Monday, February 24, 2014, 11:05, chad fisher, South Hot-Cell, Repair, TM2, , Circuit D blank off
|
The blank off with the o-ring has been removed, manipulator fixed, circuit D water block sealinhg surfaces cleaned and blank off with c-seals installed
and torqued. Leak check will occur shortly. |
Monday, February 24, 2014, 12:09, chad fisher, South Hot-Cell, Repair, TM2, , C-seal blank off test
|
Circuit D has passed the vacuum leak check. Jig has been removed and containment box re-installed for move to conditioning station. |
Monday, February 24, 2014, 13:52, Travis Cave, South Hot-Cell, Standard Operation, TM2, no target, module move
|
TM#2 moved from the south hot cell to the conditioning station. |
Tuesday, February 25, 2014, 06:53, David Wang, South Hot-Cell, Repair, TM2, , Leak check on TM2 tube heater (+) water line with blank off(C-seal) installed on WB.
|
Chad and I did the leak check on TM2 tube heater (+) water line with blank off and C-seal installed on WB at South Hot Cell.The
line was easy to pump down to 0.0xE-9atm.cc/sec and 0.0XE-4 torr on leak detector. Chad flushed lot helium around the water block (10 sec spray). No response
had been found on leak detector. |
Tuesday, March 25, 2014, 09:11, chad fisher, South Hot-Cell, Standard Operation, TM4, Ta#42, Ta#42 install and "new" 9 pin
|
Ta#42 has been installed onto TM4. The "new" 9 pin connector was not an issue...attually went on better than any other previous one. Leaving
the mounting screws loose on the target half allowed use of the manipulator to center the pins and insert them with ease. |
Tuesday, March 25, 2014, 13:29, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#42, Electrical check
|
TM#4 was checked electrically with and without target on it, see attached PDFs for details. |
Wednesday, March 26, 2014, 06:57, David Wang, South Hot-Cell, Standard Operation, TM4, Ta#42, Leak check on TM4 HS water line with new Ta #42 target.
|
Chad and I leak checked TM4 HS line with Ta#42 target on the module. The leak detector base LR 0.0xE-9 atm.cc/sec, base pressure0.0xE-4 torr. Chad applied
helium to the joints, and flushed the helium around the target. No leak has been found.I will do helium pressure test on this circuit at CS later. |
Friday, April 04, 2014, 14:16, Travis Cave, South Hot-Cell, Standard Operation, TM3, no target, module move
|
TM#3 with no target has been moved from the south west silo to the south hot cell. |
Monday, April 07, 2014, 10:48, Travis Cave, South Hot-Cell, Standard Operation, TM3, no target, Electrical check
|
TM#3 electrical check at the south hot cell with no target to give us a base line and show that things are ok with the module for the start of
the running year. |
Monday, April 07, 2014, 11:49, Travis Cave, South Hot-Cell, Standard Operation, TM3, TiC#4, Electrical check
|
Electrical test of TM#3 with TiC#4 attached. See PDF. |
Monday, April 07, 2014, 14:13, chad fisher, South Hot-Cell, Standard Operation, TM3, TiC#4, TiC#4 installation
|
TiC#4 has been installed onto TM3 |
Tuesday, April 08, 2014, 09:05, Travis Cave, South Hot-Cell, Standard Operation, TM3, TiC#4, module move
|
TM#3 with TiC#4 has been moved from the south hot cell to the conditioning station. |
Wednesday, April 09, 2014, 11:10, David Wang, South Hot-Cell, Standard Operation, TM3, , TM3 heat shield circuit leack check at SHC
|
This Monday morning, Chad and I leak checked heat shielding circuit on TM3 with new target installed. The base LR on LD :0.0xE-9 atm.cc/sec, base pressure
0.0xE-4 torr. Chad sprayed helium twice on the VCR joints. No leak has been found. The circuit will be pressured with helium at CS. |
Tuesday, May 27, 2014, 11:45, Travis Cave, South Hot-Cell, Standard Operation, TM4, Ta#42, Electrical check
|
TM#4 electrical check with Ta#42 attached post beam at the south hot cell. |
Wednesday, May 28, 2014, 08:48, Travis Cave, South Hot-Cell, Standard Operation, TM4, no target, module move
|
TM#4 with no target has been moved from the south hot cell to the south west silo. |
Monday, June 02, 2014, 10:52, Travis Cave, South Hot-Cell, Standard Operation, TM1, no target, module move
|
TM#1 with no target has been moved from the north west silo to the south hot cell. |
Monday, June 02, 2014, 11:25, chad fisher, South Hot-Cell, Standard Operation, TM1, UCx #9, UCx #9 Installed
|
UCx #9 has been installed. |
Monday, June 02, 2014, 11:28, Travis Cave, South Hot-Cell, Standard Operation, TM1, UC#9, Electrical check
|
TM#1 with UC#9 electrical check see attached pdf for details. |
Monday, June 02, 2014, 11:59, David Wang, South Hot-Cell, Standard Operation, TM1, , Leak check on TM1 HS water line with new UC9# target installed
|
Chad and I leak checked TM1 HS and UC9# VCR fittings. No response had been found on leak detector during the test. I will do helium pressure test
on it at CS later. |
Tuesday, June 24, 2014, 11:12, Travis Cave, South Hot-Cell, Standard Operation, TM3, TiC#4, module move
|
TM#4 with TiC#4 has been moved from the east target station to the south hot cell. |
|