Entry  Tuesday, January 08, 2013, 14:18, Travis Cave, South Hot-Cell, Standard Operation, TM1, no target, Electrical check TM#1_no_tgt_Jan_8_2013.PDF
TM#1 was electrically check with out a target see attached PDF for results.
Entry  Monday, January 14, 2013, 14:09, Travis Cave, ITW, Standard Operation, TM1, no target, module move 
TM#1 has been moved from the south hot hell to the west target station, move went well.
Entry  Tuesday, January 15, 2013, 10:49, David Wang, ITW, Standard Operation, TM1, no target, TM1 vacuum system connection in ITW 
I connected TM 1 vacuum system in ITW. The TM1 and ITW will be pumped out for shut down routine leak check.
Entry  Wednesday, April 03, 2013, 10:59, Travis Cave, South Hot-Cell, Standard Operation, TM1, no target, module move 
TM#1 has been moved from the south west silo to the south hot cell, move went well.
Entry  Tuesday, April 16, 2013, 11:10, Travis Cave, South Hot-Cell, Standard Operation, TM3, no target, module move 
TM#3 has been moved from the NE Silo to the south hot cell, move went well.
Entry  Wednesday, April 17, 2013, 09:26, Travis Cave, South Hot-Cell, Standard Operation, TM3, no target, Electrical check TM3_DLB_9_PIN_CONN_ID_and_CHK.PDFTM3_Elec_CHK_no_target.PDF
Electrical check was performed on TM#3 with no target nothing was wrong was found, but our megger does not go above 1000 volts so any problems above
this value would not be seen, see attached pdf for details.
Also the 55 pin(top) double 9 pin (bottom) connector was tested as well. When it was meggered to 60kV common more then 50% of the lines failed,
Entry  Wednesday, April 17, 2013, 10:59, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, module move 
TM#3 with no target has been moved from the south hot cell to the conditioning station. Move went well. The fields around the module was 1.6mSv/hr.
Entry  Wednesday, April 24, 2013, 10:14, Travis Cave, South Hot-Cell, Standard Operation, TM3, no target, module move 
TM#3 has been moved from the conditioning station to the south hot cell, move went well.
Entry  Friday, May 10, 2013, 11:02, Travis Cave, South Hot-Cell, Standard Operation, TM3, no target, module move 
TM#3 with no target and no source tray has been moved from the south hot cell to the conditioning station.
Entry  Friday, May 10, 2013, 11:11, Travis Cave, South Hot-Cell, Standard Operation, TM3, no target, Electrical check TM#3_elec_chk_no_tgt_no_tray.PDF
TM#3 electrical check with no target and no source tray, see pdf.
Entry  Wednesday, July 03, 2013, 10:43, Travis Cave, South Hot-Cell, Standard Operation, TM3, no target, module move 
TM#3 with no target and no source tray was moved from the north east silo to the south hot cell the move went well.
Entry  Thursday, July 18, 2013, 10:08, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, module move 
TM#3 with no target and no source tray has been moved from the conditioning station to the north east silo, move went well.
Entry  Tuesday, August 27, 2013, 17:18, Grant Minor, Conditioning Station, Repair, TM3, no target, TM3 Rev 3 source tray - prelminary leak check results at CS TM3_leak_check_at_CS_27Aug2013.JPGsketch_TM3_water_feedthru_27Aug2013-1.pdf
David Wang started a helium leak check on TM3 at the CS this morning.
David will create an e-log once his check is complete, but here are the preliminary results:
- target oven +/- OK
Entry  Wednesday, August 28, 2013, 14:25, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, module move 
TM#3 with no target has been moved from the conditioning station to the south hot cell. The fields observed around the containment box of the module
ranged from 0.80 mSv/hr to 1.8mSv/hr..
    Reply  Thursday, August 29, 2013, 12:03, Grant Minor, South Hot-Cell, Repair, TM3, no target, Heat Shield Circuit Leak TM3_Rev_3_Heat_Shield_Water_Lines_leak_check_29Aug2013_1.jpgTM3_Rev_3_Heat_Shield_Water_Lines_leak_check_29Aug2013_2.jpgTM3_heatshield_snoop_test2_29Aug2013.pdf


    
        
            Bevan Moss wrote:
        
        
            
            
            
              
Entry  Wednesday, September 11, 2013, 11:31, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, module move 
TM#3 with no target has been moved to the conditioning station from the south hot cell.
Entry  Thursday, September 19, 2013, 09:08, Travis Cave, South Hot-Cell, Standard Operation, TM3, no target, wiring harness 
The wiring harness for TM#3 was made and a continuity and megger test was done on it and it passed, it has since been installed into the hot cell and
placed on the module.
Entry  Thursday, September 19, 2013, 11:09, Travis Cave, South Hot-Cell, Maintenance, TM3, no target, Electrical check 
Electrical check of TM#3 with no target was performed and it failed. There is a 135M Ohm short
between the coils and a 165M Ohm short between the coil and 60kV common.  All other circuits passed they were infinite in value.
Entry  Tuesday, September 24, 2013, 08:15, Travis Cave, South Hot-Cell, Standard Operation, TM3, no target, Electrical check TM#3_elec_chk_no_target.PDF
Electrical check was done on TM#3 yesterday and again the coil lines to the 60kV common and the coil line to each other failed, as in they had a resistance.
Everything else passed as showing an infinite value, all meggering was done at 1000V unless noted other wise. See attached PDF for details.
Entry  Wednesday, October 02, 2013, 14:47, Travis Cave, South Hot-Cell, Standard Operation, TM4, no target, Electrical check TM#4_elec_chk_No_Tgt_SHC.PDF
Electrical check done on TM#4 with no target, see PDF.