ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
1057
|
Tuesday, September 01, 2015, 10:32 |
Travis Cave | ITW | Standard Operation | TM2 | ZrC #7 | Module moved |
TM#2 with ZrC#7 has been moved from the conditioning station to the west target station. |
1064
|
Wednesday, September 09, 2015, 09:59 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | Module moved |
TM#1 has been moved from the south west silo to the south hot cell. |
1070
|
Thursday, September 17, 2015, 09:01 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | Module moved |
TM#1 has been moved from the south hot cell to the north east silo. |
1072
|
Tuesday, September 22, 2015, 11:12 |
Travis Cave | ITE | Standard Operation | TM4 | UC#13 | Module moved |
TM#4 with UC#13 has been moved from the east target station to the south hot cell. |
1073
|
Tuesday, September 22, 2015, 11:35 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#13 | Electrical Check |
TM#4 with UC#13 post beam electrical check. Also and electrical check was done without the target on. |
Attachment 1: TM4elecchkUC13postbeamSHC.PDF
|
|
Attachment 2: TM4_elecchk_totgt_with_IGLISline.PDF
|
|
1074
|
Tuesday, September 22, 2015, 11:39 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#46 | Electrical Check |
TM#4 electrical check with Ta#46 attached. |
Attachment 1: TM4Ta46elecchkSHC.PDF
|
|
1076
|
Wednesday, September 23, 2015, 08:38 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | Ta#46 | Module moved |
TM#4 with Ta#46 has been moved from the south hot cell to the conditioning station. |
1077
|
Wednesday, September 23, 2015, 13:56 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | Ta#46 | Electrical Check |
TM#4 electrical check at the conditioning station with Ta#46 target. |
Attachment 1: TM4Ta46elecchkCS.PDF
|
|
1083
|
Friday, September 25, 2015, 08:21 |
Travis Cave | South Hot-Cell | Standard Operation | | UC#13 | Spent Target move |
The spent UC#13 target has been moved from the south hot cell to the ISAC spent target vault. It was placed pail #128 and in tray spot 1A. It was 21.5mSv/hr upon removal from the hot cell. See attached PDF for details. |
Attachment 1: Vault_Storage_September_24_2015.pdf
|
|
1085
|
Tuesday, September 29, 2015, 09:38 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#46 | Module moved |
TM#4 with Ta#46 has been moved to ITE from the conditioning station. |
1087
|
Wednesday, September 30, 2015, 08:50 |
Travis Cave | South Hot-Cell | Maintenance | TM3 | no target | Module moved |
TM#3 is in the south hot cell it was moved from the north west silo. |
1088
|
Wednesday, September 30, 2015, 11:14 |
Travis Cave | South Hot-Cell | Repair | TM3 | no target | Electrical Check |
TM#3 electrical check at the south hot cell, no target, all value are done at 1000Volts. See the attached PDF for the results. |
Attachment 1: TM3_elecchk_notgt_shc.PDF
|
|
1089
|
Thursday, October 01, 2015, 09:18 |
Travis Cave | Spent Target Vault | Standard Operation | | | Targets transfered to mini storage. |
In preparation for shipping of the spent targets five have been moved to the mini storage. The following target were moved to the mini storage, SiC#26, Ta#36, UC#9,10,11. |
1107
|
Tuesday, October 20, 2015, 10:18 |
Travis Cave | ITW | Standard Operation | TM2 | SiC#32 | Module moved |
TM#2 with SiC#32 has been moved from the south hot cell to the west target station. |
1114
|
Friday, October 23, 2015, 11:40 |
Travis Cave | Spent Target Vault | Standard Operation | | ZrC #7 | Spent target moved |
The spent ZrC#7 target has been moved from the south hot cell to the spent target vault. The target was placed in pail #129 and then placed in slot 3B of the vault, it was 157mSv/hr upon removal from the south hot cell. |
Attachment 1: Vault_Storage_October_23_2015.pdf
|
|
1115
|
Thursday, October 29, 2015, 13:59 |
Travis Cave | Spent Target Vault | Standard Operation | | | Filling F-308s |
Five F-308s have been filled with the spent targets. The F-308s have been moved to the hall way between the north and south hot cell areas. |
1116
|
Thursday, November 05, 2015, 09:57 |
Travis Cave | Conditioning Station | Maintenance | TM3 | no target | Module moved |
TM#3 has been moved from the north west silo to the conditioning station. |
1128
|
Monday, November 16, 2015, 13:59 |
Travis Cave | Conditioning Station | Maintenance | TM3 | no target | Module moved |
TM#3 has been moved back to the NW silo. |
1133
|
Wednesday, November 25, 2015, 11:52 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#46 | Module moved |
Yesterday TM#4 with Ta#46 was moved from the east station to the south hot cell. |
1134
|
Wednesday, November 25, 2015, 11:55 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UC#14 | Module moved and electrical check. |
TM#4 with UC#14 was moved from the south hot cell to the conditioning station. Here are the results of the electrical check of the module with the UC#14 target while at the hot cell. |
Attachment 1: TM4_UC14_elecchk_SHC.PDF
|
|