1969
|
Thursday, August 22, 2019, 09:20 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Module move | TM#4 has been moved from the south
west silo to the south hot cell. |
|
1978
|
Thursday, September 05, 2019, 14:26 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#27 | Electrical Check | The results of the electrical check
of TM#4 with UC#27 attached to it. |
|
1979
|
Thursday, September 05, 2019, 14:26 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#27 | Electrical Check | The results of the electrical check
of TM#4 with UC#27 attached to it. |
|
1987
|
Wednesday, September 18, 2019, 14:28 |
Travis Cave | Spent Target Vault | Standard Operation | | | Repacking of the targets. | Three of the five targets in the
mini storage have been repackaged into the
stronger pail. |
|
1988
|
Thursday, September 19, 2019, 10:11 |
Travis Cave | Spent Target Vault | Standard Operation | | | Repacking of the targets. | Another target in the mini storage
has been repackaged into the new pails. With
one remaining to do which will be done on |
|
1989
|
Monday, September 23, 2019, 13:21 |
Travis Cave | Spent Target Vault | Standard Operation | | | Repacking of the targets. | All targets in the mini vault have
been repackaged and are now ready to be loaded
into F-308s. All the target pails have new |
|
1991
|
Monday, September 30, 2019, 11:36 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | ZrC#8 | Module move | TM#2 with ZrC#8 has been moved from
the east station to the south hot cell. |
|
1992
|
Monday, September 30, 2019, 14:05 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | ZrC#8 | Electrical Check | Results of the electrical check on
TM#2 with ZrC#8 post beam. |
|
1995
|
Tuesday, October 01, 2019, 14:38 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#59 | Electrical Check | The results of the electrical check
on TM#2 with the Ta#59 target and without
before the target was mounted on the module. |
|
1998
|
Thursday, October 03, 2019, 10:25 |
Travis Cave | Spent Target Vault | Standard Operation | | ZrC#8 | Spent Target Move | The spent ZrC#8 was moved from the
south hot cell to the spent target vault.
It was placed in pail 217 and the pail was |
|
1999
|
Friday, October 04, 2019, 14:53 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#28 | Module move | TM#4 with UC#28 has been moved from
the south hot cell to the west target station. |
|
2004
|
Tuesday, October 08, 2019, 09:02 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#27 and UC#28 | Electrical Check | Results of the electrical check of
TM4 without target and with UC27 and 28 |
|
2005
|
Wednesday, October 09, 2019, 13:28 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#27 | Spent Target Move | The spent target in the south hot
cell has been moved to the spent target vault.
It was placed in spot 1B of the vault in |
|
2008
|
Thursday, October 17, 2019, 11:49 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#31,32 and UC#19,20,21 | Loading F-308 | The targets in the mini storage have
been loaded into the F-308. |
|
2013
|
Thursday, October 24, 2019, 14:11 |
Travis Cave | ITW | Standard Operation | TM4 | UC#29 | Module move | TM#4 with UC29 has been moved from
the south hot cell to the west target station. |
|
2015
|
Monday, October 28, 2019, 11:50 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#28 | Spent Target Move | UC#28 has been moved from the south
hot cell to spent target storage. The target
was placed in pail number 219 and placed |
|
2021
|
Tuesday, November 05, 2019, 10:19 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#59 | Module move | TM#2 with Ta#59 has been moved from
the ITE to the south hot cell. |
|
2024
|
Tuesday, November 05, 2019, 14:27 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#59 | Electrical Check | Results of the electrical check of
TM#2 with the old Ta#59 target and target
free. |
|
2028
|
Tuesday, November 12, 2019, 10:07 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#59 | Spent Target Move | The spent Ta#59 was moved from the
south hot cell to the spent target vault.
See the attached for details. |
|
2029
|
Thursday, November 14, 2019, 13:52 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#22,23,24 | Targets repackaged | The targets UC#22,23,24 have been
repackaged into the newer stronger pails,
and have been placed back in the mini vault |
|