Tuesday, November 29, 2016, 14:50, Travis Cave, ITW, Standard Operation, TM2, UC#18, module moved
|
TM#2 with UC#18 has been moved to ITW from the conditioning station. |
Tuesday, August 02, 2016, 14:52, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#17, module moved
|
TM#4 with UC#17 is now in the conditioning station. |
Tuesday, August 02, 2016, 15:22, David Wang, Conditioning Station, Standard Operation, TM4, UC#17, TM4 with new target has been connected at TCS
|
It is being pumped now at TCS. |
Wednesday, August 03, 2016, 08:08, Anders Mjos, Conditioning Station, Standard Operation, TM4, UC#17, Conditioning UC#17
|
Wednesday, August 03, 2016, 08:08: RGA on
Wednesday, August 03, 2016, 11:25: Configured EE to be connected to EE PS (not grounded)
Wednesday, August 03, 2016, 11:25: PS on
Wednesday, August 03, 2016, 11:32: BIAS / EL / EE to 20 / 10 / 1 kV
Ramping set to 40 / 20 A at 1 / 0.5 A/min. Good / bad vacuum at 2.0 / 2.2 E-6 T (IG2). Vacuum too high.
Wednesday, August 03, 2016, 13:02: BIAS / EL / EE to 30 / 15 / 1.5 kV
Wednesday, August 03, 2016, 15:59: BIAS / EL / EE to 35 / 17.5 / 1.5 kV. Some conditioning from 30 kV
Chiller staging stopped working around midnight. TGHT and TBHT ramped down by ISAC operators.
Thursday, August 04, 2016, 08:14: Ramping target to 50 / 25 A
Thursday, August 04, 2016, 08:22: Cycled power on chiller to reset alarm. Repeated again 5 min later
Thursday, August 04, 2016, 08:37: BIAS / EL / EE to 30 / 15 / 1.5 kV
Thursday, August 04, 2016, 09:36: Continue ramping to 100 / 50 A
Thursday, August 04, 2016, 11:32: Continue ramping to 120 / 60 A
Thursday, August 04, 2016, 14:50: ramping down
Friday, August 05, 2016, 07:09: Started cooling system
Friday, August 05, 2016, 07:56: Started ramping to 100 / 50 A
Friday, August 05, 2016, 14:27: TGHT / TBHT at 253 / 126 A.
Friday, August 05, 2016, 14:30: Ramping down at 2 / 1 A/min
Friday, August 05, 2016, 15:27: BIAS / EL / EE off
Monday, August 08, 2016, 08:15: Continue ramping. : BIAS / EL / EE to 30 / 15 / 1.5 kV
Monday, August 08, 2016, 14:36 TGHT / TBHT at 260 / 130 A. Ramping down at 2 / 1 A/min
Monday, August 08, 2016, 15:30: BIAS / EL off. EE remains at 1 kV.
Monday, August 08, 2016, 22:56: RGA off. Water system fault. Running CP1 manually
Monday, August 08, 2016, 22:57: EE off.
Monday, August 08, 2016, 22:58: Vacuum off |
Wednesday, August 03, 2016, 09:45, David Wang, Conditioning Station, Standard Operation, TM4, UC#17, Helium pressure test on TM4 HS line at TCS
|
Helium pressure test on TM4 HS line at TCS is done.Leak detector 0.0X E-9atm.cc/sec. 5minutes, 70psi helium. No response on LD. |
Wednesday, August 03, 2016, 10:02, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#17, Electrical Check
|
The result of yesterdays electrical check on TM#4 with UC#17. |
Tuesday, August 09, 2016, 10:05, Travis Cave, ITE, Standard Operation, TM4, UC#17, module moved
|
TM#4 with UC#17 is now in the east target station. |
Wednesday, August 10, 2016, 11:30, David Wang, ITE, Standard Operation, TM4, UC#17, TM4 has been connected at ITE
|
Dan and I connected TM4 in ITE yesterday. It is pumping down at ITE now. Everything is fine so far. |
Monday, August 15, 2016, 10:08, David Wang, ITE, Standard Operation, TM4, UC#17, 5 Shielding blocks have been transferred from ITW to ITE.
