  ID Date Author Category Type Module Target/Number Subject
  2328   Tuesday, June 07, 2022, 14:15 Frank SongITE/ITWStandard OperationTM2SiC#42Module Connection

 TM2 with Febiad target SiC#42 was connected in ITW.

  2327   Monday, June 06, 2022, 14:15 Frank SongSouth Hot-CellStandard OperationTM2SiC#42TM2 FEBIAD with Target and No external Connections

 An electrical check was done at SHC for TM2 with FEBIAD SiC #42 Target. 

  2326   Wednesday, May 25, 2022, 13:43 Frank SongITWStandard OperationTM2Febiad-Testmodule disconnection

 TM2 with a test target was disconnected in ITW.

  2325   Wednesday, May 25, 2022, 13:23 David WangITEStandard OperationTM4 Annual ITE water signal interlocks.

Annual ITE water signal interlocks check is done with Rob Shank. All ITE water signal  interlocks work fine.

  2324   Wednesday, May 25, 2022, 10:23 Nadia JorgensonSpent Target VaultRepair  F-308 Loading, Mini-Storage Vault Failure

5 pails were moved from the mini-storage vault into F-308's

At one point during the loading the mini-storage vault door would not close. Cause was a blown fuse, which was replaced and operations were able to continue as usual. Possible reason the fuse blow was a tilted pail that may have become jammed between the tray and the roof of the mini-storage vault. 

 

[Edit 2022-12-01, Adam Newsome]: the pails which were removed were: 220, 227, 233, 235, 238

  2323   Thursday, May 19, 2022, 15:05 Frank SongITEStandard OperationTM4UCx#37UCx#37 P2N connection on TM4

 TM4 with UCx#37 was connected in ITE. Attachment available.

  2322   Thursday, May 19, 2022, 11:42 Travis CaveSpent Target VaultStandard Operation Sic#39, Ta#59, C#2, UC# 32 & 30Targets moved to the mini vault.

 Sic#39, Ta#59, C#2, UC# 32 & 30 have been moved from the spent target vault to the mini vault. See the attached pdf for details of the vaults.

  2321   Wednesday, May 18, 2022, 13:52 Frank SongSouth Hot-CellStandard OperationTM4UCx#37electrical check

 The TM4 with installed target #UCx37 had been electric checked at SHC. PICs attached.

  2320   Wednesday, May 11, 2022, 16:29 Nadia JorgensonSpent Target VaultStandard Operation  Routine mechanical inspection: storage vault

 An inspection was performed on drive systems for the main storage vault by Dan McDonald, Travis Cave and Nadia Jorgenson. The functionality was not tested. Some areas for improvement noted, but otherwise nothing concerning was discovered. 

 

Notes:

  • The wire insulation to the motor is showing wear and tear. Should be replaced in the future. For now was patched with electrical tape, see picture. May be beneficial to add an e-chain for the portion of the wiring that moves when door is opening and closing

  • Emergency close mechanism cable should be changed to have a 5/32” Nico Sleeve

  • Moving parts still need to be lubricated


  • Chain inspected (OK)

  • Gearbox inspected - OK

  • All drive system set screws checked and tightened

  • Sprocket alignment checked - OK

  • Limit switches checked - OK

  • Emergency close mechanism cable checked - OK

 

 

 

  2319   Wednesday, May 11, 2022, 16:15 Nadia JorgensonSpent Target VaultStandard Operation  Emergency Close Mechanism Test

 The emergency close mechanism for the Storage Vault door was tested by Travis Cave, Nadia Jorgenson, and Dan McDonald. The door was opened to its fully open limit, then closed with the emergency system. 

The test was successful.

  2318   Friday, May 06, 2022, 10:12 Adam NewsomeSpent Target VaultMaintenance  Annual Inspection of Mini-Storage Vault

The annual inspection of the mini-storage vault was performed today. The following items were checked:

  • Cabling and cable management
  • Connectors
  • Controls box - internal wiring and components, functionality
  • Limit switches - functionality, wiring, mounting
  • Motor
  • Bearings
  • Set screws
  • Miscellaneous fasteners (some loose, but were tightened)

Everything appears to be in good working order.

Note: in the near future, the bearings should be greased. This is planned to take place during the next inspection of the main storage vault.

  2317   Thursday, April 28, 2022, 08:16 David WangITWStandard OperationTM2  Annual ITW water signal interlocks check .

Annual ITW water signal interlocks check was done with TM2 in ITW.   Water signal interlocks on all water circuits related to TM and 2A beam lines in ITW work fine. 

  2316   Thursday, April 28, 2022, 07:24 Frank SongITWStandard OperationTM2Febiad Test TargetModule Connection

 TM2 was connected in ITW with a Febiad Test Target. 

