1490
|
Wednesday, April 12, 2017, 09:20 |
Travis Cave | South Hot-Cell | Repair | TM3 | no target | Module move | TM#3 is now in the south hot cell. |
|
1492
|
Wednesday, April 12, 2017, 13:03 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | Electrical Check | Electrical check of TM#3 with no target
at the south hot cell |
|
1506
|
Wednesday, April 26, 2017, 10:40 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | Module move | TM#3 has been moved from the north
east silo to the south hot cell. |
|
1519
|
Tuesday, May 02, 2017, 13:49 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent Targets moved | Five spent targets have been moved from
the target storage vault to the mini vault
in preparation for Thursdays loading of the |
|
1528
|
Monday, May 08, 2017, 14:46 |
Travis Cave | Spent Target Vault | Maintenance | | | Mini Vault Door | Mini Vault Door as some difficulty
over coming a small hump on its track. To
open the door one needs to give the door |
|
1535
|
Tuesday, May 16, 2017, 10:28 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#19 | module moved | TM#4 with UC#19 has been moved from ITE
to the south hot cell. |
|
1537
|
Tuesday, May 16, 2017, 14:18 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#20 | Electrical Check | TM#4 with UC#20 has had the electrical
check done on it at the south hot cell,
see attached for details |
|
1538
|
Tuesday, May 16, 2017, 14:19 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UC#20 | module moved | TM#4 with UC#20 has been moved from the
south hot cell to the conditioning station. |
|
1542
|
Thursday, May 18, 2017, 10:41 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#19 | Spent Target move | The spent UC#19 target has been moved from
the south hot cell into the spent target
storage. It was placed in pail #145 and put |
|
1543
|
Thursday, May 18, 2017, 11:36 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UC#20 | Electrical Check | Electrical check of TM#4 with UC#20 at
the conditioning station under vacuum. See
attached for details. |
|
1546
|
Tuesday, May 23, 2017, 10:41 |
Travis Cave | ITE | Standard Operation | TM4 | UC#20 | Module move | TM#4 with UC#20 has been moved from
the conditioning station to the east target
station. |
|
1556
|
Monday, June 12, 2017, 13:51 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent Target move | The spent Ta#51 target has been moved from
the south hot cell to the spent target vault.
It was placed in pail#149 and put in spot |
|
1557
|
Tuesday, June 13, 2017, 09:57 |
Travis Cave | ITW | Standard Operation | TM2 | SiC#36 | module moved | TM#2 with SiC#36 has been moved from the
conditioning station to the west target station. |
|
1565
|
Monday, June 26, 2017, 11:42 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#20 | Module move | TM#4 with UC#20 has been moved from
the east target station to the south hot
cell. Also the shield plug was remotely installed |
|
1567
|
Tuesday, June 27, 2017, 09:14 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | Ta#52 | Module move | TM#4 with Ta#52 has been moved from
south hot cell to the conditioning station. |
|
1570
|
Wednesday, June 28, 2017, 09:14 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | Ta#52 | Electrical Check | Results of electrical check of TM#4 with
Ta#52 at the south hot cell and the conditioning
station under vacuum. |
|
1575
|
Thursday, June 29, 2017, 14:42 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#20 | Spent Target Move | The spent UC#20 has been moved from
the south hot cell to the spent target vault.
It was placed in pail #150 and spot 1B in |
|
1581
|
Tuesday, July 11, 2017, 10:20 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#52 | Module move | TM#4 with Ta#52 has been moved from
the conditioning station to the east target
station. |
|
1583
|
Thursday, July 13, 2017, 10:53 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | Module move | TM#3 has been moved from the north
east silo to the conditioning station. |
|
1586
|
Tuesday, July 18, 2017, 15:04 |
Travis Cave | Crane | Maintenance | | | Failure of the ISAC TH Crane Rotate. | Earlier in the day it was noted that
the rotate function of the crane had creased
operation. After David has finished the block |
|