Entry  Monday, January 10, 2022, 09:31, David Wang, ITE, Standard Operation, TM4, , ITE primary and secondary vacuum vessel leak check.  
ITE primary and secondary  vacuum vessel leak check has been down.  Base leak rate 0.0x E-9 atm.cc/sec on LD. Only 2.8 XE-9 atm.cc/sec leak
has been found on big T tank seal which is very tiny. all other seals are perfect leak free.   No concern 
Entry  Tuesday, January 18, 2022, 11:02, Frank Song, North Hot-Cell, Standard Operation, TM4, Ta #63, TM4 SIS with Target and No external Connections tm4_with_Ta#63_on_NHC.jpg
 David made an electric check after TM4 been moved to NHC from ITE. The target is still on the module. Please find out attached pic for detail.
Entry  Wednesday, January 19, 2022, 09:00, Frank Song, North Hot-Cell, Standard Operation, TM4, Ta #63, Electrical check on TM4 at NHC without target 20220119_080049.jpg
 David did electrical check after target removed from TM4 at NHC. see attachment pls.
Entry  Thursday, January 20, 2022, 08:18, David Wang, North Hot-Cell, Standard Operation, TM4, No target, TM4 was removed from NHC to S_W silo yesterday.  
TM4 was removed from NHC to S_W silo yesterday.  The remove is smooth and successful. 
Entry  Wednesday, May 18, 2022, 13:52, Frank Song, South Hot-Cell, Standard Operation, TM4, UCx#37, electrical check  1.jpg2.jpg3.jpg
 The TM4 with installed target #UCx37 had been electric checked at SHC. PICs attached.
Entry  Thursday, May 19, 2022, 15:05, Frank Song, ITE, Standard Operation, TM4, UCx#37, UCx#37 P2N connection on TM4 01_UCx37_P2N_connection_on_TM4.jpg02_UCx37_P2N_connection_on_TM4.jpg03_UCx37_P2N_connection_on_TM4.jpg
 TM4 with UCx#37 was connected in ITE. Attachment available.
Entry  Wednesday, May 25, 2022, 13:23, David Wang, ITE, Standard Operation, TM4, , Annual ITE water signal interlocks. 
Annual ITE water signal interlocks check is done with Rob Shank. All ITE water signal  interlocks work fine. 
Entry  Tuesday, June 21, 2022, 17:49, Frank Song, ITE, Standard Operation, TM4, UCx#37, TM4 disconnection TM4_with_UCx#37_disconnection_in_ITE.jpg
 the module with target UCx37 was disconnected in ITE.
Entry  Tuesday, June 21, 2022, 18:43, Frank Song, North Hot-Cell, Standard Operation, TM4, UCx#37, electrical check p2n_ucx37_electrical_check.jpg
 A p2n target in TM4 was electrical measured on NHC. see attachment pls.
Entry  Wednesday, June 22, 2022, 09:03, David Wang, ITE, Standard Operation, TM4, UCX37# P2N, Remotely removed TM2 from ITE to NHC 
TM2 with UCx#37 P2N target  was removed from ITE to NHC yesterday morning. The move is good. 
Entry  Thursday, June 23, 2022, 07:11, Frank Song, North Hot-Cell, Standard Operation, TM4, Ta#64, electrical check Ta#64.jpg
 New Target Ta#64 was installed on TM4. Electrical measurement result is good. c/w attachment.
Entry  Thursday, June 23, 2022, 13:04, David Wang, Conditioning Station, Standard Operation, TM4, Ta#64, helium pressure test on TM4 HS line.  
With Ta#64 installed , TM4 HS line was helium pressure tested at TCS. base leak rate is 0.0XE-9 atm.cc/sec. HS line tested leak rate is 3x E-7 atm.cc/sec
on 5 minutes 50 psi helium testing. Leak check result wasgood at NHC by helium spray method. We decided to apply water to HS and all other water lines
still. The vacuum status is closely being watched. So far, TCS pumping down trend is still good. HS line supply water valve was switched on and off couple
Entry  Tuesday, June 28, 2022, 14:13, Frank Song, ITE, Standard Operation, TM4, Ta#64, Module Connection tm4_with_Ta#64_connection_in_ITE.jpg
 TM4 with Ta#64 was connected in ITE. see attachment please.
Entry  Tuesday, August 09, 2022, 12:19, Frank Song, ITE, Standard Operation, TM4, Ta#64, TM4 with Ta#64 disconnection in ITE TM4_with_Ta#64_disconnection_in_ITE.jpeg
 TM4 with Ta#64 has been disconnected in ITE.
Entry  Tuesday, August 09, 2022, 12:23, Frank Song, North Hot-Cell, Standard Operation, TM4, Ta #64, Electrical Check for TM4 with Ta#64 after beam at NHC tm4_with_Ta#64_after_beam_at_NHC.jpg.jpeg
 An electrical check made at NHC right after TM4 moving from ITE.
Entry  Wednesday, August 10, 2022, 08:10, Frank Song, North Hot-Cell, Standard Operation, TM4, Sic#44, electrical and leak check  TM4_with_Sic#44_eletrical_and_leak_check.jpg
 TM4 with Sic#44 installed and had an electrical / leak check at NHC. 
Entry  Thursday, August 11, 2022, 09:10, David Wang, Conditioning Station, Standard Operation, TM4, SiC #44, HS line helium pressure test. Gas line fitting on module top and gas line leak check.  
HS line helium pressure test is done at TCS. No leak. I also leak checked gasline adapter and fittings on TM4 top. No leak.  1/4 copper gas line
between module and ITE was leak checked yesterday. It is good. 
Entry  Thursday, August 18, 2022, 10:41, Frank Song, ITE/ITW, Standard Operation, TM4, SiC#44, TM4 with SiC#44 connection in ITE TM4_with_SiC#44_connection_in_ITE.jpg
 TM4 with target SiC#44 was connected in ITE on Tuesday.
Entry  Tuesday, August 23, 2022, 10:51, Carla Babcock, ITE, Repair, TM4, SiC#44, TBHT to HV common short on SiC#44-TM4 
TM4 with SiC#44 installed developed a short TBHT to HV common during its first heating in ITE. Was fine before installation. Now with everything cold
TBHT to HVC is 25kOhms. Removed short in electrical room, will rely on short in the module.
Entry  Monday, October 03, 2022, 09:42, Frank Song, ITE, Standard Operation, TM4, Sic#44, module disconnection TM4_with_SiC#44_disconnected_in_ITE.png
 TM4 with SiC@44 was disconnected in ITE.