ID Date Author Categorydown Type Module Target/Number Subject Text Attachments
  1719   Wednesday, May 23, 2018, 09:48 Travis CaveSouth Hot-CellStandard OperationTM4no targetModule move TM#4 with no target and no containment
box has been moved from the conditioning
station to the south hot cell.
  
  1720   Wednesday, May 23, 2018, 10:40 chad fisherSouth Hot-CellRepairTM4 Optics Tray RemovalThe optics tray has been removed from TM4.
 
 
 20180523_103405.jpg20180523_103435.jpg20180523_103440.jpg 
  1722   Thursday, May 24, 2018, 14:04 Travis CaveSouth Hot-CellStandard OperationTM4no targetModules moved TM#4 has been moved from the south
hot cell to the east target station, and
TM#2 has been moved from the south silo to
  
  1724   Friday, May 25, 2018, 11:41 Travis CaveSouth Hot-CellStandard OperationTM2no targetModule moveTM#2 has been moved from the south hot
cell to the conditioning station.
  
  1728   Thursday, May 31, 2018, 14:22 chad fisherSouth Hot-CellRepairTM4 Loop and beam shieldTray with loop and beam shield has been
inserted into the hot cell to be installed
on TM4 .
  
  1729   Monday, June 04, 2018, 13:27 chad fisherSouth Hot-CellRepairTM4 Window Loop and ShieldThe tray with window waterline loop and
EF Shield has been installed into TM4.
 jhgf.jpg 
  1730   Thursday, June 07, 2018, 11:33 Travis CaveSouth Hot-CellStandard OperationTM4UC#22Electrical Check The results of TM#4 with UC#22 electrical
check. See attached PDF.
 TM4_UC22_Electrical_Check_South_Hot_Cell.pdf 
  1733   Friday, June 08, 2018, 11:36 chad fisherSouth Hot-CellRepairTM2 TM2 Source Tray Removal ProgressThe containment box has been removed from
TM2, the Enzel lens and steerers disconnected
and optics tray removal has commenced.
 TM2_06082018.jpg 
  1734   Friday, June 08, 2018, 14:24 Travis CaveSouth Hot-CellStandard OperationTM2no targetModule move TM#2 has been moved from the conditioning
station to the south hot cell.
  
  1735   Monday, June 11, 2018, 11:30 chad fisherSouth Hot-CellRepairTM2 TM2 containment box onTm2 containment box has been re-installed
onto TM2.
  
  1736   Tuesday, June 12, 2018, 11:26 chad fisherSouth Hot-CellRepairTM2 TM4 Optics TrayI have "slung" the TM4 optics
tray in preparation for its removal.
 fh.jpg 
  1739   Friday, June 22, 2018, 13:59 chad fisherSouth Hot-CellRepair  Soth Hot Cell FieldsField measurements have been taken to determine
the level before entry for repair of manipulators.
Field on contact at manipulator is
  
  1740   Monday, June 25, 2018, 11:31 chad fisherSouth Hot-CellStandard Operation  Fields at Al coverThe shield door has been opened and fields
measured at 77 uSv/h on contact at the AL.
panel.
  
  1742   Tuesday, June 26, 2018, 08:56 chad fisherSouth Hot-CellStandard Operation  South Hot Cell Fieldshot items have been moved and shielded
as much as possible. Field at left manipulator
has been reduced from 560 uSv/h to 85 uSv/h.
  
  1743   Wednesday, June 27, 2018, 14:56 Travis CaveSouth Hot-CellStandard OperationTM2no targetModule move TM2 has been moved from the silo
to the south hot cell.
  
  1744   Friday, June 29, 2018, 10:12 chad fisherSouth Hot-CellMaintenance  Manipulator Tong Cable ReplacementTuesday, June 26 the broken tong cable
was replaced on the west manipulator in the
south hot cell. Wednesday the tong cable
  
  1745   Friday, June 29, 2018, 10:15 chad fisherSouth Hot-CellStandard OperationTM2 TM2 work and target installOn Thursday, June 29th the containment
box of TM2 was removed and the optics tray
re-installed and reconnected. The box was
  
  1746   Friday, June 29, 2018, 10:27 chad fisherSouth Hot-CellMaintenance  South Hot Cell Filter ChangeAt the end of manipulator repair Thursday
the ventilation pre-filter in the hot cell
was changed. Old filter remains in the hot
  
  1747   Friday, June 29, 2018, 13:36 Travis CaveSouth Hot-CellStandard OperationTM2Nb#8Electrical Check The results of the various electrical
checks performed on the TM#2 with and without
the Nb#8 target attached.
 TM2_elec_chk_steerers_and_lens_062818.pdfTM2_Nb8_elec_chk_shc.pdfTM2_notgt_elec_chk_shc_062918.pdf 
  1754   Wednesday, July 18, 2018, 14:20 chad fisherSouth Hot-CellStandard OperationTM4Ta#56Ta#56 InstalledTa#56 has been installed onto TM4 with
new fasteners. High current fasteners torqued
to 130 in lbs.
  