2528
|
Monday, January 22, 2024, 14:12 |
Frank Song | ITE | Standard Operation | TM4 | UCx#43 | module disconnection |
TM4 with spent target UCx#43 was disconnected in ITE and is ready moved to SHC. see attachment pls. |
2610
|
Friday, June 14, 2024, 11:18 |
Frank Song | ITE | Standard Operation | TM3 | UCx#44 | module disconnection |
TM3 with target UCx#44 was disconnected in ITE. |
2631
|
Thursday, July 04, 2024, 11:45 |
Frank Song | ITW | Standard Operation | TM4 | UCx#45 | module disconnection |
TM4 with spent target UCx#45 was disconnected in ITW and moved to SHC.
TM4 move from ITW to SHC is smooth. |
2646
|
Tuesday, August 06, 2024, 09:16 |
Frank Song | ITE | Standard Operation | TM3 | SiC#46 | module disconnection |
TM3 with spent target SiC#46 was disconnected in ITE and ready to move to TCS soon. |
2649
|
Friday, August 09, 2024, 08:11 |
Frank Song | ITW | Standard Operation | TM4 | TiC#7 | module disconnection |
TM4 with spent target TiC#7 (dead) was disconnected in ITW and ready to move to TCS. |
2671
|
Tuesday, August 27, 2024, 13:30 |
Frank Song | ITW | Maintenance | TM3 | TiC#8 | module disconnection |
TM3 is disconnected and all water lines are purged/refilled with 50psi Nitrogen. Pls see pics attached with. |
2695
|
Tuesday, October 01, 2024, 09:16 |
Frank Song | ITE | Standard Operation | TM2 | Ta#67 | module disconnection |
TM2 with spent target Ta#67 was disconnected in ITE. see attachment pls. |
2710
|
Tuesday, November 05, 2024, 09:49 |
Frank Song | ITW | Standard Operation | TM4 | TiC#9 | module disconnection |
TM4 with spent target TiC#9 was disconnected in 29-10-2024 and it is being moved from ITW to SHC. |
2725
|
Tuesday, December 03, 2024, 10:10 |
Frank Song | ITE | Standard Operation | TM2 | Ta#68 | module disconnection |
TM2 with spent target TA#68 was disconnected in ITE and is being moved to SHC. All water lines are purged for module storage. |
2741
|
Monday, January 06, 2025, 08:38 |
Frank Song | ITW | Standard Operation | TM4 | UCx#46 | module disconnection |
TM4 WITH UCx#46 was disconnected in 2025-01-02 in ITW. Forms attached. |
2747
|
Monday, January 13, 2025, 10:36 |
Frank Song | ITE | Standard Operation | TM3 | UCx#47 | module disconnection |
TM3 with spent target UCx#47 was disconnected in ITE and will be moved to SHC. |
2813
|
Tuesday, June 17, 2025, 11:58 |
Frank Song | ITE | Standard Operation | TM4 | UC#48 | module disconnection |
TM4 with spent target UC#48 was disconnected ang moved from ITE to NHC. see attachment pls. |
638
|
Friday, April 04, 2014, 14:59 |
Keith C Ng | ITE | Maintenance | | | measurement of new beam tube section |
R. Kuramoto and A. Laxdal measured the distance from the 2A tunnel to the tank flange of ITE. The new fabricated beam pipe with bellows was used to gauge the distance to the tank flange; The flange face of the beam tube was butted up to the tank flange and the beam tube was marked at the plane of the wall. A metal rod was used to gauge the distance to the tank face using the same method.
From the inside of the tunnel wall:
- To tank flange: 45 5/16"
- To ITE vacuum tank face: 49"
See attached PDF. |
968
|
Tuesday, June 30, 2015, 09:47 |
chad fisher | South Hot-Cell | Repair | | | manipulator repair |
The right hand manipulator has been repaired. It took 43 minutes and I received ~ 0.56 mSv |
1579
|
Monday, July 10, 2017, 09:09 |
Dan McDonald | North Hot-Cell | Repair | | | manipulator cart repair |
A hydraulic leak was found on the manipulator install and repair cart, upon further investigation the cause was a faulty cylinder. Once the cylinder was removed and disassembled the inner bore was found to be scored beyond repair. Another point of interest was that the rod was painted to the point that when retracted it compromised the rod seal causing the cylinder to leak. attached are photos outlining the issues. new cylinders are being sourced and will be installed upon arrival. We have found that there is interaction between the tops of the cylinders and the bed of the cart when fully retracted and compressed, this might require some modifications to ensure proper operation in the future.
|
2442
|
Friday, May 19, 2023, 09:39 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | TiC#6 | leak/electrical check |
TM2 with TiC#6 was checked on SHC, see pic attached pls. |
967
|
Monday, June 29, 2015, 10:51 |
David Wang | Conditioning Station | Repair | TM2 | | leak on TM2 side panel |
There is an air to vacuum leak on TM2 service cap side panel which we moved out during the TM2 wiring job. The CS pumps are stopped now. The CS will be vented soon. The seal on this panel has to been changed.
2016-06-30. The o-ring seal on this panel(PNG1 and steerers) is replaced and leak checked. No leak now. |
972
|
Tuesday, June 30, 2015, 15:53 |
David Wang | Conditioning Station | Development | TM2 | | leak on TM2 at CS |
I leak checked TM2 at CS this afternoon which including air to vacuum check on service cap and helium pressure test on water lines. There is a small leak on water line R ,U (COIL1) during the helium pressure test.. Below 20 psi helium, there is no leak on it. But , once the helium pressure is increased over 20 psi, it showed up on Leak Detector. At 60 psi helium, the leak rate is 9.4xE-9 atm.cc/sec. For detail information, See attachment. All other water lines and air to vacuum seals are good. |
107
|
Friday, May 18, 2012, 08:37 |
David Wang | South Hot-Cell | Standard Operation | TM4 | sic 27 | leak check on heat shield circuit |
Chad and I leak checked the heat shield circuit after sic 27 target installed. It took 20minutes to pump down the circuit to the leak detector bottom scales. The leak detector is calibrated today,and all the vacuum lines and connections are leak checked by spraying helium. Chad sprayed helium to each vc fittings for 2 seconds. There is no any response on leak detector . The test repeated one time and the result is same. Chad flushed helium around the target for 10 second .This time leak detector also have no respone. The heat shield circuit is leak tight at this stage . We will move TM4 to conditioning station and pressure helium test the circuit. |
139
|
Wednesday, July 04, 2012, 13:18 |
David Wang | Conditioning Station | Standard Operation | TM4 | uo#3 | leak check on heat shield circuit |
Chad and I leak checked the heat shield circuit after uc#3target installed. It took 5minutes to pump down the circuit to the leak detector bottom scales. All the vacuum lines and connections are leak checked by spraying helium. Chad sprayed helium to each vcr fittings for 2 seconds. There is no any response on leak detector . The test repeated one time and the result is same. The heat shield circuit is leak tight at this stage . We will move TM4 to conditioning station and pressure helium test the circuit.
|
|