ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
684
|
Tuesday, June 24, 2014, 11:12 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | TiC#4 | module move |
TM#4 with TiC#4 has been moved from the east target station to the south hot cell. |
686
|
Tuesday, June 24, 2014, 11:58 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | TiC#4 | Electrical check |
Electrical check of the TiC#4 on TM#3 post beam at the south hot cell, see attached PDF for details |
Attachment 1: TM3_TiC4_elec_chk_SHC_postbeam.PDF
|
|
691
|
Wednesday, June 25, 2014, 13:46 |
Travis Cave | South Hot-Cell | Repair | TM3 | no target | Electrical check |
Electrical check of TM#3 after the insulator repair. See attached PDF for details. |
Attachment 1: TM3electestsinsulrepair.PDF
|
|
693
|
Thursday, June 26, 2014, 11:15 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | SiC#30 | Electrical check |
Electrical check of the TM#3 with SiC#30 attached. Also an electrical check of TM#3 after the cleaning of ground electrode with no target attached. |
Attachment 1: TM3_SiC30_elecSHC.PDF
|
|
Attachment 2: TM3_elecchkaftclean.PDF
|
|
694
|
Thursday, June 26, 2014, 14:18 |
Travis Cave | Conditioning Station | Standard Operation | TM3 | SiC#30 | module move |
TM#3 with SiC#30 has been moved from the south hot cell to the conditioning station. |
697
|
Wednesday, July 02, 2014, 09:02 |
Travis Cave | ITE | Standard Operation | TM3 | SiC#30 | module move |
TM#3 with SiC#30 has been moved from the conditioning station to the east target station. |
701
|
Wednesday, July 16, 2014, 10:32 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#9 | module move |
TM#1 with UC#9 has been moved from the west target station to the south hot cell. |
703
|
Wednesday, July 16, 2014, 13:02 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#9 | Electrical check |
Electrical check of the TM#1 with UC#9 post beam at the south hot cell. |
Attachment 1: TM1_UC9_Elecchk_postbeam.PDF
|
|
706
|
Wednesday, July 16, 2014, 14:28 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Ta#43 | Electrical check |
TM#1 with Ta#43 electrical check see attached PDF. |
Attachment 1: TM1_Ta43_elec_chk_shc.PDF
|
|
707
|
Thursday, July 17, 2014, 09:29 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Ta#43 | module move |
TM#1 with Ta#43 has been moved from the south hot cell to conditioning station. |
713
|
Thursday, July 24, 2014, 09:10 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | module move |
TM#2 has been moved to the hot cell from the north east silo. |
715
|
Monday, July 28, 2014, 09:29 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | no target | module move |
TM#2 has been moved from the south hot cell to the conditioning station. |
719
|
Wednesday, July 30, 2014, 11:51 |
Travis Cave | Conditioning Station | Maintenance | | | entrance module move |
ITE Entrance module has been moved from the east station to the conditioning station. |
721
|
Tuesday, August 05, 2014, 10:40 |
Travis Cave | ITE | Standard Operation | | | module move |
ITE Entrance module has been moved back to the east station. |
723
|
Wednesday, August 06, 2014, 11:11 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | module move |
TM#3 with no target has been moved to the northwest silo for storage. |
724
|
Wednesday, August 06, 2014, 11:12 |
Travis Cave | South Hot-Cell | Standard Operation | | SiC#30 | Spent target move |
SiC#30 in pail #117 has been move to the spent target vault and placed in spot 2C. See attached PDF for details. |
Attachment 1: Vault_Storage_August_6_2014.pdf
|
|
725
|
Thursday, August 07, 2014, 10:45 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | module move |
TM#4 has been moved from the south west silo to the south hot cell. |
729
|
Monday, August 11, 2014, 10:34 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UC#10 | module move |
TM#4 with UC#10 has been moved from the conditioning station to the east target station. |
730
|
Monday, August 11, 2014, 10:38 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#10 | Electrical check |
Electrical check of TM#4 with UC#10 from thursday. |
Attachment 1: TM4_UC10_elec_chk_shc.PDF
|
|
736
|
Wednesday, September 03, 2014, 13:55 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Ta#43 | module move |
TM#1 with Ta#43 has been moved from the ITW to the south hot cell. |