  984   Wednesday, July 08, 2015, 14:05 David WangSouth Hot-CellRepairTM2 leak check coil line(R,U) on TM2 at SHC Chad and I leak checked coil line(R,U)
on TM2 at SHC yesterday. The leak detector
was pumped down to 0.0Xe-9 atm.cc/sec before
  
  998   Wednesday, July 15, 2015, 11:18 David WangSouth Hot-CellRepairTM2 leak check coil line(R,U) on TM2 at SHCChad and I leak checked the coil 1 circuit(R,U)
after rebuilt coil line is installed on TM2
source tray. The pumping down on the circuit
 007.JPG008.JPG 
  1689   Wednesday, February 28, 2018, 14:47 David WangITEStandard Operation  leak check ITE primary and secondary vacuum vessel.2018-02-27: Anders and I finished leak
check on ITE primary and second vacuum vessel
seals. LD connected to ITE BV2 valves between.
  
  2604   Tuesday, June 04, 2024, 11:44 Carla BabcockSouth Hot-CellDevelopment empty LP FEBIADinvestigation of cathode short on empty LP FEBIADOn May 30 Aaron, Chad and I removed the
empty LP FEBIAD target from the SHC into
the anteroom to attempt to find out the source
 MicrosoftTeams-image_(58).png 
  2760   Thursday, January 30, 2025, 07:13 David WangCraneStandard Operation  inspection of target module lifting frames ITA0494-1997-01 and ITA1994-1997-02Tom  Gauss inspected  two target module
lifting frames ITA0494-1997-01   and  ITA0494-1997-02
yesterday. He certified the use of these
  
  2761   Thursday, January 30, 2025, 07:17 David WangCraneStandard Operation  inspection of target hall crane below hook attachment pins and plates ITA6550-01.Tom Kauss inspected target hall crane below
hook attachment pins and    plates ITA6550-01
yesterday. He certified the use of these
  
  492   Sunday, October 06, 2013, 00:17 Friedhelm AmesConditioning StationStandard OperationTM3NiO#2high voltage conditioninghigh voltage conditioning was carried out
over the day up to 24 kV. i will leave it
at 20 kV over night. Current is at 22 micro
  
  2547   Friday, February 16, 2024, 11:48 David WangCoolingMaintenance  high active water transferr to holding tank100 liters of high active water from HALCW
system( mostly from s-tank and pipe lines
closing to pumps) are transferred to holding
  
  2559   Thursday, April 04, 2024, 13:10 David WangCoolingMaintenance  high active water refurbishment, reinstallation, and test operation. both high active pumps ITC:MP1 and MP2
are refurbished by RH group Maico and Peter.
Pumps have been installed back to system
  
  2306   Wednesday, February 16, 2022, 15:19 Frank SongCoolingRepair  high active cooling water valves repaired/replaced A 3/8 inch drain valve on return
cooling line was replaced in ITE. In the
meantime two 1/2 inch valves labeled FEBIAD
 RETURN_drain_valve_in_ITE.jpgFEBIAD_COIL_in_ITW.jpgENTRANCE_COLLIMATOR_RETURN_in_ITW.jpgMAIN_S_and_R_VALVES_in_ITW.jpg 
  294   Thursday, April 11, 2013, 07:18 David WangConditioning StationMaintenanceTM1Ta#29helium pressure tested all water lines in TM1 at CSOn April 08th, all water lines in TM1 had
been helium pressure tested(70psi) at conditioning
station. No leak had been found.
  
  109   Tuesday, May 22, 2012, 10:00 David WangConditioning StationStandard OperationTM4sic 27helium pressure test on heat shield circuitI did a helium pressure test on heat shield
circuit. The leak detector is concected to
the TM4 primary vacuum system.The IG1 is
  
  2285   Thursday, January 06, 2022, 13:54 David WangITEStandard OperationTM4 helium pressure test on TM4 internal cooloing lsine at ITE.Helium pressure 70 psi. 3 minutes on each
circle untill LR on LD is balanced. Base
leak rate on LD:0.0xE-9 atm.cc/sec.  
  
  728   Friday, August 08, 2014, 08:47 David WangConditioning StationStandard OperationTM4UCx #10helium pressure test on TM4 HS water line at CS.Helium pressure test on TM4 HS water line
at CS is finished. 80psi helium no leak. 
 015.JPG012.JPG016.JPG014.JPG 
  2340   Thursday, June 23, 2022, 13:04 David WangConditioning StationStandard OperationTM4Ta#64helium pressure test on TM4 HS line. With Ta#64 installed , TM4 HS line was
helium pressure tested at TCS. base leak
rate is 0.0XE-9 atm.cc/sec. HS line tested
  
  2277   Thursday, November 25, 2021, 10:33 David WangConditioning StationStandard OperationTM4Ta#63. helium pressure test on TM4 HS line at TCS. Helium pressure test on TM4 HS line at
TCS is done.  LD base leak rate 0.0
xE-9 atm.cc/sec. Helium pressure 70psi. HS
  
  716   Monday, July 28, 2014, 14:37 David WangConditioning StationDevelopmentTM2 helium pressure test on TM2 tube heater +(D)and -(C)water lines.
    TM2 installed in Conditioning
Station
    Varian Leak detector
connected directly to Target Module 2   
 7x 
  601   Monday, February 17, 2014, 09:32 David WangConditioning StationRepairTM2 helium pressure test on TM2 tube heater +(D) water line.I did the helium pressure test on Tube
heater+ line this morning. The  vacuum on
CS and TM2 are very good. The base lake rate
 6x 
  814   Friday, December 05, 2014, 11:58 David WangConditioning StationDevelopmentTM2 helium pressure test on TM2 tube heater +(D) water lines.At CS, The leak detector is hooked directly
to the TM2 top service cap. The base LR 0.0xE-9
atm.cc/sec, base pressure 0.0xE-4torr. Applied
 6x 
  710   Monday, July 21, 2014, 13:11 David WangConditioning StationStandard OperationTM1 helium pressure test on TM1 HS water line at CS.The TM1 HS line is  pressure tested
this morning with 70 psi helium  at
CS. No response has been found on leak detector.
  