|
ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
 |
|
1468
|
Tuesday, March 28, 2017, 10:30 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#19 | Electrical Check | Electrical check done on TM#4 with UC#19.
See attached PDF for results. |
|
|
1473
|
Tuesday, April 04, 2017, 09:29 |
Travis Cave | ITE | Standard Operation | TM4 | UC#19 | module moved | TM#4 with UC#19 has been moved from the
conditioning station to the east target station. |
|
|
1478
|
Wednesday, April 05, 2017, 09:46 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | no target | module moved | TM#1 has been moved from the North West
silo to the conditioning station. |
|
|
1484
|
Friday, April 07, 2017, 09:53 |
Travis Cave | Conditioning Station | Maintenance | TM1 | no target | Electrical Check and TM1 other checks | Results of an electrical check on TM#1
with no target attached to it.
I use this e-log entry for |
|
|
1485
|
Monday, April 10, 2017, 11:23 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | no target | Module move | TM#1 has been moved from the conditioning
station to the north west silo. There
was a slight delay in the move as the limits |
|
|
1486
|
Tuesday, April 11, 2017, 11:30 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#51 | Electrical Check | Electrical check performed on TM#2 with
Ta#51, see attached PDF. |
|
|
1487
|
Tuesday, April 11, 2017, 14:02 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | Ta#51 | module moved | TM#2 with Ta#51 has been moved from the
south hot cell to the conditioning station. |
|
|
1490
|
Wednesday, April 12, 2017, 09:20 |
Travis Cave | South Hot-Cell | Repair | TM3 | no target | Module move | TM#3 is now in the south hot cell. |
|
|
1492
|
Wednesday, April 12, 2017, 13:03 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | Electrical Check | Electrical check of TM#3 with no target
at the south hot cell |
|
|
1506
|
Wednesday, April 26, 2017, 10:40 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | Module move | TM#3 has been moved from the north
east silo to the south hot cell. |
|
|
1519
|
Tuesday, May 02, 2017, 13:49 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent Targets moved | Five spent targets have been moved from
the target storage vault to the mini vault
in preparation for Thursdays loading of the |
 |
|
1528
|
Monday, May 08, 2017, 14:46 |
Travis Cave | Spent Target Vault | Maintenance | | | Mini Vault Door | Mini Vault Door as some difficulty
over coming a small hump on its track. To
open the door one needs to give the door |
|
|
1535
|
Tuesday, May 16, 2017, 10:28 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#19 | module moved | TM#4 with UC#19 has been moved from ITE
to the south hot cell. |
|
|
1537
|
Tuesday, May 16, 2017, 14:18 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#20 | Electrical Check | TM#4 with UC#20 has had the electrical
check done on it at the south hot cell,
see attached for details |
|
|
1538
|
Tuesday, May 16, 2017, 14:19 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UC#20 | module moved | TM#4 with UC#20 has been moved from the
south hot cell to the conditioning station. |
|
|
1542
|
Thursday, May 18, 2017, 10:41 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#19 | Spent Target move | The spent UC#19 target has been moved from
the south hot cell into the spent target
storage. It was placed in pail #145 and put |
|
|
1543
|
Thursday, May 18, 2017, 11:36 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UC#20 | Electrical Check | Electrical check of TM#4 with UC#20 at
the conditioning station under vacuum. See
attached for details. |
|
|
1546
|
Tuesday, May 23, 2017, 10:41 |
Travis Cave | ITE | Standard Operation | TM4 | UC#20 | Module move | TM#4 with UC#20 has been moved from
the conditioning station to the east target
station. |
|
|
1556
|
Monday, June 12, 2017, 13:51 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent Target move | The spent Ta#51 target has been moved from
the south hot cell to the spent target vault.
It was placed in pail#149 and put in spot |
|
|
1557
|
Tuesday, June 13, 2017, 09:57 |
Travis Cave | ITW | Standard Operation | TM2 | SiC#36 | module moved | TM#2 with SiC#36 has been moved from the
conditioning station to the west target station. |
|