  1576   Wednesday, July 05, 2017, 11:18 Anders MjosConditioning StationMaintenanceTM4Ta#52Changed electrical configuration to cathode bias John Chow configured TCS to cathode
bias mode (IRH1538). The anode P/S is in
positive mode.
  
  1580   Monday, July 10, 2017, 10:19 David WangConditioning StationStandard OperationTM4 Turned off TCS water systemPrepare for TM4 move tomorrow morning.   
  1581   Tuesday, July 11, 2017, 10:20 Travis CaveITEStandard OperationTM4Ta#52Module move TM#4 with Ta#52 has been moved from
the conditioning station to the east target
station.
  
  1602   Monday, August 28, 2017, 11:28 Travis CaveITEStandard OperationTM4Ta#52Module move TM#4 with Ta#52 has been moved from
the east station to the south hot cell.
  
  1603   Monday, August 28, 2017, 12:07 chad fisherSouth Hot-CellStandard OperationTM4UCx#21Ta#52 removed UCx#21 installedTa#52 has been removed from TM$ and UCx#21
installed with new mounting and high current
hardware. High current fasteners torqued
  
  1604   Monday, August 28, 2017, 14:34 Travis CaveConditioning StationStandard OperationTM4UC#21Module move TM#4 with UC#21 has been moved from
the south hot cell to the conditioning station.
  
  1605   Monday, August 28, 2017, 14:40 Travis CaveSouth Hot-CellStandard OperationTM4UC#21Electrical CheckThe results of the electrical check of
TM#4 with UC#21 attached.
 TM4_UC21_elecchk_SHC.PDF 
  1606   Tuesday, August 29, 2017, 08:59 David WangConditioning StationStandard OperationTM4 TM4 HS line leak checksTM4 HS line leak checks are done, at SHC
and TCS. SHC: Helium spray. TCS: Helium 
pressurize 70psi.  LD base LR 0.0 X
  
  1607   Tuesday, August 29, 2017, 09:01 David WangConditioning StationStandard OperationTM4 TM4 has been connnected at TCS.TM4 has been connected at TCS. TCS water
system has been started for TM4. TM4 and
TCS vacuum pumping down is good so far.
  
  1609   Tuesday, September 05, 2017, 06:33 David WangConditioning StationStandard OperationTM4 Turned off TCS water system and vacuum system.Argon vent and disconnect TM4 at TCS.   
  1610   Tuesday, September 05, 2017, 10:25 Travis CaveITEStandard OperationTM4UC#21Module move TM#4 with UC#21 has been moved from
the conditioning station to the east target
station.
  
  1643   Tuesday, October 17, 2017, 10:56 Travis CaveSouth Hot-CellStandard OperationTM4UC#21Module move TM#4 with UC#21 has been moved from
the east target station to the south hot
cell.
  
  1644   Wednesday, October 18, 2017, 10:45 Travis CaveSouth Hot-CellStandard OperationTM4SiC#37Electrical Check The results of the electrical check
of TM#4 with SiC#37, see attached PDF.
 TM4_SIC37_elec_chk_SHC.pdf 
  1645   Wednesday, October 18, 2017, 10:46 Travis CaveConditioning StationStandard OperationTM4SiC#37Module move TM#4 with SiC#37 has been moved from
the south hot cell to the conditioning station.
  
  1647   Thursday, October 19, 2017, 10:11 David WangConditioning StationStandard OperationTM4 Leak check on TM4 HS line at SHC and TCS.Chad and I leak checked TM4 HS line after
new target is installed yesterday. No leak
has been found. Also, I helium pressurized
  
  1649   Thursday, October 19, 2017, 14:20 Anders MjosConditioning StationStandard OperationTM4SiC#37SiC#37 ConditioningThursday, October 19, 2017, 14:20: EE configured
for conditioning. HV cage locked up
Thursday, October 19, 2017, 16:46:
 SiC#37_BIAS_current_vs_voltage.xlsxSiC#37.docx 
  1651   Tuesday, October 24, 2017, 11:58 Travis CaveITEStandard OperationTM4SiC#37Module move TM#4 with SiC#37 has been moved from
the conditioning station to the east target
station. A measurement was taken on TM#4
  
  1652   Thursday, October 26, 2017, 09:56 Anders MjosITERepairTM4SiC#37Leak on multi pin connector feedthroughOn maintenance day Tuesday, the roughing
of the target station could not go below
1.5 Torr. A brief troubleshooting on Tuesday
  
  1672   Tuesday, January 02, 2018, 11:28 David WangITEStandard OperationTM4 ITE annual water interlock check.Eric and I finished ITE annual water interlock
check. Everything works properly.
  
  1685   Tuesday, February 13, 2018, 13:54 Anders MjosITEStandard OperationTM4SiC#37Target module disconnectedTM disconnected by David and Yasmine Feb
8th
  