1709
|
Thursday, May 03, 2018, 13:26 |
Anders Mjos | South Hot-Cell | Repair | TM4 | | EZL short troubleshooting | Yesterday Aaron, Isaac and Anders inspected
the EZL connection from the service chase
to the optics tray using the goose neck camera |
|
1711
|
Friday, May 04, 2018, 15:46 |
Anders Mjos | South Hot-Cell | Repair | TM4 | | EZL short troubleshooting |
|
|
1719
|
Wednesday, May 23, 2018, 09:48 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Module move | TM#4 with no target and no containment
box has been moved from the conditioning
station to the south hot cell. |
|
1720
|
Wednesday, May 23, 2018, 10:40 |
chad fisher | South Hot-Cell | Repair | TM4 | | Optics Tray Removal | The optics tray has been removed from TM4.
|
  |
1722
|
Thursday, May 24, 2018, 14:04 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Modules moved | TM#4 has been moved from the south
hot cell to the east target station, and
TM#2 has been moved from the south silo to |
|
1724
|
Friday, May 25, 2018, 11:41 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Module move | TM#2 has been moved from the south hot
cell to the conditioning station. |
|
1728
|
Thursday, May 31, 2018, 14:22 |
chad fisher | South Hot-Cell | Repair | TM4 | | Loop and beam shield | Tray with loop and beam shield has been
inserted into the hot cell to be installed
on TM4 . |
|
1729
|
Monday, June 04, 2018, 13:27 |
chad fisher | South Hot-Cell | Repair | TM4 | | Window Loop and Shield | The tray with window waterline loop and
EF Shield has been installed into TM4. |
|
1730
|
Thursday, June 07, 2018, 11:33 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#22 | Electrical Check | The results of TM#4 with UC#22 electrical
check. See attached PDF. |
|
1733
|
Friday, June 08, 2018, 11:36 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Source Tray Removal Progress | The containment box has been removed from
TM2, the Enzel lens and steerers disconnected
and optics tray removal has commenced. |
|
1734
|
Friday, June 08, 2018, 14:24 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Module move | TM#2 has been moved from the conditioning
station to the south hot cell. |
|
1735
|
Monday, June 11, 2018, 11:30 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 containment box on | Tm2 containment box has been re-installed
onto TM2. |
|
1736
|
Tuesday, June 12, 2018, 11:26 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM4 Optics Tray | I have "slung" the TM4 optics
tray in preparation for its removal. |
|
1739
|
Friday, June 22, 2018, 13:59 |
chad fisher | South Hot-Cell | Repair | | | Soth Hot Cell Fields | Field measurements have been taken to determine
the level before entry for repair of manipulators.
Field on contact at manipulator is |
|
1740
|
Monday, June 25, 2018, 11:31 |
chad fisher | South Hot-Cell | Standard Operation | | | Fields at Al cover | The shield door has been opened and fields
measured at 77 uSv/h on contact at the AL.
panel. |
|
1742
|
Tuesday, June 26, 2018, 08:56 |
chad fisher | South Hot-Cell | Standard Operation | | | South Hot Cell Fields | hot items have been moved and shielded
as much as possible. Field at left manipulator
has been reduced from 560 uSv/h to 85 uSv/h. |
|
1743
|
Wednesday, June 27, 2018, 14:56 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Module move | TM2 has been moved from the silo
to the south hot cell. |
|
1744
|
Friday, June 29, 2018, 10:12 |
chad fisher | South Hot-Cell | Maintenance | | | Manipulator Tong Cable Replacement | Tuesday, June 26 the broken tong cable
was replaced on the west manipulator in the
south hot cell. Wednesday the tong cable |
|
1745
|
Friday, June 29, 2018, 10:15 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | | TM2 work and target install | On Thursday, June 29th the containment
box of TM2 was removed and the optics tray
re-installed and reconnected. The box was |
|
1746
|
Friday, June 29, 2018, 10:27 |
chad fisher | South Hot-Cell | Maintenance | | | South Hot Cell Filter Change | At the end of manipulator repair Thursday
the ventilation pre-filter in the hot cell
was changed. Old filter remains in the hot |
|