ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
1991
|
Monday, September 30, 2019, 11:36 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | ZrC#8 | Module move |
TM#2 with ZrC#8 has been moved from the east station to the south hot cell. |
1990
|
Monday, September 30, 2019, 11:27 |
Isaac Earle | Safe Module Parking | Development | | | SMP vacuum vessel modifications completed |
The SMP vacuum vessel welds were reinforced to match the specifications on IRH1710 Rev D. In addition a tube stub was added on the side of the vessel for installation of a PRV. The relief valve installed was Accu-Glass 113150, with 2psi setpoint (not the MDC 420036 model specified on IRH1710 Rev D). The drawing will be updated to reflect this.
Welding was performed in the TRIUMF machine shop. A larger capacity forklift was rented to move the vessel back and forth between the shop and the Meson Hall loading bay where the main crane was used to flip the vessel between welds.
After welding the vessel was leak checked using a blank-off plate (helium leak tight). The vessel was then returned to the Target Hall, the top flange IRH1755 was re-installed, and the TCS shield plug was installed on the flange. The vessel was pumped down over the weekend using the SMP vacuum pump, and reached 8mTorr by Monday morning. A helium leak check was performed in the Target Hall: baseline leak rate 0.0E-9 atm-cc/sec, 0.0E-4Torr port pressure, no response to generous helium spray on PRV and around both seal locations for the top flange.
Remaining re-assembly of the SMP will now proceed. |
1989
|
Monday, September 23, 2019, 13:21 |
Travis Cave | Spent Target Vault | Standard Operation | | | Repacking of the targets. |
All targets in the mini vault have been repackaged and are now ready to be loaded into F-308s. All the target pails have new numbers see attached sheet for details. |
Attachment 1: Target_Index_2019-09-23_Mini_Vault.pdf
|
|
1988
|
Thursday, September 19, 2019, 10:11 |
Travis Cave | Spent Target Vault | Standard Operation | | | Repacking of the targets. |
Another target in the mini storage has been repackaged into the new pails. With one remaining to do which will be done on Monday. |
1987
|
Wednesday, September 18, 2019, 14:28 |
Travis Cave | Spent Target Vault | Standard Operation | | | Repacking of the targets. |
Three of the five targets in the mini storage have been repackaged into the stronger pail. |
1986
|
Tuesday, September 17, 2019, 07:37 |
Carla Babcock | ITE | Development | TM2 | ZrC#8 | end of run HV investigations |
Ramping up HV to ~30kV, encountered problems and had to drop back to 28kV. No response on IG1 or anything else during sparks. Lots of charging-type behaviour on the bias current. Protons at 55uA
Tuesday, September 17, 2019, 02:02 : 15 mins with only 1 spark at 30kV so increased the bias
Tuesday, September 17, 2019, 02:31 : 32kV. Current unstable
Tuesday, September 17, 2019, 02:41 : Current continues extremely unstable but not much sparking....
Tuesday, September 17, 2019, 02:53 : Proton beam trip initially settled the bias current down, but then current began climbing pretty steeply with protons still off
Tuesday, September 17, 2019, 03:28 : Protons dropped to 40uA from 55uA, Bias current is much more stable and no sparks for 25mins
Tuesday, September 17, 2019, 03:36 : Raising voltage easy to about 33.5kV then instability and sparking similar to around 31kV at 55uA p+
Tuesday, September 17, 2019, 04:45 : Lowered protons to 25uA and no sparks though the current is not stable
More things but forgot to write them down. Spreadsheet attached. |
Attachment 1: HVtests_TM2_Sept172019.xlsx
|
1985
|
Friday, September 13, 2019, 13:36 |
David Wang | ITW | Standard Operation | TM4 | UCX27 | TM4 conenction in ITW checklist |
TM4 was connected in ITW this Tuesday. See attachment for checklist. |
Attachment 1: TM4_UCx27_connection_checklist.pdf
|
|
1984
|
Thursday, September 12, 2019, 09:26 |
David Wang | ITW | Repair | TM4 | | ITW bad vacuum issue and trouble shoot. |
ITW secondary vacuum was bad in last two days after TM4 was connected in ITW. Today when check the exit 2 module, I found a small needle valve on exit 2 module top was slightly opened for some reason in past months. The valve is closed . ITW vacuum is returned to normal status. |
1983
|
Tuesday, September 10, 2019, 14:04 |
David Wang | ITW | Standard Operation | | | ITW water interlock check. |
ITW water interlock check is finished. Everything is good. |
1982
|
Tuesday, September 10, 2019, 10:10 |
Adam Newsome | ITW | Standard Operation | TM4 | UC#27 | TM4 Move |
TM4 has been moved from the Conditioning Station to ITW with UC#27 target. |
1981
|
Tuesday, September 10, 2019, 08:25 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx27 | Argan vent TCS. |
TCS is argon vented. TM4 is disconnected at TCS. |
1980
|
Monday, September 09, 2019, 06:38 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx27 | HS and window line leak check. |
TM4 HS and window line are helium pressure checked at TCS. 70 psi helium 5 minutes. No response @1.2XE-8 atm.cc/sec. They are leak free. |
1979
|
Thursday, September 05, 2019, 14:26 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#27 | Electrical Check |
The results of the electrical check of TM#4 with UC#27 attached to it. |
Attachment 1: TM4_elec_chk_with_UC27_at_SHC_Sept_5_2019.pdf
|
|
1978
|
Thursday, September 05, 2019, 14:26 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#27 | Electrical Check |
The results of the electrical check of TM#4 with UC#27 attached to it. |
Attachment 1: TM4_elec_chk_with_UC27_at_SHC_Sept_5_2019.pdf
|
|
1977
|
Thursday, September 05, 2019, 14:18 |
Adam Newsome | South Hot-Cell | Standard Operation | TM4 | UCx#27 | TM4 Move |
TM4 with UCx#27 target has been moved from the South Hot-Cell to the Conditioning Station. |
1976
|
Thursday, September 05, 2019, 11:37 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UCx#27 | UCx#27 install |
Dummy Ta target has been removed from TM4 and UCx#27 installed |
1975
|
Wednesday, September 04, 2019, 13:53 |
chad fisher | South Hot-Cell | Repair | TM4 | | TM3 CB to TM4 |
The TM3 containment box has been installed onto TM4. No issues, leak checked ok.
|
1974
|
Tuesday, September 03, 2019, 10:49 |
Adam Newsome | South Hot-Cell | Standard Operation | TM4 | | TM4 Move |
TM4 has been moved from the Conditioning Station to the South Hot-Cell. |
1973
|
Tuesday, September 03, 2019, 10:48 |
Adam Newsome | South Hot-Cell | Standard Operation | TM3 | | TM3 Move |
TM3 has been moved from the South Hot-Cell to the Middle-East silo. |
1972
|
Thursday, August 29, 2019, 12:54 |
Adam Newsome | South Hot-Cell | Standard Operation | TM3 | | TM3 Move |
TM3 has been moved from the Middle-East silo to the South Hot Cell. |