Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 35 of 141  Not logged in ELOG logo
ID Date Authordown Category Type Module Target/Number Subject
  1206   Tuesday, April 12, 2016, 09:08 Travis CaveITEStandard OperationTM4Ta#47module moved

TM#4 with Ta#47 has been moved from the conditioning station to the east target station.

  1208   Wednesday, April 13, 2016, 10:14 Travis CaveConditioning StationStandard OperationTM2no targetmodule moved

TM#2 has been moved from the south west silo to the conditioning station.

  1220   Monday, May 02, 2016, 11:33 Travis CaveConditioning StationStandard OperationTM2no targetmodule moved

TM#2 was moved to the SW Silo from the Conditioning Station. TM#3 was from from the NW Silo to the Conditioning Station.

  1224   Monday, May 09, 2016, 10:13 Travis CaveSouth Hot-CellStandard OperationTM2no targetmodule moved

TM#3 was moved from the conditioning station to the NE Silo. TM#2 was moved from the SW Silo to the South hot cell.

  1227   Tuesday, May 10, 2016, 14:27 Travis CaveSouth Hot-CellStandard OperationTM2Ta#48Electrical Check

Electrical check of TM#2 with Ta#48 attached. See the attached PDF for details.

Attachment 1: TM2_elec_chk_Ta48_SHC.PDF
TM2_elec_chk_Ta48_SHC.PDF
  1228   Wednesday, May 11, 2016, 09:44 Travis CaveConditioning StationStandard OperationTM2Ta#48module moved

TM#2 with Ta#48 has been moved from the south hot cell to the conditioning station.

  1236   Tuesday, May 17, 2016, 11:47 Travis CaveSouth Hot-CellStandard OperationTM1UC#15module moved

TM#1 has been moved from the west target to the south hot cell. The target on TM#1 is UC#15.

  1237   Tuesday, May 17, 2016, 14:15 Travis CaveITWStandard OperationTM1UC#15module moved

TM#1 with UC#15 was moved back to the west station due to alpha concerns.

  1238   Wednesday, May 18, 2016, 11:42 Travis CaveSouth Hot-CellStandard OperationTM1UC#15module moved

TM#1 with  UC#15 has been moved from the west target station to the south hot cell. The target shield plug was also remotely installed as well.

  1239   Thursday, May 19, 2016, 10:35 Travis CaveSouth Hot-CellStandard OperationTM1no targetmodule moved

TM#1 has been moved from the south hot cell to the north west silo.

  1244   Tuesday, May 24, 2016, 10:52 Travis CaveSpent Target VaultStandard Operation UC#15Spent Target move

Spent UC#15 has been moved from the south hot cell to the spent target storage. It was placed in pail number 136, and placed in spot C of tray one. It was 14.1mSv/hr upon removal from the south hot cell.

Attachment 1: Vault_Storage_May_24_2016.pdf
Vault_Storage_May_24_2016.pdf Vault_Storage_May_24_2016.pdf Vault_Storage_May_24_2016.pdf Vault_Storage_May_24_2016.pdf
  1245   Wednesday, May 25, 2016, 10:57 Travis CaveITWStandard OperationTM2Ta#48module moved

TM#2 with Ta#48 has been moved from conditioning station to the west target station.

  1247   Tuesday, May 31, 2016, 09:45 Travis CaveSouth Hot-CellStandard OperationTM3no targetmodule moved

TM#3 has been moved from the NE Silo to the south hot cell.

  1248   Thursday, June 02, 2016, 08:44 Travis CaveSouth Hot-CellStandard OperationTM3no targetElectrical Check

Electrical check of TM#3 no target at the south hot cell. see attached for results.

Attachment 1: TM3_elec_chk_no_tgt.PDF
TM3_elec_chk_no_tgt.PDF
  1251   Friday, June 03, 2016, 11:35 Travis CaveSouth Hot-CellStandard OperationTM3no targetmodule moved

TM#3 has been moved back to the north east silo.

  1264   Tuesday, June 14, 2016, 10:51 Travis CaveITEStandard OperationTM4UC#16module moved

TM#4 with UC#16 has been moved from the conditioning station to the east target station.

  1266   Wednesday, June 15, 2016, 09:39 Travis CaveSpent Target VaultStandard Operation Ta#47Spent Target move

The spent Ta#47 target has been moved from the south hot cell to the spent target vault. It was placed in pail #137 in spot 4C of the vault. It was 114mSv/hr upon removal from the vault.

Attachment 1: Vault_Storage_June_15_2016.pdf
Vault_Storage_June_15_2016.pdf Vault_Storage_June_15_2016.pdf Vault_Storage_June_15_2016.pdf Vault_Storage_June_15_2016.pdf
  1269   Tuesday, June 28, 2016, 14:42 Travis CaveSpent Target VaultStandard Operation ManySpent target assay.

The spent target assay were finally started or re-started today. Four targets were done today.

June 29 2016 another four targets were done today.

June 30 2016 all targets have assayed and measured. see the attached PDFs for the results.

Attachment 1: Vault_Storage_June_30_2016.pdf
Vault_Storage_June_30_2016.pdf Vault_Storage_June_30_2016.pdf Vault_Storage_June_30_2016.pdf Vault_Storage_June_30_2016.pdf
Attachment 2: Mini_Vault_Storage_June_30_2015.pdf
Mini_Vault_Storage_June_30_2015.pdf Mini_Vault_Storage_June_30_2015.pdf Mini_Vault_Storage_June_30_2015.pdf Mini_Vault_Storage_June_30_2015.pdf
  1274   Wednesday, July 06, 2016, 09:59 Travis CaveSouth Hot-CellStandard OperationTM2Ta#48 and SiC#33Electrical Check

Electrical check done on TM#2 with Ta#48, no target and SiC#33 the short on the coils to 60kV is still present it is on the R-U coil line. See attached PDFs for details.

Attachment 1: TM2_elechk_Ta48_SHC_postbeam.PDF
TM2_elechk_Ta48_SHC_postbeam.PDF
Attachment 2: TM2_elechk_SiC33_SHC.PDF
TM2_elechk_SiC33_SHC.PDF
Attachment 3: TM2_elechk_notgt_SHC.PDF
TM2_elechk_notgt_SHC.PDF
  1275   Wednesday, July 06, 2016, 13:38 Travis CaveConditioning StationStandard OperationTM2SiC#33module moved

TM#2 with SiC#33 has been moved from the south hot cell to the conditioning station.

ELOG V2.9.2-2455