  180   Tuesday, September 18, 2012, 09:13 Travis CaveSouth Hot-CellStandard OperationTM1no targetmodule moveTM#1 moved from the south west silo to
the south hot cell, move went well.
  
  183   Wednesday, September 19, 2012, 11:23 Travis CaveSouth Hot-CellStandard OperationTM1Nb#7Electrical checkTM#1 with Nb#7 attached was electrically
checked at the south hot cell yesterday,
see attached pdf for details. Some notes
 TM1_Nb7_Elec_chk_SHC.PDF 
  184   Wednesday, September 19, 2012, 11:24 Travis CaveConditioning StationStandard OperationTM1Nb#7module moveTM#1 with Nb#7 was moved from the south
hot cell to the conditioning station. Move
went well.
  
  185   Thursday, September 20, 2012, 08:45 Travis CaveConditioning StationStandard OperationTM1Nb#7Electrical checkElectrical check was done at the conditioning
station this morning results are on the attached
PDF.
 TM1_Nb7_Elec_chk_CS.PDF 
  187   Tuesday, September 25, 2012, 10:34 Travis CaveITWStandard OperationTM1Nb#7module moveTM#1 with Nb#7 moved from the conditioning
station to the west target station. Move
went well.
  
  197   Wednesday, October 24, 2012, 11:51 Travis CaveITEStandard OperationTM4UCx#5module movedYesterday TM#4 with UCx#5 was moved to
the east target station from the conditioning
station,  move went well.
  
  198   Wednesday, October 24, 2012, 11:53 Travis CaveSpent Target VaultStandard Operation NiO#1Spent target moveThe NiO #1 spent target was placed into
storage today. It is in pail number 01 (101
on Vault Status page) and located in slot
 Vault_Storage_October_24_2012.pdf 
  201   Friday, November 02, 2012, 13:18 Travis CaveSpent Target VaultStandard Operation  spent target assayThis week six targets and the two source
trays were assayed and surveyed from the
storage vault. see attached PDF for details.
 Vault_Storage_November_2_2012.pdf 
  202   Tuesday, November 06, 2012, 11:06 Travis CaveITWStandard OperationTM1Nb#7module moveTM#1 with Nb#7 has been moved from the
west target station to the south hot cell
move went well.
  
  206   Wednesday, November 07, 2012, 09:25 Travis CaveSouth Hot-CellStandard OperationTM1TiC#3Electrical checkTM#1 with TiC#3 target has had the electrical
performed on it. See attached PDF for details.
 TM_1_TiC_3_Elec_check_SHC.PDF 
  207   Wednesday, November 07, 2012, 10:25 Travis CaveConditioning StationStandard OperationTM1TiC#3module moveTM#1 with TiC#3 has been moved from the
south hot cell to the conditioning station,
move went well.
  
  211   Friday, November 09, 2012, 09:20 Travis CaveConditioning StationStandard OperationTM1TiC#3Electrical checkElectrical check performed on TM#1 with
TiC#3 at the conditioning station under vacuum.
See PDF for details.
 TM_1_TiC_3_Elec_check_CS_Vac.PDF 
  212   Friday, November 09, 2012, 14:35 Travis CaveSpent Target VaultStandard Operation Nb#7Spent target moveNb#7 was moved from the south hot cell
to the target storage vault. The target was
placed in pail #103 in slot 6A of the vault
 Vault_Storage_November_9_2012.pdf 
  213   Tuesday, November 13, 2012, 10:55 Travis CaveITWStandard OperationTM1TiC#3module moveTM#1 with TiC #3 moved from the conditioning
station to the west target station, 
move went well.
  
  216   Wednesday, November 14, 2012, 11:51 Travis CaveSpent Target VaultStandard Operation  Moving the spent targets to mini storage.Five spent targets have been moved from
the storage vault to the mini storage vault.
The five targets are as follows: SiC #25,
 Vault_Storage_November_14_2012.pdfMini_Vault_Storage_November_14_2012.pdf 
  217   Wednesday, November 21, 2012, 09:36 Travis CaveSpent Target VaultStandard Operation  Spent target moveOn Nov 20th the 5 targets in mini storage
have been moved to the F-308s, those F-308s
have since been moved to the hot cell ante
  
  219   Tuesday, December 04, 2012, 13:27 Travis CaveITEStandard OperationTM4UCx#5module move & electrical checkTM#4 with UC#5 has been moved from east
target station to the south hot cell move
went well.  Also the electrical check
 UC#5_SIS_Post_beam.PDF 
  224   Thursday, December 06, 2012, 08:57 Travis CaveSpent Target VaultStandard Operation UCx#5Spent target moveUCx #5 has been moved from the south hot
cell to the storage vault. It is in Pail
102, in spot 2A of the vault and had a field
 Vault_Storage_December_6_2012.pdf 
  227   Tuesday, January 08, 2013, 08:48 Travis CaveSouth Hot-CellStandard OperationTM1TiC#3Electrical checkTM#1 with TiC #3 post beam. See attached
PDF for results.
 TiC#3_Elec_Check_Post_beam.PDF 
  228   Tuesday, January 08, 2013, 14:18 Travis CaveSouth Hot-CellStandard OperationTM1no targetElectrical checkTM#1 was electrically check with out a
target see attached PDF for results.
 TM#1_no_tgt_Jan_8_2013.PDF 