connected in CS. All water supplies are bypassed theTM3 on the top of the service cap. TM3 TP2 was difficult to start. It is started finally after couple of time try.The pump runs fine now. |
764
|
Tuesday, October 14, 2014, 17:19 |
Anders Mjos | Conditioning Station | Standard Operation | TM3 | No target | High Voltage Conditioning |
Wednesday, October 14, 2014
The BIAS voltage was brought up between 1:30pm and 5pm. Sparks tripped the BIAS power supply at voltages between 20 - 24 kV. Multiple attempts were made. The current was about 50-60 uA.
Wednesday, October 15, 2014
Temperature in the cooling circuit is too hight to do a HV test. The cooling circuit was started, but shuts off after ~10 m
Thursday, October 16, 2014
David and I found that the fans on the cooling unit on the roof did not run and that the compressors get hot and likely trip on over temperature protection (hot to the touch). We found the manual in the control panel of the unit.
10am: HV to 20kV before a spark tripped the PS. Current at 40 uA - resistivity at 11.9 Mohm
5pm: HV to 20kV before fluctuations in current, then a spark tripped the PS. Current around 40 uA. Resistivity 12.6 Mohm
Friday, October 17, 2014
8am: Staging did not start over night. TS5 temp is 31 deg C, which would have tripped power supplies. Reset and enabled staging.
The system increased staging until all 3 compressors were running.
9am: Cooling supply temperature reached ~3 deg C. Disabled staging and switched off all pumps
2pm: Switched off water circulation for the weekend.
|
768
|
Monday, October 20, 2014, 08:59 |
David Wang | Conditioning Station | Development | TM3 | | Started TCS water system. |
I started TCS water system this morning to check if the chillers work properly. |
769
|
Monday, October 20, 2014, 09:13 |
David Wang | Conditioning Station | Development | TM3 | | TM3 TP2 failed |
TM3 TP2 stopped working this morning at 4:00 AM. I tried to start it but failed. On normal start mode , It could not pass 6K RPM. On soft start mode , the pump cant pass 17KRPM. Talked with Anders, We are not going to replace this pump since we are not going to run this module for a while. I will stopped all vacumm pumps on CS and TM3 this morning. |
773
|
Wednesday, October 22, 2014, 09:41 |
David Wang | Conditioning Station | Development | TM3 | | TM3 has been disconnected at CS. |
TM3 has been disconnected at CS. It is vented and ready to move. |
784
|
Thursday, November 06, 2014, 13:43 |
David Wang | Conditioning Station | Development | TM3 | | CS vacuum system has been connected to TM3. |
CS vacuum system has been connected to TM3 for control system test(Dave.Morris). |