  2315   Thursday, April 21, 2022, 13:29 Frank SongSouth Hot-CellStandard OperationTM2Febiad TESTTM2 FEBIAD WITH A TEST TARGET

 A Test Febiad Target was installed and checked at SHC. 

  2314   Wednesday, April 13, 2022, 11:54 Carla BabcockSouth Hot-CellMaintenanceTM2 EZL cable change

Chad changed the EZL cable and plugs on TM2. New cable runs along the cable trays.

  2313   Monday, April 04, 2022, 21:04 Carla BabcockConditioning StationDevelopmentTM2 HV testing of IGLIS wires in TM2

TM2 is in the TCS without containment box for HV testing following the installation of the IGLIS wiring.

Not great results so far - sat at 42.5kV for nearly 2 hours, current around 200uA and occasional sparks. I did not have time to go higher, will do this tomorrow. The sparks could be conditioning but it looks a bit suspicious to me. We will see if the ramp up tomorrow is very easy and how high we can go. I have data from HV testing of TM2 in December for comparison.

The EZL was reacting to all sparks, so I went into the target hall to see if it was sparking on the module top, but there was no sparking there.

 

Possible mitigations:

  1. Re-do the connections on top of the service cap to remove the extra length on the wires inside the service cap and inspect the routing carefully to make sure nothing is in the wron place.
  2. Inspect the wiring in the source tray to see if there is evidence of sparking in a certain area.

 

Second round of testing Tuesday April 5 2022:

Much better results, seems most of the sparking was conditioning. Went right up to 42.5kV with no issues. Spent quite a while getting up to 50kV, and didn't leave it there for more than a couple mins. May be running into the limitations of the HV cage at this point. Bias current was much lower, something like 140uA at 45kV.

 

Third round of testing Wednesday April 6 2022:

Ramped easily back to 45kV, a little more sparking above that. Sat at 47kV for ~30mins with no sparks. Won't try to go higher in case of issues with the cage. Will try to condition up to 50kV in the station. Other than the possible low megger value between B and C, all looks good.

  2312   Monday, April 04, 2022, 10:44 Nadia JorgensonSouth Hot-CellRepair  Turntable Chain Repair

 Last week we repaired the South Hot Cell turntable chain/sprocket. Chain was loose and there was a few section where the chain was not lining up properly with the sprockets.

3 issues were discovered:

 

-        One of the pins was bent. It’s been replaced but is a temporary fix. Need to replace them with stronger pins.

 

-        The smaller sprockets near the motor were too far from the main turntable sprocket which was causing the links to not immediately line up with the teeth on the turntable sprocket. With too much slack in the chain, it’s likely that this is were the misalignment was starting. This was fixed by adjusting the motor position and the position of the yellow plate bolted to the floor.

 

-        The yellow plate that is bolted into the floor has oversized holes relative to the bolts/washers used. This allows us to adjust the position, but the washers are to thin and are being bent/pulled into the holes. Should be replaced with thicker washers that can withstand the tension and this will help prevent the plate from sliding out of position.

  2311   Wednesday, March 02, 2022, 10:51 David WangITE/ITWStandard Operation  Replaced old turbopump and 2A3M20 wire scanner are transferred to cyclotron tunnel.

Replaced 9 old turbo pumps from ITE/ ITW and  one 2A3M20 wire scanner from ITE are transferred to cyclotron tunnel for storage. It is TH RAD waste cleanup task in winter shut down.

  2310   Tuesday, March 01, 2022, 11:51 David WangSpent Target VaultMaintenance  UCx #32 has been repacked in NHC.

UCx 32# P2N target in vault slot 1B is repacked is morning for Ferran to take out his samples( in two small plastic containers) stored in pail last July when Chad did the spent target job. The job went well.  Old pail # is 254# and new pail # is 233. It is put back to 1B in vault.

  2309   Friday, February 25, 2022, 10:22 Adam NewsomeSouth Hot-CellDevelopment  Addition of E-Stops and Turntable Vertical Motion Limit Switch

Two changes have been made to the control system to the South Hot Cell:

  1. Addition of two emergency stop buttons: one located in the Target Hall on the wall adjacent to the hot cell, and one located on the control panel adjacent the operator station.
  2. Addition of limit switches to the turntable's vertical drive system to prevent over-travel at both the upper and lower limits.

 

The emergency stops will both stop all turntable motion: vertical and rotational.

An update to operating procedures: in order for the vertical motion system to function, the limit switch cable must be plugged in. When plugging in the vertical drive motor to the wall outlet as per normal operating procedure, it is now required to also connect the limit switch (which is mounted near the motor on the driveshaft) to the cable coming from the appropriately labelled junction box on the South wall (M12 connector).

 

These changes are based on electrical drawings IRH2083 - IRH2085 and mechanical assembly drawing ITA6739. The changes have been commissioned according to commissioning plan Document-218490. The commissioning report will be uploaded to DocuShare. The work permit for this upgrade was I2022-02-15--3.

 