2012
|
Wednesday, October 23, 2019, 07:58 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UCx#28 | UCx#28 Removed | UCx#28 has been removed from TM4. Guard
screws on 5(10) pin connector had to be removed
to get the connector to un-seat properly |
|
|
2013
|
Thursday, October 24, 2019, 14:11 |
Travis Cave | ITW | Standard Operation | TM4 | UC#29 | Module move | TM#4 with UC29 has been moved from
the south hot cell to the west target station. |
|
|
2018
|
Wednesday, October 30, 2019, 11:18 |
David Wang | ITW | Standard Operation | TM4 | UCx 29 | UCx 29 connection checklist | See attachment |
|
|
2051
|
Friday, January 24, 2020, 08:19 |
David Wang | ITW | Standard Operation | TM4 | | ITW water signal interlock check. | ITW water signal interlock check is done.
Everything works fine. ITW 2A2 tank water
signal is broken and is not ok on XT2A2 |
|
|
2054
|
Thursday, January 30, 2020, 10:22 |
David Wang | ITW | Standard Operation | TM4 | | TM4 water lines helium pressure leak check. | TM4 internal water lines helium
pressure leak check at ITW : 70psi helium
5 minutes on each circuits. Base leak |
|
|
2055
|
Thursday, January 30, 2020, 12:06 |
David Wang | ITW | Standard Operation | TM4 | | ITW primary and secondary vacuum seals leak check. | Connected LD to ITW(TM4) TP1. Base LR 0.0Xe-9
atm.cc/sec. Base pressure 0.0Xe-4 torr. All
ITW primary and secondary air to vacuum seals |
|
|
2056
|
Monday, February 03, 2020, 09:10 |
David Wang | ITW | Standard Operation | TM4 | | ITW TPs are switched off. started of ITW argon venting. | ITW is argon venting now.
Argon venting of ITW is done. It
took about 4.0 to 4.5 hours to vent the ITW |
|
|
2057
|
Monday, February 03, 2020, 09:14 |
David Wang | ITW | Standard Operation | TM4 | UCx 29 | TM4 UCx 29 disconnection checklist | TM4 has been disconnected in ITW. See attachment
checklist. |
|
|
2058
|
Tuesday, February 04, 2020, 14:22 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#29 | Module move | TM#4 with UC#29 has been moved from
the west target station to the south hot
cell. |
|
|
2059
|
Wednesday, February 05, 2020, 08:22 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UCx#29 | UCx#29 removed | UCx#29 has been removed from TM$ and placed
in a pail backfilled with argon until it
can be moved to the storage vault. |
|
|
2060
|
Wednesday, February 05, 2020, 10:49 |
David Wang | Conditioning Station | Standard Operation | TM4 | | Remove of TM4 from SHC to TCS. | TM4 has been moved from SHC to TCS. No
target on module. The move is successful.
|
|
|
2061
|
Wednesday, February 05, 2020, 10:54 |
David Wang | Conditioning Station | Standard Operation | TM4 | | Roughing out TM4 at TCS. | TCS MP1 is started to rough out TM4 and
TCS. TCS and TM4 will be under roughing only
today and tomorrow. No plan to start TCS |
|
|
2062
|
Wednesday, February 05, 2020, 11:03 |
David Wang | South Hot-Cell | Standard Operation | TM4 | UCx 29 | UCx 29 post run electrical check | UCx 29 TM4 post run electrical check is
done before target is removed. Everything
is normal on measurements. |
|
|
2064
|
Thursday, February 06, 2020, 13:32 |
Adam Newsome | South Hot-Cell | Maintenance | TM4 | | TM4 moved from Conditioning Station to South Hot Cell | TM4 was moved from conditioning station
to south hot cell in preparation for wiring
replacement. No target. |
|
|
2065
|
Friday, February 07, 2020, 08:05 |
chad fisher | South Hot-Cell | Development | TM4 | | Containment box off for IGLIS | The containment box has been removed from
TM4 in prep for the IGLIS wiring job. |
|
|
2066
|
Friday, February 14, 2020, 11:25 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | Dummy Target | Module move | TM#4 with dummy target has been moved
from the south hot cell to the conditioning
station. |
|
|
2067
|
Friday, February 14, 2020, 14:06 |
David Wang | Conditioning Station | Standard Operation | TM4 | | TCS vacuum system and water sytem are switched on. | All turbo pumps are started. |
|
|
2068
|
Friday, February 14, 2020, 14:13 |
David Wang | South Hot-Cell | Standard Operation | TM4 | | SIS dummy target for IGLIS TM4 electrical check | Electrical check and HS, window leak check
result at SHC. See attachment. |
|
|
2070
|
Wednesday, February 26, 2020, 08:45 |
David Wang | Conditioning Station | Standard Operation | TM4 | | Remove of TM4 from TCS to SW silo | TM4 has been moved from TCS to SW silo.
The move is fine. |
|
|
2085
|
Monday, March 16, 2020, 09:25 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Module move | TM#4 has been moved from the silo
to the south hot cell. |
|