  RH-ISAC, Page 43 of 138  Not logged in ELOG logo
Entry  Wednesday, May 11, 2016, 09:44, Travis Cave, Conditioning Station, Standard Operation, TM2, Ta#48, module moved 
TM#2 with Ta#48 has been moved from the south hot cell to the conditioning station.
Entry  Monday, May 16, 2016, 13:26, Anders Mjos, Conditioning Station, Standard Operation, TM2, Ta#48, Conditioning Ta#48 Ta#48.docx
 Monday, May 16, 2016, 13:20: BIAS/EL/EE 30 / 15 / 1.5 kV
Monday, May 16, 2016, 13:20: Ramping TGHT / TBHT to 580 / 220 A at 2 A/min. IG2 1E-6 / 2E-6 T
Monday, May 16, 2016, 15:45: Paused ramping.
Entry  Friday, May 20, 2016, 08:13, David Wang, Conditioning Station, Standard Operation, TM2, Ta#48, I switched off TCS and TM2 water system 
Disconnected  TM2 at TCS(vacuum system still on). Purged all TM2 water lines for helium pressure test.
Entry  Friday, May 20, 2016, 10:38, David Wang, Conditioning Station, Standard Operation, TM2, Ta#48, Helium pressure test on TM2 with new Lp Ta target 
LD base LR: 0.0 X E-9. Base pressure:0.0 X E-4. 70 psi helium. 5 minutes each circuit.

    
        
            window
 
          0.0X E-9
             
        
        
            HS
    
Entry  Tuesday, May 24, 2016, 10:39, David Wang, Conditioning Station, Standard Operation, TM2, Ta#48, TM2 and TCS turbo-pumps have been switched off this morning. 
The TCS and TM2 are still under vacuum without venting
Entry  Wednesday, May 25, 2016, 10:57, Travis Cave, ITW, Standard Operation, TM2, Ta#48, module moved 
TM#2 with Ta#48 has been moved from conditioning station to the west target station.
Entry  Wednesday, May 25, 2016, 14:08, David Wang, ITW, Standard Operation, TM2, Ta#48, TM2 has been connected in ITW 
TM2 has been connected in ITW by Dan.M and David.W. All turbo-pumps have been started. Everything is good so fine.
Entry  Monday, July 11, 2016, 10:59, Travis Cave, Spent Target Vault, Standard Operation, , Ta#48, Spent Target move Vault_Storage_July_11_2016.pdf
The spent Ta#48 was moved from the south hot cell to the spent target vault. I was placed in pail 139 and is in spot 6C in the vault. It was 201mSv/hr
when measured at the hot cell. See the attached PDF for the latest results.
Entry  Wednesday, April 06, 2016, 14:03, chad fisher, South Hot-Cell, Standard Operation, TM4, Ta#47, UCx#14 removed Ta#47 installed 
UCx#14 has been removed from TM4 and Ta#47 installed. No marks on 9 pin connector on UCx#14.
Entry  Thursday, April 07, 2016, 09:24, Travis Cave, Conditioning Station, Maintenance, TM4, Ta#47, module moved 
TM#4 has been moved from the south hot cell to the conditioning station.
Entry  Tuesday, April 12, 2016, 09:08, Travis Cave, ITE, Standard Operation, TM4, Ta#47, module moved 
TM#4 with Ta#47 has been moved from the conditioning station to the east target station.
Entry  Tuesday, June 07, 2016, 11:36, David Wang, ITE, Standard Operation, TM4, Ta#47, TM4 has been disconnected in ITE. 
Dan and I disconnected TM4 in ITE. HS water lines has been purged.
Entry  Tuesday, June 07, 2016, 11:37, David Wang, ITE, Standard Operation, TM4, Ta#47, TM4 has been moved from ITE to SHC 
Bill and Yasmine did the move. Everything is good.
Entry  Tuesday, June 07, 2016, 11:42, David Wang, South Hot-Cell, Standard Operation, TM4, Ta#47, electrical check on TM4 with old Ta target at SHC. electrical_check_2016-06-07._TM4_with_old_Lp_Ta_target..pdfelectrical_check_2016-06-07._TM4_with_old_Lp_Ta_target..pdf
I did an electrical check on TM4 with the old target still installed. The number is a little bit low on 500V mega check between chassis and 60KVbias
which is 146Mohm. Others are good.    See attachment
I wrote all OL to 0  in attachment 1 ohmmeter check. Please See attachment 2 for correction.
Entry  Wednesday, June 15, 2016, 09:39, Travis Cave, Spent Target Vault, Standard Operation, , Ta#47, Spent Target move Vault_Storage_June_15_2016.pdf
The spent Ta#47 target has been moved from the south hot cell to the spent target vault. It was placed in pail #137 in spot 4C of the vault. It was 114mSv/hr
upon removal from the vault.
Entry  Tuesday, September 22, 2015, 11:39, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#46, Electrical Check TM4Ta46elecchkSHC.PDF
TM#4 electrical check with Ta#46 attached.
Entry  Tuesday, September 22, 2015, 13:15, David Wang, South Hot-Cell, Standard Operation, , Ta#46, Leak check on TM4 HS water line with new Ta#46 target. at SHC 
Chad and I leak checked the HS line at SHC. No leak. Leak rate 0.0xE-9atm.cc/sec.
Entry  Wednesday, September 23, 2015, 08:38, Travis Cave, Conditioning Station, Standard Operation, TM4, Ta#46, Module moved 
TM#4 with Ta#46 has been moved from the south hot cell to the conditioning station.
Entry  Wednesday, September 23, 2015, 13:56, Travis Cave, Conditioning Station, Standard Operation, TM4, Ta#46, Electrical Check TM4Ta46elecchkCS.PDF
TM#4 electrical check at the conditioning station with Ta#46 target.
Entry  Wednesday, September 23, 2015, 14:35, David Wang, Conditioning Station, Standard Operation, TM4, Ta#46, TM4 has been connected at CS 
TM4 has been connected at CS. Turbo- pumps and water system are started and running . The HV cover has been installed on the module. Everything is good
so far.