  RH-ISAC, Page 31 of 138  Not logged in ELOG logo
ID Date Author Category Type Moduledown Target/Number Subject
  2286   Monday, January 10, 2022, 09:31 David WangITEStandard OperationTM4 ITE primary and secondary vacuum vessel leak check.

ITE primary and secondary  vacuum vessel leak check has been down.  Base leak rate 0.0x E-9 atm.cc/sec on LD. Only 2.8 XE-9 atm.cc/sec leak has been found on big T tank seal which is very tiny. all other seals are perfect leak free.   No concern

  2292   Tuesday, January 18, 2022, 11:02 Frank SongNorth Hot-CellStandard OperationTM4Ta #63TM4 SIS with Target and No external Connections

 David made an electric check after TM4 been moved to NHC from ITE. The target is still on the module. Please find out attached pic for detail.

  2293   Wednesday, January 19, 2022, 09:00 Frank SongNorth Hot-CellStandard OperationTM4Ta #63Electrical check on TM4 at NHC without target

 David did electrical check after target removed from TM4 at NHC. see attachment pls.

  2296   Thursday, January 20, 2022, 08:18 David WangNorth Hot-CellStandard OperationTM4No targetTM4 was removed from NHC to S_W silo yesterday.

TM4 was removed from NHC to S_W silo yesterday.  The remove is smooth and successful.

  2321   Wednesday, May 18, 2022, 13:52 Frank SongSouth Hot-CellStandard OperationTM4UCx#37electrical check

 The TM4 with installed target #UCx37 had been electric checked at SHC. PICs attached.

  2323   Thursday, May 19, 2022, 15:05 Frank SongITEStandard OperationTM4UCx#37UCx#37 P2N connection on TM4

 TM4 with UCx#37 was connected in ITE. Attachment available.

  2325   Wednesday, May 25, 2022, 13:23 David WangITEStandard OperationTM4 Annual ITE water signal interlocks.

Annual ITE water signal interlocks check is done with Rob Shank. All ITE water signal  interlocks work fine.

  2333   Tuesday, June 21, 2022, 17:49 Frank SongITEStandard OperationTM4UCx#37TM4 disconnection

 the module with target UCx37 was disconnected in ITE.

  2335   Tuesday, June 21, 2022, 18:43 Frank SongNorth Hot-CellStandard OperationTM4UCx#37electrical check

 A p2n target in TM4 was electrical measured on NHC. see attachment pls.

  2336   Wednesday, June 22, 2022, 09:03 David WangITEStandard OperationTM4UCX37# P2NRemotely removed TM2 from ITE to NHC

TM2 with UCx#37 P2N target  was removed from ITE to NHC yesterday morning. The move is good.

  2338   Thursday, June 23, 2022, 07:11 Frank SongNorth Hot-CellStandard OperationTM4Ta#64electrical check

 New Target Ta#64 was installed on TM4. Electrical measurement result is good. c/w attachment.

  2340   Thursday, June 23, 2022, 13:04 David WangConditioning StationStandard OperationTM4Ta#64helium pressure test on TM4 HS line.

With Ta#64 installed , TM4 HS line was helium pressure tested at TCS. base leak rate is 0.0XE-9 atm.cc/sec. HS line tested leak rate is 3x E-7 atm.cc/sec on 5 minutes 50 psi helium testing. Leak check result wasgood at NHC by helium spray method. We decided to apply water to HS and all other water lines still. The vacuum status is closely being watched. So far, TCS pumping down trend is still good. HS line supply water valve was switched on and off couple of times at TCS IG1 1.15 XE-6 range, and no vacuum spike was observed. More information will be logged in during the TM4 and target conditioning stage at TCS. 

  2341   Tuesday, June 28, 2022, 14:13 Frank SongITEStandard OperationTM4Ta#64Module Connection

 TM4 with Ta#64 was connected in ITE. see attachment please.

  2353   Tuesday, August 09, 2022, 12:19 Frank SongITEStandard OperationTM4Ta#64TM4 with Ta#64 disconnection in ITE

 TM4 with Ta#64 has been disconnected in ITE.

  2354   Tuesday, August 09, 2022, 12:23 Frank SongNorth Hot-CellStandard OperationTM4Ta #64Electrical Check for TM4 with Ta#64 after beam at NHC

 An electrical check made at NHC right after TM4 moving from ITE.

  2355   Wednesday, August 10, 2022, 08:10 Frank SongNorth Hot-CellStandard OperationTM4Sic#44electrical and leak check

 TM4 with Sic#44 installed and had an electrical / leak check at NHC. 

  2356   Thursday, August 11, 2022, 09:10 David WangConditioning StationStandard OperationTM4SiC #44HS line helium pressure test. Gas line fitting on module top and gas line leak check.

HS line helium pressure test is done at TCS. No leak. I also leak checked gasline adapter and fittings on TM4 top. No leak.  1/4 copper gas line between module and ITE was leak checked yesterday. It is good.

  2358   Thursday, August 18, 2022, 10:41 Frank SongITE/ITWStandard OperationTM4SiC#44TM4 with SiC#44 connection in ITE

 TM4 with target SiC#44 was connected in ITE on Tuesday.

  2359   Tuesday, August 23, 2022, 10:51 Carla BabcockITERepairTM4SiC#44TBHT to HV common short on SiC#44-TM4

TM4 with SiC#44 installed developed a short TBHT to HV common during its first heating in ITE. Was fine before installation. Now with everything cold TBHT to HVC is 25kOhms. Removed short in electrical room, will rely on short in the module.

  2370   Monday, October 03, 2022, 09:42 Frank SongITEStandard OperationTM4Sic#44module disconnection

 TM4 with SiC@44 was disconnected in ITE.