  530   Friday, October 25, 2013, 14:09 Travis CaveSouth Hot-CellStandard OperationTM4Ta#41Target conductance

    

       
            
 TM#4_Ta#41_elec_test_SHC.PDF 
  533   Friday, November 01, 2013, 09:08 Travis CaveSouth Hot-CellStandard OperationTM2no targetmodule moveTM#2 has been moved from the north west
silo to the south hot cell. The module has
a field of about 3.1mSv/hr when it was lowered
  
  548   Tuesday, November 19, 2013, 10:52 Travis CaveSouth Hot-CellStandard OperationTM3NiO#2module moveTM#3 with NiO#2 moved from ITE to the south
hot cell.
  
  552   Wednesday, November 20, 2013, 09:52 Travis CaveSouth Hot-CellStandard OperationTM3no targetmodule moveTM#3 with no target has been moved from
the south hot cell to the north east silo.
  
  555   Friday, November 22, 2013, 10:29 Travis CaveSpent Target VaultStandard Operation NiO#2Spent target moveNiO#2 has been moved from the south hot
cell into spent target storage. It was placed
in pail 111 in slot 3C of the storage vault.
 Vault_Storage_November_22_2013.pdf 
  556   Monday, November 25, 2013, 11:48 Travis CaveSouth Hot-CellStandard OperationTM3no targetmodule moveTM#3 with no target has been moved from
the north east silo to the south hot cell.
  
  557   Tuesday, November 26, 2013, 14:10 Travis CaveCraneMaintenance  Thermal relay replacedThe bad thermal motor protection relay
for the crane has been replaced with a new
unit. Crane was tested in pendant(local)
  
  562   Monday, December 02, 2013, 11:29 Travis CaveSouth Hot-CellStandard OperationTM3no targetmodule moveTM#3 with no target has been moved from
the south hot cell to the northeast silo.
  
  564   Tuesday, December 03, 2013, 10:35 Travis CaveITWStandard Operation  fields above and in the target station with blocks offThe blocks have been removed from the west
target station. The fields at the top of
the target pit at the railing at waist level
  
  566   Wednesday, December 04, 2013, 10:44 Travis CaveSouth Hot-CellStandard OperationTM4Ta#41module moveTM#4 with Ta#41 has moved to the south
hot cell, the move it self was uneventful
but, the fields on the module are extremely
  
  570   Wednesday, December 04, 2013, 14:09 Travis CaveSouth Hot-CellStandard OperationTM4Ta#41Electrical checkElectrical check of TM#4 with Ta#41 post
beam at the south hot cell. See PDF for details
 TM#4_Ta41_electest_SHC_PostBeam.PDF 
  571   Thursday, December 05, 2013, 12:04 Travis CaveITEStandard OperationTM4UC#8module moveTM#4 with UC#8 has been moved from the
south hot cell to the east target station.
  
  572   Thursday, December 05, 2013, 12:51 Travis CaveSouth Hot-CellStandard OperationTM4UC#8 and no targetElectrical checkElectrical check was done on TM#4 without
a target and with the UC#8 target on see
attached PDF for results.
 TM#4_UC8_electest_SHC.PDFTM#4_notarget_electest_SHC.PDF 
  576   Monday, December 09, 2013, 13:15 Travis CaveSpent Target VaultStandard Operation Ta#41Spent target moveThe spent Ta#41 target has been moved from
the south hot cell to the spent target storage
vault. It is an unnumbered pail (should be
 Vault_Storage_December_9_2013.pdf 
  584   Monday, January 20, 2014, 14:37 Travis CaveITEStandard OperationTM4UC#8module moveTM#4 with UC#8 has been moved from the
east target station to the south hot cell.
  
  585   Tuesday, January 21, 2014, 14:32 Travis CaveSouth Hot-CellStandard OperationTM4no targetmodule moveTM#4 has been moved from the south hot
cell to the north west silo.
  
  587   Wednesday, January 22, 2014, 15:00 Travis CaveSpent Target VaultStandard Operation UC#8Spent target moveUC#8 has been moved from the south hot
cell to the vault storage. It was placed
in pail 113 and placed in slot 8A of the
 Vault_Storage_January_22_2014.pdf 
  589   Thursday, January 30, 2014, 13:46 Travis CaveConditioning StationStandard OperationTM2no targetmodule moveTM#2 has been moved from the conditioning
station to the south hot cell.
  
  590   Monday, February 03, 2014, 14:45 Travis CaveSpent Target VaultStandard Operation  Spent targets to mini storage and the F-308s to the Target HallTargets NiO#1(101), Nb#5(85), TaC#1(92),
and ZrC#5(81) have been moved from the storage
vault and placed in the mini storage. The
 Vault_Storage_February_3_2014.pdfMini_Vault_Storage_February_3_2014.pdf 
  594   Wednesday, February 05, 2014, 14:12 Travis CaveSpent Target VaultStandard Operation  Targets moved from mini storage to F-308sAll targets in the mini storage (4) have
been moved from there and placed into the
F-308s and those have been moved to the mech
  