ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
703
|
Wednesday, July 16, 2014, 13:02 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#9 | Electrical check |
Electrical check of the TM#1 with UC#9 post beam at the south hot cell. |
Attachment 1: TM1_UC9_Elecchk_postbeam.PDF
|
|
706
|
Wednesday, July 16, 2014, 14:28 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Ta#43 | Electrical check |
TM#1 with Ta#43 electrical check see attached PDF. |
Attachment 1: TM1_Ta43_elec_chk_shc.PDF
|
|
707
|
Thursday, July 17, 2014, 09:29 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Ta#43 | module move |
TM#1 with Ta#43 has been moved from the south hot cell to conditioning station. |
713
|
Thursday, July 24, 2014, 09:10 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | module move |
TM#2 has been moved to the hot cell from the north east silo. |
715
|
Monday, July 28, 2014, 09:29 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | no target | module move |
TM#2 has been moved from the south hot cell to the conditioning station. |
719
|
Wednesday, July 30, 2014, 11:51 |
Travis Cave | Conditioning Station | Maintenance | | | entrance module move |
ITE Entrance module has been moved from the east station to the conditioning station. |
721
|
Tuesday, August 05, 2014, 10:40 |
Travis Cave | ITE | Standard Operation | | | module move |
ITE Entrance module has been moved back to the east station. |
723
|
Wednesday, August 06, 2014, 11:11 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | module move |
TM#3 with no target has been moved to the northwest silo for storage. |
724
|
Wednesday, August 06, 2014, 11:12 |
Travis Cave | South Hot-Cell | Standard Operation | | SiC#30 | Spent target move |
SiC#30 in pail #117 has been move to the spent target vault and placed in spot 2C. See attached PDF for details. |
Attachment 1: Vault_Storage_August_6_2014.pdf
|
|
725
|
Thursday, August 07, 2014, 10:45 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | module move |
TM#4 has been moved from the south west silo to the south hot cell. |
729
|
Monday, August 11, 2014, 10:34 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UC#10 | module move |
TM#4 with UC#10 has been moved from the conditioning station to the east target station. |
730
|
Monday, August 11, 2014, 10:38 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#10 | Electrical check |
Electrical check of TM#4 with UC#10 from thursday. |
Attachment 1: TM4_UC10_elec_chk_shc.PDF
|
|
736
|
Wednesday, September 03, 2014, 13:55 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Ta#43 | module move |
TM#1 with Ta#43 has been moved from the ITW to the south hot cell. |
737
|
Wednesday, September 03, 2014, 13:56 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | ZrC#6 | Electrical check |
TM#1 with ZrC#6 electrical check at the south hot cell. The conductance of target on circuit A-D is a little lower then normal. |
Attachment 1: TM1_ZrC6_elec_chk_shc.PDF
|
|
738
|
Thursday, September 04, 2014, 09:45 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | ZrC#6 | module move |
TM#1 with ZrC#6 has been moved from the south hot cell to the conditioning station. |
742
|
Friday, September 05, 2014, 13:07 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#43 | Spent target move |
Ta#43 has been moved from the south hot cell to the spent target vault. See attached PDF for details. |
Attachment 1: Vault_Storage_September_5_2014.pdf
|
|
745
|
Wednesday, September 10, 2014, 08:52 |
Travis Cave | ITW | Standard Operation | TM1 | ZrC#6 | module move |
TM#1 with ZrC#6 has been moved from the conditioning station to west target station. |
747
|
Friday, September 12, 2014, 14:21 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent target field measurements |
Five of the ten target we want to measure the fields on were done today. We will finish up on Monday, and the spent target storage spreadsheet will be updated then. |
748
|
Monday, September 15, 2014, 11:23 |
Travis Cave | Spent Target Vault | Standard Operation | | | Spent target field measurements |
Field measurements on the spent target has finished see the attached PDF for details. |
Attachment 1: Vault_Storage_September_15_2014.pdf
|
|
750
|
Tuesday, September 23, 2014, 10:50 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#10 | module move |
TM#4 with UC#10 has been moved from the east target station to the south hot cell. |