119
|
Wednesday, June 06, 2012, 14:33 |
David Wang | South Hot-Cell | Standard Operation | TM1 | Ta38 | leak check heat shield circuit | Chad and I did a leak check on heat shield
circuit after target is installed on TM1.The
leak detector pumping down is smooth. The |
|
|
181
|
Tuesday, September 18, 2012, 13:41 |
David Wang | South Hot-Cell | Standard Operation | TM1 | Nb#7 | leak check heat shield circuit | Chad and i did a leak check on TM1 heat
shield circuit with new Nb#7 target installed.
It took about 5 mins pump down the circuit |
|
|
984
|
Wednesday, July 08, 2015, 14:05 |
David Wang | South Hot-Cell | Repair | TM2 | | leak check coil line(R,U) on TM2 at SHC | Chad and I leak checked coil line(R,U)
on TM2 at SHC yesterday. The leak detector
was pumped down to 0.0Xe-9 atm.cc/sec before |
|
|
998
|
Wednesday, July 15, 2015, 11:18 |
David Wang | South Hot-Cell | Repair | TM2 | | leak check coil line(R,U) on TM2 at SHC | Chad and I leak checked the coil 1 circuit(R,U)
after rebuilt coil line is installed on TM2
source tray. The pumping down on the circuit |
 |
|
1689
|
Wednesday, February 28, 2018, 14:47 |
David Wang | ITE | Standard Operation | | | leak check ITE primary and secondary vacuum vessel. | 2018-02-27: Anders and I finished leak
check on ITE primary and second vacuum vessel
seals. LD connected to ITE BV2 valves between. |
|
|
2604
|
Tuesday, June 04, 2024, 11:44 |
Carla Babcock | South Hot-Cell | Development | | empty LP FEBIAD | investigation of cathode short on empty LP FEBIAD | On May 30 Aaron, Chad and I removed the
empty LP FEBIAD target from the SHC into
the anteroom to attempt to find out the source |
|
|
2760
|
Thursday, January 30, 2025, 07:13 |
David Wang | Crane | Standard Operation | | | inspection of target module lifting frames ITA0494-1997-01 and ITA1994-1997-02 | Tom Gauss inspected two target module
lifting frames ITA0494-1997-01 and ITA0494-1997-02
yesterday. He certified the use of these |
|
|
2761
|
Thursday, January 30, 2025, 07:17 |
David Wang | Crane | Standard Operation | | | inspection of target hall crane below hook attachment pins and plates ITA6550-01. | Tom Kauss inspected target hall crane below
hook attachment pins and plates ITA6550-01
yesterday. He certified the use of these |
|
|
492
|
Sunday, October 06, 2013, 00:17 |
Friedhelm Ames | Conditioning Station | Standard Operation | TM3 | NiO#2 | high voltage conditioning | high voltage conditioning was carried out
over the day up to 24 kV. i will leave it
at 20 kV over night. Current is at 22 micro |
|
|
2547
|
Friday, February 16, 2024, 11:48 |
David Wang | Cooling | Maintenance | | | high active water transferr to holding tank | 100 liters of high active water from HALCW
system( mostly from s-tank and pipe lines
closing to pumps) are transferred to holding |
|
|
2559
|
Thursday, April 04, 2024, 13:10 |
David Wang | Cooling | Maintenance | | | high active water refurbishment, reinstallation, and test operation. | both high active pumps ITC:MP1 and MP2
are refurbished by RH group Maico and Peter.
Pumps have been installed back to system |
|
|
2306
|
Wednesday, February 16, 2022, 15:19 |
Frank Song | Cooling | Repair | | | high active cooling water valves repaired/replaced | A 3/8 inch drain valve on return
cooling line was replaced in ITE. In the
meantime two 1/2 inch valves labeled FEBIAD |
   |
|
294
|
Thursday, April 11, 2013, 07:18 |
David Wang | Conditioning Station | Maintenance | TM1 | Ta#29 | helium pressure tested all water lines in TM1 at CS | On April 08th, all water lines in TM1 had
been helium pressure tested(70psi) at conditioning
station. No leak had been found. |
|
|
109
|
Tuesday, May 22, 2012, 10:00 |
David Wang | Conditioning Station | Standard Operation | TM4 | sic 27 | helium pressure test on heat shield circuit | I did a helium pressure test on heat shield
circuit. The leak detector is concected to
the TM4 primary vacuum system.The IG1 is |
|
|
2285
|
Thursday, January 06, 2022, 13:54 |
David Wang | ITE | Standard Operation | TM4 | | helium pressure test on TM4 internal cooloing lsine at ITE. | Helium pressure 70 psi. 3 minutes on each
circle untill LR on LD is balanced. Base
leak rate on LD:0.0xE-9 atm.cc/sec. |
|
|
728
|
Friday, August 08, 2014, 08:47 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx #10 | helium pressure test on TM4 HS water line at CS. | Helium pressure test on TM4 HS water line
at CS is finished. 80psi helium no leak. |
   |
|
2340
|
Thursday, June 23, 2022, 13:04 |
David Wang | Conditioning Station | Standard Operation | TM4 | Ta#64 | helium pressure test on TM4 HS line. | With Ta#64 installed , TM4 HS line was
helium pressure tested at TCS. base leak
rate is 0.0XE-9 atm.cc/sec. HS line tested |
|
|
2277
|
Thursday, November 25, 2021, 10:33 |
David Wang | Conditioning Station | Standard Operation | TM4 | Ta#63. | helium pressure test on TM4 HS line at TCS. | Helium pressure test on TM4 HS line at
TCS is done. LD base leak rate 0.0
xE-9 atm.cc/sec. Helium pressure 70psi. HS |
|
|
716
|
Monday, July 28, 2014, 14:37 |
David Wang | Conditioning Station | Development | TM2 | | helium pressure test on TM2 tube heater +(D)and -(C)water lines. |
TM2 installed in Conditioning
Station
Varian Leak detector
connected directly to Target Module 2 |
7x |
|
601
|
Monday, February 17, 2014, 09:32 |
David Wang | Conditioning Station | Repair | TM2 | | helium pressure test on TM2 tube heater +(D) water line. | I did the helium pressure test on Tube
heater+ line this morning. The vacuum on
CS and TM2 are very good. The base lake rate |
6x |