Thursday, August 22, 2019, 09:20, Travis Cave, South Hot-Cell, Standard Operation, TM4, no target, Module move
|
TM#4 has been moved from the south west silo to the south hot cell. |
Thursday, September 05, 2019, 14:26, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#27, Electrical Check
|
The results of the electrical check of TM#4 with UC#27 attached to it. |
Thursday, September 05, 2019, 14:26, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#27, Electrical Check
|
The results of the electrical check of TM#4 with UC#27 attached to it. |
Wednesday, September 18, 2019, 14:28, Travis Cave, Spent Target Vault, Standard Operation, , , Repacking of the targets.
|
Three of the five targets in the mini storage have been repackaged into the stronger pail. |
Thursday, September 19, 2019, 10:11, Travis Cave, Spent Target Vault, Standard Operation, , , Repacking of the targets.
|
Another target in the mini storage has been repackaged into the new pails. With one remaining to do which will be done on Monday. |
Monday, September 23, 2019, 13:21, Travis Cave, Spent Target Vault, Standard Operation, , , Repacking of the targets.
|
All targets in the mini vault have been repackaged and are now ready to be loaded into F-308s. All the target pails have new numbers see attached sheet for details. |
Monday, September 30, 2019, 11:36, Travis Cave, South Hot-Cell, Standard Operation, TM2, ZrC#8, Module move
|
TM#2 with ZrC#8 has been moved from the east station to the south hot cell. |
Monday, September 30, 2019, 14:05, Travis Cave, South Hot-Cell, Standard Operation, TM2, ZrC#8, Electrical Check
|
Results of the electrical check on TM#2 with ZrC#8 post beam. |
Tuesday, October 01, 2019, 14:38, Travis Cave, South Hot-Cell, Standard Operation, TM2, Ta#59, Electrical Check
|
The results of the electrical check on TM#2 with the Ta#59 target and without before the target was mounted on the module. |
Thursday, October 03, 2019, 10:25, Travis Cave, Spent Target Vault, Standard Operation, , ZrC#8, Spent Target Move
|
The spent ZrC#8 was moved from the south hot cell to the spent target vault. It was placed in pail 217 and the pail was placed in slot 3A of the vault, it was 205mSv/hr when removed from the hot cell. Also the pail was filled with junk stuff that included
wire, a wire scanner, IMG guage, target bolts and a water block bolts. Also there are only two spots left in the vault. |
Friday, October 04, 2019, 14:53, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#28, Module move
|
TM#4 with UC#28 has been moved from the south hot cell to the west target station. |
Tuesday, October 08, 2019, 09:02, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#27 and UC#28, Electrical Check
|
Results of the electrical check of TM4 without target and with UC27 and 28 |
Wednesday, October 09, 2019, 13:28, Travis Cave, Spent Target Vault, Standard Operation, , UC#27, Spent Target Move
|
The spent target in the south hot cell has been moved to the spent target vault. It was placed in spot 1B of the vault in pail number 218. See attached for vault details. |
Thursday, October 17, 2019, 11:49, Travis Cave, Spent Target Vault, Standard Operation, , SiC#31,32 and UC#19,20,21, Loading F-308
|
The targets in the mini storage have been loaded into the F-308. |
Thursday, October 24, 2019, 14:11, Travis Cave, ITW, Standard Operation, TM4, UC#29, Module move
|
TM#4 with UC29 has been moved from the south hot cell to the west target station. |
Monday, October 28, 2019, 11:50, Travis Cave, Spent Target Vault, Standard Operation, , UC#28, Spent Target Move
|
UC#28 has been moved from the south hot cell to spent target storage. The target was placed in pail number 219 and placed in spot 1C of the vault, it was 12.6mSv/hr upon removal from the south hot cell. Also the spent target vault is now full and can not currently accept anymore targets. |
Tuesday, November 05, 2019, 10:19, Travis Cave, South Hot-Cell, Standard Operation, TM2, Ta#59, Module move
|
TM#2 with Ta#59 has been moved from the ITE to the south hot cell. |
Tuesday, November 05, 2019, 14:27, Travis Cave, South Hot-Cell, Standard Operation, TM2, Ta#59, Electrical Check
|
Results of the electrical check of TM#2 with the old Ta#59 target and target free. |
Tuesday, November 12, 2019, 10:07, Travis Cave, Spent Target Vault, Standard Operation, , Ta#59, Spent Target Move
|
The spent Ta#59 was moved from the south hot cell to the spent target vault. See the attached for details. |
Thursday, November 14, 2019, 13:52, Travis Cave, Spent Target Vault, Standard Operation, , UC#22,23,24, Targets repackaged
|
The targets UC#22,23,24 have been repackaged into the newer stronger pails, and have been placed back in the mini vault with new numbers. See attached PDF for details. |
|