ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
33
|
Monday, October 03, 2011, 11:54 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx#2 - TaC#1 | Target change UCx#2-TaC#1 | UCx#2 has been removed from Tm1 and put
in a bucket with a slow argon feed and a
lid placed lossely on top. |
|
21
|
Thursday, August 18, 2011, 14:09 |
Bevan Moss | South Hot-Cell | Standard Operation | TM1 | UCx#2 | Leak and Electrical Check plus Remote Move to Conditioning Station | TM1 with UC#2 had the target installed,
the heat shield line was pumped on and achieved
a vacuum of 0.0 x 10^-4 Torr and a leak |
|
22
|
Thursday, August 18, 2011, 16:07 |
Bevan Moss | Conditioning Station | Standard Operation | TM1 | UCx#2 | Pump Down | Pump down in the conditioning station
started at ~2:40 for rough down. The turbo
pumps were turned on at ~3:30 and at 3:52 |
|
23
|
Friday, August 19, 2011, 14:52 |
Bevan Moss | Conditioning Station | Repair | TM1 | UCx#2 | Leak Check | A
leak check was performed on the module when
it was in the conditioning station today. |
|
24
|
Wednesday, August 24, 2011, 16:35 |
Bevan Moss | South Hot-Cell | Repair | TM1 | UCx#2 | Move, inspection and repair | On August 22nd TM1 was vented with
Argon in the conditioning station. It had
been pumping with just the roughing pump |
|
25
|
Wednesday, August 24, 2011, 17:11 |
Bevan Moss | Conditioning Station | Standard Operation | TM1 | UCx#2 | Leak Check, HV conditioning and Module Move | Today a leak check on TM1's external seals
and the heat shield line was completed by
David Wang. After 16 hours of the turbo pumps |
|
26
|
Thursday, September 01, 2011, 09:11 |
Don Jackson | ITW | Standard Operation | TM1 | UCx#2 | Argon Venting West Station | West target station is setup to use argon
for tank venting. There is 1200 PSI
remaining on argon bottle in electrical room. |
|
32
|
Monday, October 03, 2011, 11:00 |
Travis Cave | ITW | Standard Operation | TM1 | UCx#2 | Move from west station to south hot cell | TM#1 with UCx#2 has been moved from the
west station to the south hot cell. Move
went well. |
|
36
|
Wednesday, October 05, 2011, 09:41 |
Travis Cave | Spent Target Vault | Standard Operation | | UCx#2 | Spent target move | The spent UCx #2 target has been moved
into storage. It was placed in tray 5A and
is in Pail #91, it was 8.91mSv/hr upon removal |
|
1469
|
Tuesday, March 28, 2017, 10:44 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UCx#19 | UCx#19 Installed | UCx#19 has been installed onto TM4. High
current fasteners torqued to 130 in lbs.
Has been leak and electrical checked and |
|
970
|
Tuesday, June 30, 2015, 12:37 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx#12 | UCx #12 Removal | UCx#12 has been removed from TM1 and placed
in a pail with argon.
Right leg (B) of target is clearly |
|
793
|
Wednesday, November 19, 2014, 08:49 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UCx#11 | Ta#44 Removed Ucx#11 Installed | Ta#44 has been removed from TM4 and UCx#11
has been installed and is ready for testing.
New fasteners were installed for |
|
2527
|
Monday, January 22, 2024, 10:16 |
David Wang | ITE | Standard Operation | TM4 | UCx# | Tm4 waterlines helium pressure test and TM service cap helium leak check. | Tm4 waterlines helium pressure test and
TM service cap helium leak check was done
last Friday. All water lines were pressurized |
|
2120
|
Monday, July 06, 2020, 07:54 |
David Wang | ITE | Standard Operation | TM4 | UCx 30 | TM4 has been connected in ITE connection | TM4 has been connected in ITE. Vacuum pumping
down is good so far. |
|
2018
|
Wednesday, October 30, 2019, 11:18 |
David Wang | ITW | Standard Operation | TM4 | UCx 29 | UCx 29 connection checklist | See attachment |
|
2057
|
Monday, February 03, 2020, 09:14 |
David Wang | ITW | Standard Operation | TM4 | UCx 29 | TM4 UCx 29 disconnection checklist | TM4 has been disconnected in ITW. See attachment
checklist. |
|
2062
|
Wednesday, February 05, 2020, 11:03 |
David Wang | South Hot-Cell | Standard Operation | TM4 | UCx 29 | UCx 29 post run electrical check | UCx 29 TM4 post run electrical check is
done before target is removed. Everything
is normal on measurements. |
|
1836
|
Tuesday, December 04, 2018, 12:36 |
David Wang | ITE | Standard Operation | TM4 | UCx 26. | TM4 has been connected in ITE/ Checklist. | TM4 has been connected in ITE. See attachment
for connection checklist |
|
1815
|
Thursday, November 01, 2018, 11:42 |
David Wang | Conditioning Station | Standard Operation | TM2 | UCx 25. | TM2 HS line helium pressure test at TCS and helium spray at SHC.. | Chad and I did leak check on TM2
HS line at SHC yesterday. Base LR 0.0XE-9
atm.cc/sec. No response on LD. |
|
1775
|
Tuesday, September 04, 2018, 08:18 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx 24# | Stppped TM4 and TCS vacuum and water system at TCS. | I stopped TM4 and TCS vacuum system at
TCS. TCS and TM4 is venting with argon now. |
|