  1490   Wednesday, April 12, 2017, 09:20 Travis CaveSouth Hot-CellRepairTM3no targetModule move TM#3 is now in the south hot cell.   
  1492   Wednesday, April 12, 2017, 13:03 Travis CaveSouth Hot-CellStandard OperationTM3no targetElectrical CheckElectrical check of TM#3 with no target
at the south hot cell
 TM3_elec_chk_no_tgt.PDF 
  1506   Wednesday, April 26, 2017, 10:40 Travis CaveSouth Hot-CellStandard OperationTM3no targetModule move TM#3 has been moved from the north
east silo to the south hot cell.
  
  1519   Tuesday, May 02, 2017, 13:49 Travis CaveSpent Target VaultStandard Operation  Spent Targets movedFive spent targets have been moved from
the target storage vault to the mini vault
in preparation for Thursdays loading of the
 Mini_Vault_Storage_May_2_2017.pdfVault_Storage_May_2_2017.pdf 
  1528   Monday, May 08, 2017, 14:46 Travis CaveSpent Target VaultMaintenance  Mini Vault Door Mini Vault Door as some difficulty
over coming a small hump on its track. To
open the door one needs to give the door
  
  1535   Tuesday, May 16, 2017, 10:28 Travis CaveSouth Hot-CellStandard OperationTM4UC#19module movedTM#4 with UC#19 has been moved from ITE
to the south hot cell.
  
  1537   Tuesday, May 16, 2017, 14:18 Travis CaveSouth Hot-CellStandard OperationTM4UC#20Electrical CheckTM#4 with UC#20 has had the electrical
check done on it  at the south hot cell,
see attached for details
 TM4_UC20_Elec_chk_SHC.PDF 
  1538   Tuesday, May 16, 2017, 14:19 Travis CaveConditioning StationStandard OperationTM4UC#20module movedTM#4 with UC#20 has been moved from the
south hot cell to the conditioning station.
  
  1542   Thursday, May 18, 2017, 10:41 Travis CaveSpent Target VaultStandard Operation UC#19Spent Target moveThe spent UC#19 target has been moved from
the south hot cell into the spent target
storage. It was placed in pail #145 and put
 Vault_Storage_May_18_2017.pdf 
  1543   Thursday, May 18, 2017, 11:36 Travis CaveConditioning StationStandard OperationTM4UC#20Electrical CheckElectrical check of TM#4 with UC#20 at
the conditioning station under vacuum. See
attached for details.
 TM4_UC20_Elec_chk_CS_vac.PDF 
  1546   Tuesday, May 23, 2017, 10:41 Travis CaveITEStandard OperationTM4UC#20Module move TM#4 with UC#20 has been moved from
the conditioning station to the east target
station.
  
  1556   Monday, June 12, 2017, 13:51 Travis CaveSpent Target VaultStandard Operation  Spent Target moveThe spent Ta#51 target has been moved from
the south hot cell to the spent target vault.
It was placed in pail#149 and put in spot
 Vault_Storage_June_12_2017.pdf 
  1557   Tuesday, June 13, 2017, 09:57 Travis CaveITWStandard OperationTM2SiC#36module movedTM#2 with SiC#36 has been moved from the
conditioning station to the west target station.
  
  1565   Monday, June 26, 2017, 11:42 Travis CaveSouth Hot-CellStandard OperationTM4UC#20Module move TM#4 with UC#20 has been moved from
the east target station to the south hot
cell. Also the shield plug was remotely installed
  
  1567   Tuesday, June 27, 2017, 09:14 Travis CaveConditioning StationStandard OperationTM4Ta#52Module move TM#4 with Ta#52 has been moved from
south hot cell to the conditioning station.
  
  1570   Wednesday, June 28, 2017, 09:14 Travis CaveConditioning StationStandard OperationTM4Ta#52Electrical CheckResults of electrical check of TM#4 with
Ta#52 at the south hot cell and the conditioning
station under vacuum.
 TM4_Ta52_Elec_chk_SHC_CSvac.PDF 
  1575   Thursday, June 29, 2017, 14:42 Travis CaveSpent Target VaultStandard Operation UC#20Spent Target Move The spent UC#20 has been moved from
the south hot cell to the spent target vault.
It was placed in pail #150 and spot 1B in
 Vault_Storage_June_29_2017.pdf 
  1581   Tuesday, July 11, 2017, 10:20 Travis CaveITEStandard OperationTM4Ta#52Module move TM#4 with Ta#52 has been moved from
the conditioning station to the east target
station.
  
  1583   Thursday, July 13, 2017, 10:53 Travis CaveConditioning StationStandard OperationTM3no targetModule move TM#3 has been moved from the north
east silo to the conditioning station.
  
  1586   Tuesday, July 18, 2017, 15:04 Travis CaveCraneMaintenance  Failure of the ISAC TH Crane Rotate. Earlier in the day it was noted that
the rotate function of the crane had creased
operation. After David has finished the block
  