ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
703
|
Wednesday, July 16, 2014, 13:02 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#9 | Electrical check | Electrical check of the TM#1 with UC#9
post beam at the south hot cell. |
|
706
|
Wednesday, July 16, 2014, 14:28 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Ta#43 | Electrical check | TM#1 with Ta#43 electrical check see attached
PDF. |
|
707
|
Thursday, July 17, 2014, 09:29 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Ta#43 | module move | TM#1 with Ta#43 has been moved from the
south hot cell to conditioning station. |
|
713
|
Thursday, July 24, 2014, 09:10 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | module move | TM#2 has been moved to the hot cell from
the north east silo. |
|
715
|
Monday, July 28, 2014, 09:29 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | no target | module move | TM#2 has been moved from the south hot
cell to the conditioning station. |
|
719
|
Wednesday, July 30, 2014, 11:51 |
Travis Cave | Conditioning Station | Maintenance | | | entrance module move | ITE Entrance module has been moved from
the east station to the conditioning station. |
|
721
|
Tuesday, August 05, 2014, 10:40 |
Travis Cave | ITE | Standard Operation | | | module move | ITE Entrance module has been moved back
to the east station. |
|
723
|
Wednesday, August 06, 2014, 11:11 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | module move | TM#3 with no target has been moved to the
northwest silo for storage. |
|
724
|
Wednesday, August 06, 2014, 11:12 |
Travis Cave | South Hot-Cell | Standard Operation | | SiC#30 | Spent target move | SiC#30 in pail #117 has been move to the
spent target vault and placed in spot 2C.
See attached PDF for details. |
|
725
|
Thursday, August 07, 2014, 10:45 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | module move | TM#4 has been moved from the south west
silo to the south hot cell. |
|
729
|
Monday, August 11, 2014, 10:34 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UC#10 | module move | TM#4 with UC#10 has been moved from the
conditioning station to the east target station. |
|
730
|
Monday, August 11, 2014, 10:38 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#10 | Electrical check | Electrical check of TM#4 with UC#10 from
thursday. |
|
736
|
Wednesday, September 03, 2014, 13:55 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Ta#43 | module move | TM#1 with Ta#43 has been moved from the
ITW to the south hot cell. |
|
737
|
Wednesday, September 03, 2014, 13:56 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | ZrC#6 | Electrical check | TM#1 with ZrC#6 electrical check at the
south hot cell. The conductance of target
on circuit A-D is a little lower then normal. |
|
738
|
Thursday, September 04, 2014, 09:45 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | ZrC#6 | module move | TM#1 with ZrC#6 has been moved from the
south hot cell to the conditioning station. |
|
742
|
Friday, September 05, 2014, 13:07 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#43 | Spent target move | Ta#43 has been moved from the south hot
cell to the spent target vault. See attached
PDF for details. |
|
745
|
Wednesday, September 10, 2014, 08:52 |
Travis Cave | ITW | Standard Operation | TM1 | ZrC#6 | module move | TM#1 with ZrC#6 has been moved from the
conditioning station to west target station. |
|
747
|
Friday, September 12, 2014, 14:21 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent target field measurements | Five of the ten target we want to measure
the fields on were done today. We will finish
up on Monday, and the spent target storage |
|
748
|
Monday, September 15, 2014, 11:23 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent target field measurements | Field measurements on the spent target
has finished see the attached PDF for details. |
|
750
|
Tuesday, September 23, 2014, 10:50 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#10 | module move | TM#4 with UC#10 has been moved from the
east target station to the south hot cell. |
|