|
Dan and I transferred 5 shielding blocks from ITW to ITE. The ITE is configured to take proton beam. |
Tuesday, September 20, 2016, 10:32, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#17, module moved
|
TM#4 has been moved from the east target station to the south hot cell |
Monday, September 26, 2016, 13:59, Travis Cave, Spent Target Vault, Standard Operation, , UC#17, Spent Target move
|
The spent UC#17 has been moved from the south hot cell to the spent target vault. See the attached pdf for details. |
Tuesday, June 07, 2016, 17:11, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 UCx16 electrical check and leak check at SHC
|
Chad and I finished the TM4 UCx6 electrical check and leak check at SHC. Leak check result on HS line is good. There is a dead short between "Z" repellor and HS during the first time electrical check. The dead short disappeared after re- installation of UCx 14 target onto TM4. See attachment
Anders and I did another electrical check on TM4 at TCS under vacuum. See attachment 2 |
Tuesday, June 07, 2016, 17:14, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 with UCx16 target has been moved from SHC to TCS.
|
Bill and Yasmine did the move remotely this afternoon. The move is successful. |
Tuesday, June 07, 2016, 18:17, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 and TCS turbo pumps are started.
|
TM4 and TCS vacuum system are connected. Turbo pumps are started. Everything is fine so far. |
Wednesday, June 08, 2016, 08:25, Anders Mjos, Conditioning Station, Standard Operation, TM4, UC#16, Conditioning UC#16
|
Wednesday, June 08, 2016, 08:15: RGA on
Thursday, June 09, 2016, 09:00: Water on by David. TK2 level dropped by about 1.5 in.
Thursday, June 09, 2016, 10:30: BIAS / EL / EE to 10 / 5 / 0.5 kV
Thursday, June 09, 2016, 10:44: Started heater ramp. TGHT / TBHT to 40 / 20 A at 1 / 0.5 A/min. IG2 vacuum limits 2E-6 / 3E-6 T
Thursday, June 09, 2016, 11:59: Continue ramping to 100 / 50 A.
Friday, June 10, 2016, 08:04: Continue ramping to 300 / 150 A IG2 vacuum limits 1.9E-6 / 2.3E-6 T
Friday, June 10, 2016, 21:32: Stopped ramping at 275 A / 138.5 A
Saturday, June 11, 2016, 11:40: Ramped to 281 A / 140 A
Sunday, June 12, 2016, 08:31: Ramped to 290 A / 145 A
Sunday, June 12, 2016, 08:49: Ramped to 300 A / 150 A
Monday, June 13, 2016, 08:06: Continue ramping to 400 / 200 A
Monday, June 13, 2016, 17:00: TGHT / TBHT at 390 A / 195 A.
Monday, June 13, 2016, 17:17: BIAS / EL / EE to 30 / 15 / 1.5 kV
Monday, June 13, 2016, 18:02: Ramping down TGHT / TBHT at 2 / 1 A/min
Monday, June 13, 2016, 21:39: Source off. Water, RGA, vacuum off. |
Thursday, June 09, 2016, 08:37, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 with UCx16 helium pressure test at TCS
|
I did a helium pressure test on TM4 at TCS with UCX16 target installed on the module. No leak has been found on all using water lines in TM4. See attachment for detail. |
Thursday, June 09, 2016, 09:44, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 has been connected at TCS
|
It is ready for HV conditioning/ heating. |
Tuesday, June 14, 2016, 08:04, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 has been disconnected at TCS
|
The TM4 and TCS are vented with argon. |
Tuesday, June 14, 2016, 10:51, Travis Cave, ITE, Standard Operation, TM4, UC#16, module moved
|
TM#4 with UC#16 has been moved from the conditioning station to the east target station. |
Tuesday, August 02, 2016, 11:02, Travis Cave, ITE, Standard Operation, TM4, UC#16, module moved
|
TM#4 with UC#16 has been moved from the east station to the south hot cell. The shield plug was also install remotely once it was hooked up due to alphas. |
|