512
|
Friday, October 18, 2013, 14:56 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | Electrical check |
With the coil line removed an electrical check was done on TM#4 at the South Hot Cell see attached pdf. |
Attachment 1: TM#4_no_target_post_coilelectest.PDF
|
|
516
|
Tuesday, October 22, 2013, 11:18 |
Travis Cave | ITW | Standard Operation | TM1 | UC#7 | module move |
TM#1 with UC#7 has been moved from the ITW to the south west silo. |
521
|
Wednesday, October 23, 2013, 09:28 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#7 | module move |
TM#1 with UC #7 has been moved from the south west silo to the south hot cell. |
522
|
Wednesday, October 23, 2013, 12:07 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | module move |
TM#1 with no target has been moved back to the south west silo from the south hot cell. |
523
|
Thursday, October 24, 2013, 11:31 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#7 | Spent target move |
UC #7 has been moved from the south hot cell to the spent target vault, it was placed in pail #110 and put in slot 8B of the vault, it was 22.6mSv/hr upon removal from the hot cell. See attached PDF for vault details. |
Attachment 1: Vault_Storage_October_24_2013.pdf
|
|
524
|
Thursday, October 24, 2013, 11:32 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | module move |
TM#4 with no target has been moved from the conditioning station to the south hot cell. |
528
|
Friday, October 25, 2013, 10:26 |
Travis Cave | ITW | Standard Operation | TM4 | Ta#41 | module move |
TM#4 with Ta#41 has been moved from the south hot cell to the west target station. |
530
|
Friday, October 25, 2013, 14:09 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#41 | Target conductance |
Anders Mjos wrote: |
The conductance check on the electrical check was found to be outside of accepted values for the TBHT at 7.0 mOhm. A successful attempt to reduce the conductance was made by re-tightening the bolts on the TGHT legs in the SHC. Grant operated the manipulator and torqued the bolts to about 1/8 of a turn with the air ratchet. The conductance across the TGHT (A-B) could be improved from 7.0 mOhm to 6.2 mOhm by re-tightening the bolts. The value is still somewhat higher than usual, but was deemed to be acceptable. Measurements attached.
|
The full electrical check was done on October 25th 2013. The results are in the attached PDF. The higher value of the conductance was dealt with see Anders Mjos elog entry for those details. |
Attachment 1: TM#4_Ta#41_elec_test_SHC.PDF
|
|
533
|
Friday, November 01, 2013, 09:08 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | module move |
TM#2 has been moved from the north west silo to the south hot cell. The module has a field of about 3.1mSv/hr when it was lowered into the hot cell. |
548
|
Tuesday, November 19, 2013, 10:52 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | NiO#2 | module move |
TM#3 with NiO#2 moved from ITE to the south hot cell. |
552
|
Wednesday, November 20, 2013, 09:52 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | module move |
TM#3 with no target has been moved from the south hot cell to the north east silo. |
555
|
Friday, November 22, 2013, 10:29 |
Travis Cave | Spent Target Vault | Standard Operation | | NiO#2 | Spent target move |
NiO#2 has been moved from the south hot cell into spent target storage. It was placed in pail 111 in slot 3C of the storage vault. It was 76.4mSv/hr upon removal from the south hot cell. |
Attachment 1: Vault_Storage_November_22_2013.pdf
|
|
556
|
Monday, November 25, 2013, 11:48 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | module move |
TM#3 with no target has been moved from the north east silo to the south hot cell. |
557
|
Tuesday, November 26, 2013, 14:10 |
Travis Cave | Crane | Maintenance | | | Thermal relay replaced |
The bad thermal motor protection relay for the crane has been replaced with a new unit. Crane was tested in pendant(local) operation and all drives worked. |
562
|
Monday, December 02, 2013, 11:29 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | module move |
TM#3 with no target has been moved from the south hot cell to the northeast silo. |
564
|
Tuesday, December 03, 2013, 10:35 |
Travis Cave | ITW | Standard Operation | | | fields above and in the target station with blocks off |
The blocks have been removed from the west target station. The fields at the top of the target pit at the railing at waist level is about 80uSv/hr, Turbo pumps are about 805uSv/hr, backing lines for the turbos about a 1mSv/hr and the average field in the area of work down in the pit is about 600 to 750uSv/hr. The proton beam went off at 10:45 on December 2nd, these measurements were done at 09:00 on December 3rd.
Another set of field measurement was done at the west target station. At the top of the west target station at the railing the field ranged from 50 to 70 uSv/hr. The turbo pumps had field of about 650uSv/hr, the area over the dump was about 750uSv/hr, the area over the HV cover and the south side was about 450uSv/hr. These measurements were done at 13:15 on December 3rd. |
566
|
Wednesday, December 04, 2013, 10:44 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#41 | module move |
TM#4 with Ta#41 has moved to the south hot cell, the move it self was uneventful but, the fields on the module are extremely high when lowering it down into the south hot cell the module had a maximum field of about 392mSv/hr. The shield plug was also installed remotely as well due to the 12mSv/hr field at the top of the west target station due to shine from the dump. |
570
|
Wednesday, December 04, 2013, 14:09 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#41 | Electrical check |
Electrical check of TM#4 with Ta#41 post beam at the south hot cell. See PDF for details |
Attachment 1: TM#4_Ta41_electest_SHC_PostBeam.PDF
|
|
571
|
Thursday, December 05, 2013, 12:04 |
Travis Cave | ITE | Standard Operation | TM4 | UC#8 | module move |
TM#4 with UC#8 has been moved from the south hot cell to the east target station. |
572
|
Thursday, December 05, 2013, 12:51 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#8 and no target | Electrical check |
Electrical check was done on TM#4 without a target and with the UC#8 target on see attached PDF for results. |
Attachment 1: TM#4_UC8_electest_SHC.PDF
|
|
Attachment 2: TM#4_notarget_electest_SHC.PDF
|
|