  1565   Monday, June 26, 2017, 11:42 Travis CaveSouth Hot-CellStandard OperationTM4UC#20Module move TM#4 with UC#20 has been moved from
the east target station to the south hot
cell. Also the shield plug was remotely installed
  
  1567   Tuesday, June 27, 2017, 09:14 Travis CaveConditioning StationStandard OperationTM4Ta#52Module move TM#4 with Ta#52 has been moved from
south hot cell to the conditioning station.
  
  1570   Wednesday, June 28, 2017, 09:14 Travis CaveConditioning StationStandard OperationTM4Ta#52Electrical CheckResults of electrical check of TM#4 with
Ta#52 at the south hot cell and the conditioning
station under vacuum.
 TM4_Ta52_Elec_chk_SHC_CSvac.PDF 
  1575   Thursday, June 29, 2017, 14:42 Travis CaveSpent Target VaultStandard Operation UC#20Spent Target Move The spent UC#20 has been moved from
the south hot cell to the spent target vault.
It was placed in pail #150 and spot 1B in
 Vault_Storage_June_29_2017.pdf 
  1581   Tuesday, July 11, 2017, 10:20 Travis CaveITEStandard OperationTM4Ta#52Module move TM#4 with Ta#52 has been moved from
the conditioning station to the east target
station.
  
  1583   Thursday, July 13, 2017, 10:53 Travis CaveConditioning StationStandard OperationTM3no targetModule move TM#3 has been moved from the north
east silo to the conditioning station.
  
  1586   Tuesday, July 18, 2017, 15:04 Travis CaveCraneMaintenance  Failure of the ISAC TH Crane Rotate. Earlier in the day it was noted that
the rotate function of the crane had creased
operation. After David has finished the block
  
  1588   Monday, July 31, 2017, 09:44 Travis CaveConditioning StationStandard OperationTM3no targetModule move TM#3 has been moved back to the NE
silo from the conditioning station.
  
  1589   Tuesday, August 01, 2017, 14:39 Travis CaveSouth Hot-CellStandard OperationTM2SiC#36Electrical CheckThe electrical check of TM#2 with SiC#36
attached. Post beam at the south hot cell.
See attached results allow the before beam
 TM2_SiC36_SHC_elec_chk.PDFTM2_SiC36_Postbeam_SHC_elec_chk.PDF 
  1593   Thursday, August 03, 2017, 15:02 Travis CaveSpent Target VaultStandard Operation SiC#36Spent Target Move The spent SiC#36 has been moved from
the south hot cell to the spent target vault.
 Vault_Storage_August_3_2017.pdf 
  1595   Tuesday, August 08, 2017, 13:26 Travis CaveITWStandard OperationTM2Ta#53module movedTM#2 with Ta#53 has been moved from the
conditioning station to the west target station.
  
  1602   Monday, August 28, 2017, 11:28 Travis CaveITEStandard OperationTM4Ta#52Module move TM#4 with Ta#52 has been moved from
the east station to the south hot cell.
  
  1604   Monday, August 28, 2017, 14:34 Travis CaveConditioning StationStandard OperationTM4UC#21Module move TM#4 with UC#21 has been moved from
the south hot cell to the conditioning station.
  
  1605   Monday, August 28, 2017, 14:40 Travis CaveSouth Hot-CellStandard OperationTM4UC#21Electrical CheckThe results of the electrical check of
TM#4 with UC#21 attached.
 TM4_UC21_elecchk_SHC.PDF 
  1608   Wednesday, August 30, 2017, 11:37 Travis CaveSpent Target VaultStandard Operation Ta#52Spent Target moveThe spent Ta#52 target has been moved from
the south hot cell to the spent target vault.
See attached PDF for details.
 Vault_Storage_August_30_2017.pdf 
  1610   Tuesday, September 05, 2017, 10:25 Travis CaveITEStandard OperationTM4UC#21Module move TM#4 with UC#21 has been moved from
the conditioning station to the east target
station.
  
  1611   Friday, September 08, 2017, 11:20 Travis CaveConditioning StationStandard OperationTM3no targetModule move TM#3 has been moved from the north
east silo to the conditioning station.
  
  1616   Friday, September 15, 2017, 14:12 Travis CaveConditioning StationStandard OperationTM3no targetModule move TM#3 has been moved back to the silo
from the conditioning station.
  
  1618   Tuesday, September 19, 2017, 13:53 Travis CaveSouth Hot-CellStandard OperationTM2Ta#53Module move TM#2 with Ta#53 has been moved from
the west target station to the south hot
cell.
  
  1620   Thursday, September 21, 2017, 10:48 Travis CaveSouth Hot-CellStandard OperationTM2Ta#53Electrical CheckElectrical checks of TM#2 with Ta#53 and
also with out a target.
 TM2_Ta53_elec_chk_shc.PDFTM2_Ta53_elec_chk_post_beam_shc.PDFTM2_notgt_elec_chk_shc_09202017.PDF 