  1929   Thursday, May 23, 2019, 08:39 Travis CaveSouth Hot-CellStandard OperationTM1no targetModule move

 TM#1 has been moved from the south hot cell to the northwest silo.

  1930   Thursday, May 23, 2019, 11:22 Travis CaveSouth Hot-CellMaintenance  Removing garbage from the south hot cell.

 A 55 Gal. drum was remotely lowered into the south hot cell. It was then filled with compressable waste. Then the drum was remotely removed from the south hot cell. The drum measured about 20microSv/hr upon removal from the south hot cell.

  1931   Friday, May 24, 2019, 09:11 Travis CaveSouth Hot-CellStandard OperationTM4no targetModule move

 TM#4 has been moved from the south west silo to the south hot cell.

  1933   Thursday, June 06, 2019, 10:01 Travis CaveSouth Hot-CellStandard OperationTM4no target, no source TrayElectrical Check

 Results from the electrical check of TM#4 at the south hot cell with no source tray. R&U are shorted and when meggered A&P have a value of 193k ohms. See attached for details.

  1934   Friday, June 07, 2019, 08:56 Travis CaveConditioning StationStandard OperationTM4no targetModule move

 TM#4 has been moved from the south hot cell to the conditioning station.

  1937   Monday, June 10, 2019, 14:13 Travis CaveSpent Target VaultStandard Operation  Old TM#4 source tray moved

 The old TM#4 source tray in the south hot cell was moved to the spent target vault. The tray had a low of 7.5mSv/hr to a high of 22.1mSv/hr though a 390 degree rotation.

  1941   Thursday, June 13, 2019, 09:09 Travis CaveSouth Hot-CellStandard OperationTM4no target and no source trayModule move

 TM#4 has been moved from the conditioning station to the south hot cell. The module has no source tray.

  1951   Tuesday, July 16, 2019, 08:44 Travis CaveConditioning StationStandard OperationTM4no targetModule move

 TM4 has been moved from the conditioning station to the south west silo. Module was placed with the turbo pump facing south which puts the windows facing north and south and the shutter facing west. 

  1962   Wednesday, August 14, 2019, 11:43 Travis CaveSouth Hot-CellStandard OperationTM2Ta#58 and no target.Results of electrical checks post beam at the south hot cell.

 Here are the results of the electrical done at the south hot cell post beam of with the Ta#58 target attached and with just the module no target attached.

  1964   Thursday, August 15, 2019, 09:45 Travis CaveSouth Hot-CellStandard OperationTM2ZrC#8Electrical Check

 Electrical of TM#2 with ZrC#8 at the south hot cell. See attached for details.

  1969   Thursday, August 22, 2019, 09:20 Travis CaveSouth Hot-CellStandard OperationTM4no targetModule move

 TM#4 has been moved from the south west silo to the south hot cell.

  1978   Thursday, September 05, 2019, 14:26 Travis CaveSouth Hot-CellStandard OperationTM4UC#27Electrical Check

 The results of the electrical check of TM#4 with UC#27 attached to it.

  1979   Thursday, September 05, 2019, 14:26 Travis CaveSouth Hot-CellStandard OperationTM4UC#27Electrical Check

 The results of the electrical check of TM#4 with UC#27 attached to it.

  1987   Wednesday, September 18, 2019, 14:28 Travis CaveSpent Target VaultStandard Operation  Repacking of the targets.

 Three of the five targets in the mini storage have been repackaged into the stronger pail.

  1988   Thursday, September 19, 2019, 10:11 Travis CaveSpent Target VaultStandard Operation  Repacking of the targets.

 Another target in the mini storage has been repackaged into the new pails. With one remaining to do which will be done on Monday.

  1989   Monday, September 23, 2019, 13:21 Travis CaveSpent Target VaultStandard Operation  Repacking of the targets.

 All targets in the mini vault have been repackaged and are now ready to be loaded into F-308s. All the target pails have new numbers see attached sheet for details.

  1991   Monday, September 30, 2019, 11:36 Travis CaveSouth Hot-CellStandard OperationTM2ZrC#8Module move

 TM#2 with ZrC#8 has been moved from the east station to the south hot cell.

  1992   Monday, September 30, 2019, 14:05 Travis CaveSouth Hot-CellStandard OperationTM2ZrC#8Electrical Check

 Results of the electrical check on TM#2 with ZrC#8 post beam.

  1995   Tuesday, October 01, 2019, 14:38 Travis CaveSouth Hot-CellStandard OperationTM2Ta#59Electrical Check

 The results of the electrical check on TM#2 with the Ta#59 target and without before the target was mounted on the module.

  1998   Thursday, October 03, 2019, 10:25 Travis CaveSpent Target VaultStandard Operation ZrC#8Spent Target Move

 The spent ZrC#8 was moved from the south hot cell to the spent target vault. It was placed in pail 217 and the pail was placed in slot 3A of the vault, it was 205mSv/hr when removed from the hot cell. Also the pail was filled with junk stuff that included 

wire, a wire scanner, IMG guage, target bolts and a water block bolts. Also there are only two spots left in the vault.