Entry  Thursday, July 04, 2019, 08:57, Isaac Earle, Safe Module Parking, Development, , , SMP vacuum system installed 20190703_122635.jpg20190703_122646.jpg20190703_122702.jpg
 July 3:
- Assembled exhaust line flexible hose and fittings as per ISK0529 Rev D then leak checked: 1.4E-1 Torr test port pressure, 1.1E-7 atm-cc/s leak
rate, no response to helium spray at both ends of flexible line (all vacuum fittings purchased from Kurt Lesker under Requisition #1046936)
-
Entry  Friday, June 21, 2019, 07:16, David Wang, South Hot-Cell, Development, TM4, , TM4 new source tray leak check at SHC. 
New source tray was installed on TM4 yesterday. LD was used to pump down all water lines. Tube heater +D circuit has a big leak  around water block
area. At base LR5.5 XE-5 atm.cc/sec, base pressure 170 mtorr, When Chad  moved this helium probe close to  water block area, The leak rate on
LD went to maximum level right away. When the probe was moved out of water block area, the LR went back to base level. The test repeated again with same
Entry  Thursday, June 20, 2019, 15:09, Isaac Earle, Safe Module Parking, Development, , , SMP motor wiring inspected by electrician 
The AC wiring for the SMP motor was inspected by Randy Boehm (TRIUMF electrician) as recommended by Franco Mammarella (TRIUMF electrical engineer). 
After inspecting the system Randy required the following changes:

    AC wiring inside the control panel be increased to 16awg minimum (14awg preferred)
    Wiring between the control panel and
Entry  Friday, June 14, 2019, 08:15, David Wang, ITE, Standard Operation, TM2, , 5 shielding blocks are moved to ITE.  
ITE is configured to take proton beam.
Entry  Thursday, June 13, 2019, 10:55, David Wang, Conditioning Station, Repair, TM4, , TM4 HV test at TCS without source tray. 
I brought up TCS bias to 57.5 KV on TM4 without source tray at TCS. It was kept at this level about 1.0 hours. Some intermediate sparks. No spark trip
on devices. 57.5KV is very close to the HV up limit of this module. 
Entry  Thursday, June 13, 2019, 09:09, Travis Cave, South Hot-Cell, Standard Operation, TM4, no target and no source tray, Module move 
 TM#4 has been moved from the conditioning station to the south hot cell. The module has no source tray.
Entry  Wednesday, June 12, 2019, 08:56, Carla Babcock, Conditioning Station, Maintenance, TM4, No target, More TM4 conditioning without source tray 
The conditioning station was ramped down overnight and David ramped it back up this morning. Currently trying to get it to sit stable at something higher
than 55kV.
 
Entry  Monday, June 10, 2019, 18:12, Carla Babcock, Conditioning Station, Maintenance, TM4, No target, Attempt to push bias > 56kV Screenshot_-_06102019_-_06_43_17_PM.png
Monday, June 10, 2019, 16:59 : TM4 back up to BIAS / EL = 56.1kV / 29.5kV
Monday, June 10, 2019, 17:14 : After 57kV on the bias, things seem to be getting sketchy. The EL voltage and current are a bit jumpy and stepping
that voltage up seems to produce a slight spike in the bias current.
Entry  Monday, June 10, 2019, 16:22, Carla Babcock, Conditioning Station, Maintenance, TM4, No target, Ramping V on TM4, no HV cover in TH 
Ramped down the bias so David could remove the HV cover and lock out the target hall.
Ramped back up to BIAS / EL = 50kV / 26kV quickly with no sparks.
Monday, June 10, 2019, 15:35 : BIAS / EL = 52kV / 26kV
Entry  Monday, June 10, 2019, 14:13, Travis Cave, Spent Target Vault, Standard Operation, , , Old TM#4 source tray moved 
 The old TM#4 source tray in the south hot cell was moved to the spent target vault. The tray had a low of 7.5mSv/hr to a high of 22.1mSv/hr though
a 390 degree rotation.
Entry  Monday, June 10, 2019, 08:26, Carla Babcock, Conditioning Station, Maintenance, TM4, No target, Ramping voltage on TM4 w/o source tray 
TM4 in conditioning station with no source tray, extraction electrode set to HV bias. Brought up to 30kV over the weekend by ISAC ops with no issues.
BIAS=30kV
EL=15kV
Entry  Friday, June 07, 2019, 13:11, David Wang, Conditioning Station, Development, TM4, , TCS and TM4.  
TM4 has been connected at TCS for HV test. TCS water system and vacuum pumps are switched on. 
Entry  Friday, June 07, 2019, 08:56, Travis Cave, Conditioning Station, Standard Operation, TM4, no target, Module move 
 TM#4 has been moved from the south hot cell to the conditioning station.
Entry  Thursday, June 06, 2019, 10:01, Travis Cave, South Hot-Cell, Standard Operation, TM4, no target, no source Tray, Electrical Check TM4_Electrical_Check_No_source_Tray_SHC_June_6_2019.pdf
 Results from the electrical check of TM#4 at the south hot cell with no source tray. R&U are shorted and when meggered A&P have a value
of 193k ohms. See attached for details.
Entry  Tuesday, June 04, 2019, 08:46, David Wang, ITE, Standard Operation, TM2, , ITE water signal interlock check. 
ITE water signal interlock check is done. Everything is good. Coil 2   circuit no longer used in ITE . PQRU are looped as one circuit fro coil 1
circuit on Module since now. 
Entry  Friday, May 24, 2019, 09:11, Travis Cave, South Hot-Cell, Standard Operation, TM4, no target, Module move 
 TM#4 has been moved from the south west silo to the south hot cell.
Entry  Thursday, May 23, 2019, 11:22, Travis Cave, South Hot-Cell, Maintenance, , , Removing garbage from the south hot cell. 
 A 55 Gal. drum was remotely lowered into the south hot cell. It was then filled with compressable waste. Then the drum was remotely removed from
the south hot cell. The drum measured about 20microSv/hr upon removal from the south hot cell.
Entry  Thursday, May 23, 2019, 08:39, Travis Cave, South Hot-Cell, Standard Operation, TM1, no target, Module move 
 TM#1 has been moved from the south hot cell to the northwest silo.
Entry  Wednesday, May 22, 2019, 11:52, David Wang, Conditioning Station, Maintenance, TM1, , TM1 inpsection. 
TM1 shielding plates and their holding bolts are inspected. No corrosion.  TM1 is located at TCS now. Both TP1 and TP2 are started.
Entry  Wednesday, May 22, 2019, 11:50, David Wang, ITE, Standard Operation, TM4, , TM2 has been connected in ITE. Ta58#TM2ITE_2019_June_._Conenction_checklist.pdf
TM2 has been connected in ITE. high active water system and vacuum pumps are started. The pumping down on TM2 and ITE is good  so far.
See attachment for connection checklist.