Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC, Page 140 of 140
Not logged in
Back
|
Find
|
Select
|
Help
|
Login
Full
| Summary |
Threaded
2783 Entries
Goto page
Previous
1
,
2
,
3
...
138
,
139
, 140
Selected entries:
ID
Date
Author
Category
Type
Module
Target/Number
Subject
Text
2719
Thursday, November 21, 2024, 14:11
Frank Song
5 Shielding Blocks
Standard Operation
TM4
UCx#46
shielding blocks transfer
Shielding blocks have been moved
from ITE to ITW and MAA is secured.
2735
Monday, December 09, 2024, 13:10
Frank Song
5 Shielding Blocks
Standard Operation
TM3
UCx#47
shielding blocks transfer
5 Shielding Blocks have been transferred
from ITW to ITE. MAA is secured after moving.
2740
Friday, January 03, 2025, 12:34
Frank Song
5 Shielding Blocks
Maintenance
UCx#47
shielding blocks moving
Five shielding blocks are moved from
ITE to storage area ( one of them is sitting
on B2 as limit of room) for target stations
Goto page
Previous
1
,
2
,
3
...
138
,
139
, 140
ELOG V2.9.2-2455