1244
|
Tuesday, May 24, 2016, 10:52 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#15 | Spent Target move |
Spent UC#15 has been moved from the south hot cell to the spent target storage. It was placed in pail number 136, and placed in spot C of tray one. It was 14.1mSv/hr upon removal from the south hot cell. |
Attachment 1: Vault_Storage_May_24_2016.pdf
|
|
1245
|
Wednesday, May 25, 2016, 10:57 |
Travis Cave | ITW | Standard Operation | TM2 | Ta#48 | module moved |
TM#2 with Ta#48 has been moved from conditioning station to the west target station. |
1247
|
Tuesday, May 31, 2016, 09:45 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | module moved |
TM#3 has been moved from the NE Silo to the south hot cell. |
1248
|
Thursday, June 02, 2016, 08:44 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | Electrical Check |
Electrical check of TM#3 no target at the south hot cell. see attached for results. |
Attachment 1: TM3_elec_chk_no_tgt.PDF
|
|
1251
|
Friday, June 03, 2016, 11:35 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | module moved |
TM#3 has been moved back to the north east silo. |
1264
|
Tuesday, June 14, 2016, 10:51 |
Travis Cave | ITE | Standard Operation | TM4 | UC#16 | module moved |
TM#4 with UC#16 has been moved from the conditioning station to the east target station. |
1266
|
Wednesday, June 15, 2016, 09:39 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#47 | Spent Target move |
The spent Ta#47 target has been moved from the south hot cell to the spent target vault. It was placed in pail #137 in spot 4C of the vault. It was 114mSv/hr upon removal from the vault. |
Attachment 1: Vault_Storage_June_15_2016.pdf
|
|
1269
|
Tuesday, June 28, 2016, 14:42 |
Travis Cave | Spent Target Vault | Standard Operation | | Many | Spent target assay. |
The spent target assay were finally started or re-started today. Four targets were done today.
June 29 2016 another four targets were done today.
June 30 2016 all targets have assayed and measured. see the attached PDFs for the results. |
Attachment 1: Vault_Storage_June_30_2016.pdf
|
|
Attachment 2: Mini_Vault_Storage_June_30_2015.pdf
|
|
1274
|
Wednesday, July 06, 2016, 09:59 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#48 and SiC#33 | Electrical Check |
Electrical check done on TM#2 with Ta#48, no target and SiC#33 the short on the coils to 60kV is still present it is on the R-U coil line. See attached PDFs for details. |
Attachment 1: TM2_elechk_Ta48_SHC_postbeam.PDF
|
|
Attachment 2: TM2_elechk_SiC33_SHC.PDF
|
|
Attachment 3: TM2_elechk_notgt_SHC.PDF
|
|
1275
|
Wednesday, July 06, 2016, 13:38 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | SiC#33 | module moved |
TM#2 with SiC#33 has been moved from the south hot cell to the conditioning station. |
1280
|
Monday, July 11, 2016, 10:59 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#48 | Spent Target move |
The spent Ta#48 was moved from the south hot cell to the spent target vault. I was placed in pail 139 and is in spot 6C in the vault. It was 201mSv/hr when measured at the hot cell. See the attached PDF for the latest results. |
Attachment 1: Vault_Storage_July_11_2016.pdf
|
|
1281
|
Tuesday, July 12, 2016, 09:59 |
Travis Cave | ITW | Standard Operation | TM2 | SiC#33 | module moved |
TM#2 with SiC#33 has been moved from the conditioning station to the west target station. |
1284
|
Wednesday, July 13, 2016, 08:47 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | module moved |
TM#3 has been moved from the north east silo to the conditioning station. |
1287
|
Monday, July 18, 2016, 13:56 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | module moved |
TM#3 is now in the south hot cell. |
1293
|
Thursday, July 28, 2016, 11:27 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | no target | module moved |
TM#3 with no target has been moved from the conditioning station to the NE silo. |
1295
|
Tuesday, August 02, 2016, 11:02 |
Travis Cave | ITE | Standard Operation | TM4 | UC#16 | module moved |
TM#4 with UC#16 has been moved from the east station to the south hot cell. The shield plug was also install remotely once it was hooked up due to alphas. |
1297
|
Tuesday, August 02, 2016, 14:52 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#17 | module moved |
TM#4 with UC#17 is now in the conditioning station. |
1304
|
Wednesday, August 03, 2016, 10:02 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#17 | Electrical Check |
The result of yesterdays electrical check on TM#4 with UC#17. |
Attachment 1: TM4_elechk_UC17_SHC.PDF
|
|
1305
|
Thursday, August 04, 2016, 08:56 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#16 | Spent Target move |
The spent UC #16 have been moved from the south hot cell to the storage vault see attached PDF for details. |
Attachment 1: Vault_Storage_August_3_2016.pdf
|
|
1310
|
Tuesday, August 09, 2016, 10:05 |
Travis Cave | ITE | Standard Operation | TM4 | UC#17 | module moved |
TM#4 with UC#17 is now in the east target station. |