ID Date Authordown Category Type Module Target/Number Subject Text Attachments
  1077   Wednesday, September 23, 2015, 13:56 Travis CaveConditioning StationStandard OperationTM4Ta#46Electrical CheckTM#4 electrical check at the conditioning
station with Ta#46 target.
 TM4Ta46elecchkCS.PDF 
  1083   Friday, September 25, 2015, 08:21 Travis CaveSouth Hot-CellStandard Operation UC#13Spent Target moveThe spent UC#13 target has been moved from
the south hot cell to the ISAC spent target
vault. It was placed pail #128 and in tray
 Vault_Storage_September_24_2015.pdf 
  1085   Tuesday, September 29, 2015, 09:38 Travis CaveITEStandard OperationTM4Ta#46Module movedTM#4 with Ta#46 has been moved to ITE from
the conditioning station.
  
  1087   Wednesday, September 30, 2015, 08:50 Travis CaveSouth Hot-CellMaintenanceTM3no targetModule movedTM#3 is in the south hot cell it was moved
from the north west silo.
  
  1088   Wednesday, September 30, 2015, 11:14 Travis CaveSouth Hot-CellRepairTM3no targetElectrical CheckTM#3 electrical check at the south hot
cell, no target, all value are done at 1000Volts.
See the attached PDF for the results.
 TM3_elecchk_notgt_shc.PDF 
  1089   Thursday, October 01, 2015, 09:18 Travis CaveSpent Target VaultStandard Operation  Targets transfered to mini storage.In preparation for shipping of the spent
targets five have been moved to the mini
storage. The following target were moved
  
  1107   Tuesday, October 20, 2015, 10:18 Travis CaveITWStandard OperationTM2SiC#32Module movedTM#2 with SiC#32 has been moved from the
south hot cell to the west target station.
  
  1114   Friday, October 23, 2015, 11:40 Travis CaveSpent Target VaultStandard Operation ZrC #7Spent target movedThe spent ZrC#7 target has been moved from
the south hot cell to the spent target vault.
The target was placed in pail #129 and then
 Vault_Storage_October_23_2015.pdf 
  1115   Thursday, October 29, 2015, 13:59 Travis CaveSpent Target VaultStandard Operation  Filling F-308sFive F-308s have been filled with the spent
targets. The F-308s have been moved to the
hall way between the north and south hot
  
  1116   Thursday, November 05, 2015, 09:57 Travis CaveConditioning StationMaintenanceTM3no targetModule movedTM#3 has been moved from the north west
silo to the conditioning station.
  
  1128   Monday, November 16, 2015, 13:59 Travis CaveConditioning StationMaintenanceTM3no targetModule movedTM#3 has been moved back to the NW silo.   
  1133   Wednesday, November 25, 2015, 11:52 Travis CaveSouth Hot-CellStandard OperationTM4Ta#46Module movedYesterday TM#4 with Ta#46 was moved from
the east station to the south hot cell.
  
  1134   Wednesday, November 25, 2015, 11:55 Travis CaveConditioning StationStandard OperationTM4UC#14Module moved and electrical check.TM#4 with UC#14 was moved from the south
hot cell to the conditioning station. 
Here are the results of the electrical check
 TM4_UC14_elecchk_SHC.PDF 
  1141   Thursday, November 26, 2015, 08:52 Travis CaveSpent Target VaultStandard Operation Ta#46Spent Target moveTa#46 was placed in the ISAC spent target
vault yesterday. See attached PDF for details.
 Vault_Storage_November_26_2015.pdf 
  1144   Tuesday, December 01, 2015, 11:26 Travis CaveITE/ITW CoolingStandard OperationTM4UC#14Module movedTM#4 with UC#14 has been moved from the
conditioning station to the east target station.
  
  1152   Wednesday, January 13, 2016, 09:57 Travis CaveSpent Target VaultStandard Operation Ta#35, Ta#39, SiC#27, UC#12, ThO#1Spent targets moved to mini storage.Five spent targets have been moved from
the Spent Target Vault to Mini Storage in
preparation for transfer to F-308s in February.
  
  1166   Wednesday, March 16, 2016, 09:20 Travis CaveITEStandard OperationTM2SiC#32module movedTM#2 with SiC#32 has been moved from the
west station to the south hot cell.
  
  1169   Friday, March 18, 2016, 08:34 Travis CaveConditioning StationStandard OperationTM2no targetmodule movedTM#2 with no target has been moved to the
conditioning station from the south hot cell.
  
  1173   Friday, March 18, 2016, 13:13 Travis CaveConditioning StationStandard OperationTM2SiC#32Electrical CheckElectrical checks of the TM#2 with the
old SiC#32 and without the target. See attached
PDFs.
 TM2_SiC32_postbeam.PDFTM2_elec_chk_notgt_CS.PDF 
  1177   Tuesday, March 22, 2016, 10:27 Travis CaveSpent Target VaultStandard Operation SiC#32Spent Target moveSiC#32 has been moved from the south hot
cell to the spent target storage. See attached
PDF for details.
 Vault_Storage_March_22_2016.pdf 