  RH-ISAC, Page 38 of 140  Not logged in ELOG logo
ID Date Authordown Category Type Module Target/Number Subject
  1468   Tuesday, March 28, 2017, 10:30 Travis CaveSouth Hot-CellStandard OperationTM4UC#19Electrical Check

Electrical check done on TM#4 with UC#19. See attached PDF for results.

Attachment 1: TM4__UC19_SHC.PDF
TM4__UC19_SHC.PDF
  1473   Tuesday, April 04, 2017, 09:29 Travis CaveITEStandard OperationTM4UC#19module moved

TM#4 with UC#19 has been moved from the conditioning station to the east target station.

  1478   Wednesday, April 05, 2017, 09:46 Travis CaveConditioning StationStandard OperationTM1no targetmodule moved

TM#1 has been moved from the North West silo to the conditioning station.

  1484   Friday, April 07, 2017, 09:53 Travis CaveConditioning StationMaintenanceTM1no targetElectrical Check and TM1 other checks

Results of an electrical check on TM#1 with no target attached to it.

 I use this e-log entry for TM1 notes as well  1. TM1 IG1 is a dual filament gauge . Its filament is very close to grid now. It shorted one time during the pumping down. It still works fine so far . But, we may need to change it if we use this module in TS again.

TCS 1G1 and 1G1S are pumped to 5Xe-6 torr. IG2 stayed at 2.5XE-5 torr. Since no target is installed on module , I capped top of HS water line. Maybe, the small o-ring seal in cap is too old, I found a big leak on this seal when i use LD check it. That is the reason IG2 stayed too high. Still, Leak check and helium presuure test are fulfilled on TM1. Leak detector BLR 5XE-7 atm.cc/sec, BP 0.0XE-4 torr9.  Back up pressure is 51 mtorr which is high because of leak on HS line cap seal so LD BLR is high. At this level, Ta+-, Tube +-, MSP,  EE are good.  Other air to vacuum seal are good as well at this leak rate.  I will check and change small o-ring seal in HS cap. The TM1 is functional basically.

Attachment 1: TM1_elec_chk_no_tgt.PDF
TM1_elec_chk_no_tgt.PDF
  1485   Monday, April 10, 2017, 11:23 Travis CaveConditioning StationStandard OperationTM1no targetModule move

 TM#1 has been moved from the conditioning station to the north west silo.  There was a slight delay in the move as the limits for the hoist drum got way out of whack and had to be adjusted.

  1486   Tuesday, April 11, 2017, 11:30 Travis CaveSouth Hot-CellStandard OperationTM2Ta#51Electrical Check

Electrical check performed on TM#2 with Ta#51, see attached PDF.

Attachment 1: TM2_Ta51_SHC_elec_chk.PDF
TM2_Ta51_SHC_elec_chk.PDF
  1487   Tuesday, April 11, 2017, 14:02 Travis CaveConditioning StationStandard OperationTM2Ta#51module moved

TM#2 with Ta#51 has been moved from the south hot cell to the conditioning station.

  1490   Wednesday, April 12, 2017, 09:20 Travis CaveSouth Hot-CellRepairTM3no targetModule move

 TM#3 is now in the south hot cell.

  1492   Wednesday, April 12, 2017, 13:03 Travis CaveSouth Hot-CellStandard OperationTM3no targetElectrical Check

Electrical check of TM#3 with no target at the south hot cell

Attachment 1: TM3_elec_chk_no_tgt.PDF
TM3_elec_chk_no_tgt.PDF
  1506   Wednesday, April 26, 2017, 10:40 Travis CaveSouth Hot-CellStandard OperationTM3no targetModule move

 TM#3 has been moved from the north east silo to the south hot cell.

  1519   Tuesday, May 02, 2017, 13:49 Travis CaveSpent Target VaultStandard Operation  Spent Targets moved

Five spent targets have been moved from the target storage vault to the mini vault in preparation for Thursdays loading of the F-308s. See attached for the list of targets in the mini vault, and the new status of the storage vault.

Attachment 1: Mini_Vault_Storage_May_2_2017.pdf
Mini_Vault_Storage_May_2_2017.pdf Mini_Vault_Storage_May_2_2017.pdf Mini_Vault_Storage_May_2_2017.pdf Mini_Vault_Storage_May_2_2017.pdf
Attachment 2: Vault_Storage_May_2_2017.pdf
Vault_Storage_May_2_2017.pdf Vault_Storage_May_2_2017.pdf Vault_Storage_May_2_2017.pdf Vault_Storage_May_2_2017.pdf
  1528   Monday, May 08, 2017, 14:46 Travis CaveSpent Target VaultMaintenance  Mini Vault Door

 Mini Vault Door as some difficulty over coming a small hump on its track. To open the door one needs to give the door  a slight tug while it is opening to over come this hump.

  1535   Tuesday, May 16, 2017, 10:28 Travis CaveSouth Hot-CellStandard OperationTM4UC#19module moved

TM#4 with UC#19 has been moved from ITE to the south hot cell.

  1537   Tuesday, May 16, 2017, 14:18 Travis CaveSouth Hot-CellStandard OperationTM4UC#20Electrical Check

TM#4 with UC#20 has had the electrical check done on it  at the south hot cell, see attached for details

Attachment 1: TM4_UC20_Elec_chk_SHC.PDF
TM4_UC20_Elec_chk_SHC.PDF TM4_UC20_Elec_chk_SHC.PDF
  1538   Tuesday, May 16, 2017, 14:19 Travis CaveConditioning StationStandard OperationTM4UC#20module moved

TM#4 with UC#20 has been moved from the south hot cell to the conditioning station.

  1542   Thursday, May 18, 2017, 10:41 Travis CaveSpent Target VaultStandard Operation UC#19Spent Target move

The spent UC#19 target has been moved from the south hot cell into the spent target storage. It was placed in pail #145 and put in tray one spot C. See attached PDF for all vault details.

Attachment 1: Vault_Storage_May_18_2017.pdf
Vault_Storage_May_18_2017.pdf Vault_Storage_May_18_2017.pdf Vault_Storage_May_18_2017.pdf Vault_Storage_May_18_2017.pdf
  1543   Thursday, May 18, 2017, 11:36 Travis CaveConditioning StationStandard OperationTM4UC#20Electrical Check

Electrical check of TM#4 with UC#20 at the conditioning station under vacuum. See attached for details.

Attachment 1: TM4_UC20_Elec_chk_CS_vac.PDF
TM4_UC20_Elec_chk_CS_vac.PDF TM4_UC20_Elec_chk_CS_vac.PDF
  1546   Tuesday, May 23, 2017, 10:41 Travis CaveITEStandard OperationTM4UC#20Module move

 TM#4 with UC#20 has been moved from the conditioning station to the east target station.

  1556   Monday, June 12, 2017, 13:51 Travis CaveSpent Target VaultStandard Operation  Spent Target move

The spent Ta#51 target has been moved from the south hot cell to the spent target vault. It was placed in pail#149 and put in spot 8B of the vault.

Attachment 1: Vault_Storage_June_12_2017.pdf
Vault_Storage_June_12_2017.pdf Vault_Storage_June_12_2017.pdf Vault_Storage_June_12_2017.pdf Vault_Storage_June_12_2017.pdf
  1557   Tuesday, June 13, 2017, 09:57 Travis CaveITWStandard OperationTM2SiC#36module moved

TM#2 with SiC#36 has been moved from the conditioning station to the west target station.