ID Date Authordown Category Type Module Target/Number Subject Text Attachments
  1969   Thursday, August 22, 2019, 09:20 Travis CaveSouth Hot-CellStandard OperationTM4no targetModule move TM#4 has been moved from the south
west silo to the south hot cell.
  
  1978   Thursday, September 05, 2019, 14:26 Travis CaveSouth Hot-CellStandard OperationTM4UC#27Electrical Check The results of the electrical check
of TM#4 with UC#27 attached to it.
 TM4_elec_chk_with_UC27_at_SHC_Sept_5_2019.pdf 
  1979   Thursday, September 05, 2019, 14:26 Travis CaveSouth Hot-CellStandard OperationTM4UC#27Electrical Check The results of the electrical check
of TM#4 with UC#27 attached to it.
 TM4_elec_chk_with_UC27_at_SHC_Sept_5_2019.pdf 
  1987   Wednesday, September 18, 2019, 14:28 Travis CaveSpent Target VaultStandard Operation  Repacking of the targets. Three of the five targets in the
mini storage have been repackaged into the
stronger pail.
  
  1988   Thursday, September 19, 2019, 10:11 Travis CaveSpent Target VaultStandard Operation  Repacking of the targets. Another target in the mini storage
has been repackaged into the new pails. With
one remaining to do which will be done on
  
  1989   Monday, September 23, 2019, 13:21 Travis CaveSpent Target VaultStandard Operation  Repacking of the targets. All targets in the mini vault have
been repackaged and are now ready to be loaded
into F-308s. All the target pails have new
 Target_Index_2019-09-23_Mini_Vault.pdf 
  1991   Monday, September 30, 2019, 11:36 Travis CaveSouth Hot-CellStandard OperationTM2ZrC#8Module move TM#2 with ZrC#8 has been moved from
the east station to the south hot cell.
  
  1992   Monday, September 30, 2019, 14:05 Travis CaveSouth Hot-CellStandard OperationTM2ZrC#8Electrical Check Results of the electrical check on
TM#2 with ZrC#8 post beam.
 TM2_elec_chk_ZrC8_post_beam_SHC_09-30-2019.pdf 
  1995   Tuesday, October 01, 2019, 14:38 Travis CaveSouth Hot-CellStandard OperationTM2Ta#59Electrical Check The results of the electrical check
on TM#2 with the Ta#59 target and without
before the target was mounted on the module.
 TM2_no_target_SHC_elec_chk_Oct-1-2019.pdfTM2_Ta59_SHC_elec_chk_Oct-1-2019.pdf 
  1998   Thursday, October 03, 2019, 10:25 Travis CaveSpent Target VaultStandard Operation ZrC#8Spent Target Move The spent ZrC#8 was moved from the
south hot cell to the spent target vault.
It was placed in pail 217 and the pail was
 Target_Index_2019-10-02.pdf 
  1999   Friday, October 04, 2019, 14:53 Travis CaveSouth Hot-CellStandard OperationTM4UC#28Module move TM#4 with UC#28 has been moved from
the south hot cell to the west target station.
  
  2004   Tuesday, October 08, 2019, 09:02 Travis CaveSouth Hot-CellStandard OperationTM4UC#27 and UC#28Electrical Check Results of the electrical check of
TM4 without target and with UC27 and 28
 TM_elec_chk_with_UC27_shc_post_beem_Oct-04-2019.pdfTM4_elec_chk__with_UC28_shc_Oct-04-2019.pdfTM4_elec_chk_no_tgt_shc_Oct-04-2019.pdf 
  2005   Wednesday, October 09, 2019, 13:28 Travis CaveSpent Target VaultStandard Operation UC#27Spent Target Move The spent target in the south hot
cell has been moved to the spent target vault.
It was placed in spot 1B of the vault in
 Target_Index_2019-10-09.pdf 
  2008   Thursday, October 17, 2019, 11:49 Travis CaveSpent Target VaultStandard Operation SiC#31,32 and UC#19,20,21Loading F-308 The targets in the mini storage have
been loaded into the F-308.
  
  2013   Thursday, October 24, 2019, 14:11 Travis CaveITWStandard OperationTM4UC#29Module move TM#4 with UC29 has been moved from
the south hot cell to the west target station.
  
  2015   Monday, October 28, 2019, 11:50 Travis CaveSpent Target VaultStandard Operation UC#28Spent Target Move UC#28 has been moved from the south
hot cell to spent target storage. The target
was placed in pail number 219 and placed
 Target_Index_2019-10-28.pdf 
  2021   Tuesday, November 05, 2019, 10:19 Travis CaveSouth Hot-CellStandard OperationTM2Ta#59Module move TM#2 with Ta#59 has been moved from
the ITE to the south hot cell.
  
  2024   Tuesday, November 05, 2019, 14:27 Travis CaveSouth Hot-CellStandard OperationTM2Ta#59Electrical Check Results of the electrical check of
TM#2 with the old Ta#59 target and target
free.
 Elec_Chk_TM2_with_Ta59_post_beam_SHC_Nov_05_2019.pdfElec_Chk_TM2_SHC_no_target_Nov_5_2019.pdf 
  2028   Tuesday, November 12, 2019, 10:07 Travis CaveSpent Target VaultStandard Operation Ta#59Spent Target Move The spent Ta#59 was moved from the
south hot cell to the spent target vault.
See the attached for details.
 Target_Index_2019-11-08.pdf 
  2029   Thursday, November 14, 2019, 13:52 Travis CaveSpent Target VaultStandard Operation UC#22,23,24Targets repackaged The targets UC#22,23,24 have been
repackaged into the newer stronger pails,
and have been placed back in the mini vault
 Target_Index_2019-11-14_Mini_Vault.pdf 