  RH-ISAC, Page 45 of 138  Not logged in ELOG logo
ID Date Author Categorydown Type Module Target/Number Subject
  1929   Thursday, May 23, 2019, 08:39 Travis CaveSouth Hot-CellStandard OperationTM1no targetModule move

 TM#1 has been moved from the south hot cell to the northwest silo.

  1930   Thursday, May 23, 2019, 11:22 Travis CaveSouth Hot-CellMaintenance  Removing garbage from the south hot cell.

 A 55 Gal. drum was remotely lowered into the south hot cell. It was then filled with compressable waste. Then the drum was remotely removed from the south hot cell. The drum measured about 20microSv/hr upon removal from the south hot cell.

  1931   Friday, May 24, 2019, 09:11 Travis CaveSouth Hot-CellStandard OperationTM4no targetModule move

 TM#4 has been moved from the south west silo to the south hot cell.

  1933   Thursday, June 06, 2019, 10:01 Travis CaveSouth Hot-CellStandard OperationTM4no target, no source TrayElectrical Check

 Results from the electrical check of TM#4 at the south hot cell with no source tray. R&U are shorted and when meggered A&P have a value of 193k ohms. See attached for details.

Attachment 1: TM4_Electrical_Check_No_source_Tray_SHC_June_6_2019.pdf
TM4_Electrical_Check_No_source_Tray_SHC_June_6_2019.pdf
  1941   Thursday, June 13, 2019, 09:09 Travis CaveSouth Hot-CellStandard OperationTM4no target and no source trayModule move

 TM#4 has been moved from the conditioning station to the south hot cell. The module has no source tray.

  1945   Friday, June 21, 2019, 07:16 David WangSouth Hot-CellDevelopmentTM4 TM4 new source tray leak check at SHC.

New source tray was installed on TM4 yesterday. LD was used to pump down all water lines. Tube heater +D circuit has a big leak  around water block area. At base LR5.5 XE-5 atm.cc/sec, base pressure 170 mtorr, When Chad  moved this helium probe close to  water block area, The leak rate on LD went to maximum level right away. When the probe was moved out of water block area, the LR went back to base level. The test repeated again with same result. Also, Before helium spray test, I applied 80 psi air into the circuit. The air pressure can not be held in the circuit. The pressure drop on the line is quick. This shows a big leak on  D line as well. The rest water lines are fine. I pumped all of them down to LD bottom scale without problem. Chad and I helium sprayed window and MSP water blocks. No leak has been found.  The only line we have problem is the D line.

D line is still leak after repair and installation. We suspected the c-seals issue on this module. So, all water lines have been sprayed with helium for leak check.  Found "B" line target oven negative  is also leak. The rest line are good on helium spray leak check.  The further investigate on thi issue is taken place now.

  1952   Monday, July 22, 2019, 14:51 Adam NewsomeSouth Hot-CellStandard OperationTM4No TargetTM4 Move

TM4 has been moved from the South West silo to the South Hot Cell. New source tray, no target.

  1953   Friday, July 26, 2019, 11:28 David WangSouth Hot-CellStandard OperationTM4 TM4 move from SHC to TCS.

Tm4 has been moved from SHc to TCS without containment box. It is a new source tray on TM4.  A layer of plastic sheet was put on TH floor on module pass route during the move.

  1954   Friday, July 26, 2019, 11:41 David WangSouth Hot-CellStandard OperationTM4 TM4 with spare target electrical check and leak check.

Electrical check on TM4 with spare test target. PQ is still shorted to RU. But, The short between 60KV bias and PQRU which we found last time is gone.  Target to PQRU at 250V mega measurement: 22.08 M. All conductivity between ABCD are about 5.0 m ohm which are good. All other ohm meter and Mega measurements are OL. Helium spray leak check on HS target VCR fittings is passed. Two blank offs are installed on source tray window cool lines. They passed  leak checked at SHC as well. 

  1957   Wednesday, July 31, 2019, 08:57 Adam NewsomeSouth Hot-CellStandard OperationTM4No TargetTM4 Move

TM4 has been moved from the Conditioning Station to the South Hot Cell. No target.

  1960   Tuesday, August 13, 2019, 09:49 Adam NewsomeSouth Hot-CellStandard OperationTM2Ta 58TM2 Move

TM2 was moved from ITE to South Hot Cell. Tantalum 58 target.

  1962   Wednesday, August 14, 2019, 11:43 Travis CaveSouth Hot-CellStandard OperationTM2Ta#58 and no target.Results of electrical checks post beam at the south hot cell.

 Here are the results of the electrical done at the south hot cell post beam of with the Ta#58 target attached and with just the module no target attached.

Attachment 1: TM2_elec_chk_Ta58_post_beam_shc.pdf
TM2_elec_chk_Ta58_post_beam_shc.pdf
Attachment 2: TM2_Elec_chk_no_tgt_shc_Aug-14-2019.pdf
TM2_Elec_chk_no_tgt_shc_Aug-14-2019.pdf
  1964   Thursday, August 15, 2019, 09:45 Travis CaveSouth Hot-CellStandard OperationTM2ZrC#8Electrical Check

 Electrical of TM#2 with ZrC#8 at the south hot cell. See attached for details.

Attachment 1: TM2_elec_chk_with_ZrC8_at_SHC_Aug_17_2019.pdf
TM2_elec_chk_with_ZrC8_at_SHC_Aug_17_2019.pdf
  1969   Thursday, August 22, 2019, 09:20 Travis CaveSouth Hot-CellStandard OperationTM4no targetModule move

 TM#4 has been moved from the south west silo to the south hot cell.

  1972   Thursday, August 29, 2019, 12:54 Adam NewsomeSouth Hot-CellStandard OperationTM3 TM3 Move

TM3 has been moved from the Middle-East silo to the South Hot Cell.

  1973   Tuesday, September 03, 2019, 10:48 Adam NewsomeSouth Hot-CellStandard OperationTM3 TM3 Move

TM3 has been moved from the South Hot-Cell to the Middle-East silo.

  1974   Tuesday, September 03, 2019, 10:49 Adam NewsomeSouth Hot-CellStandard OperationTM4 TM4 Move

TM4 has been moved from the Conditioning Station to the South Hot-Cell.

  1975   Wednesday, September 04, 2019, 13:53 chad fisherSouth Hot-CellRepairTM4 TM3 CB to TM4

The TM3 containment box has been installed onto TM4. No issues, leak checked ok.

 

  1976   Thursday, September 05, 2019, 11:37 chad fisherSouth Hot-CellStandard OperationTM4UCx#27UCx#27 install

Dummy Ta target has been removed from TM4 and UCx#27 installed

  1977   Thursday, September 05, 2019, 14:18 Adam NewsomeSouth Hot-CellStandard OperationTM4UCx#27TM4 Move

TM4 with UCx#27 target has been moved from the South Hot-Cell to the Conditioning Station.